Discusses Closure of CAL-3-97-02,CAL-3-97-02A & CAL-3-97-02B & NRC Manual Chapter 0350 Restart Action Plan for Zion Station
ML20249B212
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/15/1998
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
References
CAL-3-97-02, CAL-3-97-02A, CAL-3-97-02B, CAL-3-97-2, CAL-3-97-2A, CAL-3-97-2B, NUDOCS 9806220180
Download: ML20249B212 (5)


Text

_ _ _ _ - - _ _ _ - _ _ _ -

f

.pp :s%

j ,,

UNITED STATES NUCLEAR REEULATORY COMMI SION l [ '

o REGION 111 i y E 801 WARRENVILLE ROAD 2 LISLE. ILLINOIS 60532-4351

  • . g + June 15, 1998 l

l Mr. Oliver D. Kingsley President, Nuclear Generation Group Commonwealth Edison Company ATTN: Regulatory Services l

Executive Towers West ll1 1400 Opus Place, Suite 500 Downers Grove, IL 60515

SUBJECT:

CLOSURE OF CONFIRMATORY ACTION LETTER Rlll-97-002, CONFIRMATORY ACTION LETTER SUPPLEMENTS Rlll-97-002A AND Rlli-97-002B, AND NRC MANUAL CHAPTER 0350 RESTART ACTION PLAN FOR THE ZION STATION

Dear Mr. Kingsley:

On February 25, April 14, and June 6,1997, the NRC issued Confirmatory Action Letter (CAL) Rlll-97-002, and CAL Supplements Rlll-97-002A and Rlll-97-0028, respectively. The CAL and CAL supplements were issued to formalize your commitments to: 1) take specific actions in response to the February 1997 reactivity event; 2) implement actions to address fundamental performance issues; 3) resolve several specific equipment material condition issues pertinent to a plant restart decision; and 4) inform the NRC of your corrective actions prior to plant restart.

On September 12,1997, the NRC issued the Manual Chapter 0350 Restart Action Plan which defined and formalized the process the NRC intended to use to assess the readiness to restart Zion Station Units 1 and 2. In accordance with 10 CFR 50.82, you certified by letters to the NRC l the permanent cessation of operations at the Zion Station and the permanent remoial of fuel  ;

from both reactors on February 13 and March 9,1998, respectively. j Based upon the 10 CFR 50.82 certifications, the NRC staff reviewed the issues included in CAL Rlll-97-002, CAL Supplements Rlll-97-002A and Rill-97-0028, and the Restart Action Plan to determine if a need exists for continued use of these regulatory processes for a permanently shut down facility. We considered plant processes and performance assessment with Zion Station permanently shut down and defueled to be considerably different from those at an operating plant. Therefore, continued NRC monitoring of Zion Station performance issues using these existing regulatory processes is unwarranted. We will, however, assess the adequacy of /

your revised programs and management activities during our review of your decommissioning D I

plans and inspections conducted under NRC Manual Chapter 2561, " Decommissioning Power Reactor Inspection Program." Any corresponding open issues allegation management system will continue to be addressed through that process. g/currentl g

in addition, the CAL, CAL supplements, and Restart Action Plan also described several specific technical issues which involved equipment material condition and that could apply to a permanently shut down Zion Station. A final determination of the continued applicability of these technical issues to Zion Station is dependent upon your staff's identification and subsequent NRC staff review of those systems and components that will be relied upon to support a decommissioning status.

9806220100 980615 PDR ADOCK 05000295 P PDR

O. Kingsley The NRC is tracking your actions for each of these technicalissues as a part of the NRC inspection followup system for the Zion Station. Continued tracking of these technicalissues using the CAL, CAL supplements, and Restart Action Plan is not necessary.

Therefore, by this correspondence, we are informing you of our decision to close CAL Rlil-97-002, CAL Supplements Rlil-97-002A and Rill-97-0028, and the NRC Manual Chapter 0350 Restart Action Plan for Zion Station. In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC Public Document Room.

Sincerely, Original signed by Carl J. Paperiello Acting Regional Administrator Docket Nos.: 50-295; 50-304 See Attached Distribution DOCUMENT NAME: G:\ zion \zioclos.2 SEE PREVIOUS CONCURRENCES To receive a copy of thle document, Indicate in the bos 'C' = Copy without attachment / enclosure *E* = Copy with attachment / enclosure

  • N* = No copy OFFICE Rlll Rill Rlil Rill NAME' Hills:dp Falevits Jorgensen Clayton DATE 04/ /98 04/ /98 04/ /98 04/ /98 mummmmmmmmmmmune mums summmmmmmmma muu ----- -

muun mum OFFICE Rlli Rlli NRR Rllig, NAME Grobo Grant Richards Pdptin ello DATE 04/ /98 04/ /98 04//98 06/[h98 OFFICIAL RECORD COPY

~

O. Kingsley .The NRC is tracking your actions for each of these technicalissues as a part of the NRC inspection followup system for the Zion Station. Continued tracking of these technicalissues using the CAL, CAL supplements, and Restart Action Plan is not necessary._

Therefore, by this correspondence, we are informing you of our decision to close CAL Rlli-97-002, CAL Supplements Rlli-97-002A and Rlll-97-002B, and the NRC Manual Chapter 0350 Restart Action Plan for Zion Station. In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will be placed in the NRC Public Document Room.-

Sincerely, A. Bill Beach Regional Administrator Docket Nos.: 50-295;50-304 See Attached Distribution DOCUMENT NAME: G:\ zion \zioclos.2 To receive e copy of ttde docuenent, Indicate in the bon 'C' = copy without ettechment/ enclosure "E* = Copy with attachment /encloswa

  • N* = No enpy OFFICE Rill jf Rlli y Rlli C. Rlll c.

NAME Hills:dp od Falevits g Jorgensen #g Clayton jft DATE. 04/1798 04R$98 04/2A98 M 04/498 l OFFICE /d , 6 Rill! A b Rlli NRR M y zf~ Rlli [

NAME I 6Mem Grob [ Grant hp Richards pYA A Beach DATEL/NN 04MO Ohhh 0[/3/98'- 04/ /98 l OFFICIAL RECORD COPY

(

e' _ -- -

-j- A a

O. Kingsley' -

5 i

- cc: M. Wallace, Senior Vice President' D. Helwig, Senior Vice President G. Stanley, PWR Vice President

'J. Perry, BWR Vice President D. Farrar, Regulatory -

Services Manager -

1. Johnson, Ucensing Director:

DCD - Ucensing

'J. Brons, Site Vice President

- R. Starkey, Plant General Manager R. Godley, Regubtory Assurance Supervisor R. Hubbard

- N. Schloss, Economist Office of the Attomey General Mayor, City of Zion State Uaison Officer State Liaison Offi:er, Wisconsin Chairman, Illinois Commerce Commission Distribution:

J. Callan, EDO H. Thompson, DEDR

_ T. Hiltz, OEDO J. Ueberman, OE J. Goldberg, OGC S. Collins, NRR B. Boger, NRR E. Adensam, NRR

- SAR (E-Mail)

Project Mgr.; NRR C. Paperiello, Rlli J. Caldwell, Rill B. Clayton, Rill SRI Zion DRP-

.TSS DRS (2)

RlliPRR' PUBLIC IE-p Docket Filar GREENS l

l l-s 22000G L