ML20236J987
Text
.
MA nOCS NRC FORM 4#
^ti U.S. NUCLEAR REGULATORY COMMISSION RESPONSE NUMBER FOIA/PA 98-155 I
RESPONSE TO FREEDOM CF a
S
=
INFORMATION ACT(FO!A)/ PRWACY
RESPONSE
k*...+/
ACT (PA) REQUEST TYPE Q FINAL i PARTIAL l
l REQUESTER DATE Ms. Karen Unnerstall M 2 4 SW PART 4. -INFORMATION RELEASED (See checked boxes)
[ No additional agency records subject to the request have been located.
] Requested records are available through another public distribution program. See Comments section.
FAPPENDICES Agency records subject to the request that are identified in ther 1 sted appandices are already available for A
public inspection and copying at the NRC Public Document Room.
TAPPENDICES r-Agency records subject to the request that are identified in the listed appendices are being made available for B
public inspection and copying at the NRC Public Document Room.
'Q Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Ducument Room,2120 L Street, NW, Washington, DC.
M Agency records subject to the request are enclosed.
R Records subject to the request that contain information originated by or of interest to another Federal agency have been
" referred to that agency (see comments section) for a disclosure determination and direct response to you.
] We are continuing to process your request.
Q This completes NRC's action on your request.
PART 1.A - FEES p
TAucuNT *~ - P You will be billed by NRC for the amount listed.
E None. Minimum fee threshold not met.
a
{ 119.51 Q You will receive a refund for the amount listed.
~
Fees waived.
==
PART l.B -INFORMATION NOT LOCATED OR WITHHIILD FROM DISCLOSURE
[] No agency records subject to the request have been located.
E Certain information in the requested records is Deing withheY from disclosure pursuant to the exemptions described in and for
- the reasons stated in Part 11.
R This determination may be appealed within 30 days by wnting to the FOIA/PA Officer, U.S. Nuclear Regu'atory Commission, Washington, DC 20555-0001. Clearly state on the envelope and in the letter that it is a *FOIA/PA Appeal."
PART l.C COMMENT 5 (Use attached Comments continuation page if required)
The actual fees for the processing of your req / pace = $90.60 O
uest are:
Duplication 453 paaes @ $0.20 l
Clerical Search 40 hrs. @ $17.39 per hr. = $695.56 Cleric:1 Review 3 hrs. @ $17.39 per hr. - 52.17 Professional Review -
1I hrs. @ $35.67 per hr. = $392.37 Tot:1 51,230.70
\\.[
Received 1,350.21 Refund $ 119.51 n
( MGNATUHF RE E ' C5 IlON Ag1 D flVA ACT OF FICER.
sskil ell
/
9007090100 900624 PDR FOIA UNNERST98-155 PDR NRC FORM 464 Pan 1 (3-1998)
PRINTED ON RECYCLED PAPER This form was designed using inf orms
-_$U N 9 D/(b
b FOIA 98-155 APPENDIX A l
RECORDS ALREADY AVAILABLE IN THE PUBLIC DOCUMENT ROOM ACCESSION NQ DATE NUMBER DESCRIPTION l
1.
6/27/91 9109130071 Responds to Request for documents re NUREG/BR-011 re " Books of TS Interpretations Already Perfomred at Plants."
listed in App. A (147 pages) 2.
09/1/95 9509060256 Letter to Mr. J. Knubel, GPU Nuclear Corp. from R.
W. Heman, NRC,
Subject:
THREE MILE ISLAND NUCLEAR STATION, UNIT 1 (TMI-1)- REVIEW OF 11R REFUELING OUTAGE STEAM GENERATOR INSPECTION PLAN (4 pages) 3.
05/22/96 9605210198 Memo from C. H. Berlinger, NRC to E. V. Imbro, NRC,
Subject:
RESPONSE TO REGION ll TIA 94-031 (4 pages) 4 02/24/98 9803030216 Letter to Mr. W. R. McCo!!um, Duke Energy Corporation, from D. E. LaBarge, NRC
Subject:
STEAM GENERATOR TUBING SURVEILLANCE REQURIEMENTS TECHNICAL SPECIFICATION INTERPRETATION - OCONEE NUCLEAR STATON UNITS 1,2, AND 3 (3 pages)
FOIA 98-155 APPENDIX B RECORDS BEING RELEASED IN THEIR ENTIRETY NQ DATE DESCRIPTION 1.
0A!19/91 Memo from F. Rosa, NRC, to S. T. Hoffman, NRC,
Subject:
REQUEST FOR ASSISTANCE INVOLVING FARLEY TECHNICAL SPECIFICATIONS 3.8.1.1 AND 3.0.5 (TIA NO. 91-04 (2 pages) l 2.
08/16/91 Memo from C. E. Rossi, NRC to W. T. Russell, NRC,
Subject:
RHR OPERABILITY REQUIREMENTS DURING SHUTDOWN j
(71 pages) l
{
3.
09/11/91 Letter to Mr. P. J. North, Duke Power from C. l. Grimes, Chief,
- NRC,
Subject:
CLARIFICATION OF THE NRC POSITION ON REACTOR VESSEL LEVEL INSTRUMENTATION IN THE REVISED STANDARD TECHNICAL SPECIFICATIONS (5 pages) l l
4.
12/31/91 Memo from C. l. Grimes, NRC, to P Bor hnert, NRC,
Subject:
MONITORING AND LIMITATIC NS FOR RCS LEAKAGE OUTSIDE CONTAINMENT (10 pages) l S.
01/17/92 Memo from C. l. Grimes, NRC, to F.. L. Baer, NRC,
Subject:
GENERIC SAFETY ISSU'.i 120, "ON LINE TESTABILITY OF PROTECTION SYSTEMS l
(3 pages) 6.
03/09/92 Memo from S. Newberry, NRC to D. B. Matthews, NRC,
Subject:
GENERAL WARNING ALARM REACTOR TRIP IN THE l
WESTINGHOUSE PROTECTION SYSTEM DESIGN (3 pages) 7.
03/24/92 Note to Tom Dunning, NRC from C. Grimes, NRC,
Subject:
CONTROL ROD OPERABILITY AND TECH SPEC POLICIES (9 pages) l 8.
04/02/92 Memo from C. l. Grimes, NRC, to J. Wiggins, R. Jones, NRC,
Subject:
RCS OPERATIONAL LEAKAGE LIMIT (3 pages)
L___
l 2
)
l 9.
04/08/92 Memo from C. E. McCracken, NRC to S. C. Black, NRC,
Subject:
REGION IV'S REQUEST FOR NRR ASSISTANCE REGARDING TECHNICAL SPECIFICATION (TS)
REQUIREMENTS FOR THE SURVEILLANCE OF FUEL BUILDING INTEGRITY (32 pages) 10.
04/10/92 Memo from C. l. Grimes, NRC, to R. A. Capra, W. R. Butler, J.
F. Stolz, E. G. Adensam, L. B. Marsh, T. R. Quay, Thru: C. E.
Rossi, NRC,
Subject:
OPERABILITY REQUIREMENTS DURING TESTING i
AND REQUIREMENTS FOR ALTERNATE TRAIN TESTING (7 pagenc) 11.
06/22/92 Memo from C. l. Grimes, NRC to H. H. Berkow, NRC, i
Subject:
ST. LUCIE CONTAINMENT VESSEL INTEGRITY (TIA 91-23)
(6 pages) i 12.
12/11/92 Memo from C. Grimes, NRC, from F. Hebdon, NRC,
Subject:
USE OF SHUTDOWN TIMES FOR CORRECTIVE MAINTENANCE (2 pages) 13.
04/16/93 Note to C. Miller, NRC, thru C. Grimes, NRC, from C. Schulten.
- NRC,
Subject:
PEACH BOTTOM UNITS 2 & 3 OPERABILITY ISSUES DURING LOGICAL SYSTEM FUNCTIONAL TESTING (LSFT)
(3 pages) 14.
04/22/93 Memo from C. l. Grimes, NRC, to J. R. Strosnider, NRC,
Subject:
STRUCTURAL INTEGRITY TECHNICAL SPECIFICATIONS (4 pages) 15.
06/03/93 Memo from R. J. Barrett, NRC to G. C. Lainas, NRC
Subject:
RESPONSE TO TIA NO. 93 REQUEST FOR TECHNICAL ASSISTANCE IN DETERMINING REGULATORY BASIS FOR TECHNICAL SPECIFICATIONS 3/4.9.4, REACTOR BUILDING PENETRATIONS FOR SUMMER PLANT (2 pages) l 16.
08/24/93 Memo from R. J. Barrett, NRC to F. J. Hebdon, NRC, l
Subject:
TIA 93-002, SEQUOYAH ICE BASKET WEIGHTS (7 pages) 17.
09/14/93 Memo from G. C. Lainas, NRC to E. W. Merschoff, NRC,
Subject:
RESPONSE TO TIA 93-002; SEQUOYAH ICE BASKET WEIGHTS (2 pages) i l
I
3 18.
10/06/93 Memo from E. G. Adensam, NRC, to K. E. Perkins, NRC,
Subject:
INTERPRETATION OF OPERATIONS WITH THE POTENTIAL FOR DRAINING THE REACTOR VESSEL AT WNP-2 (3 pages) 19.
11/04/93 Memo from C. H. Berlinger, NRC to R. A. Herman, NRC,
Subject:
TASK INTERFACE AGREEMENT (TIA) REQUEST FOR ASSISTANCE IN DETERMINING THE REGULATORY BASIS FOR TESTING MG-6 RELAY AT OCONEE (5 pages) 20.
12/15/93 Letter to Mr. R. G. Byram, Pennsylvania Power and Light Co.
from R. J. Clark, NRC,
Subject:
INTERPRETATION OF TECHNICAL SPECIFICATION 3.3.2, SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 (PLA-4062)
(3 pages) 21.
12/29/93 Memo from G. C. Lainas, NRC to E. W. Merschoff, NRC
Subject:
TASK INTERFACE AGREEMENT (TIA)- NORTH ANNA FACILITY - FAILURE TO TEST CONTAINMENT PURGE BLOWERS (2 pages) 22.
01/13/94 Memo from G. C. Lainas, NRC to E. W. Merschoff, NRC,
Subject:
RESPONSE TO TIA 92-34: REQUEST FOR l
ASSISTANCE IN EVALUATION OF CALIBRATION OF l
l INSTRUMENTATION AND INTERPRETATION OF CHANNEL CALIBRATION AS DEFINED IN TECHNICAL SPECIFICATIONS (2 pages) 23.
07/26/9 %
Memo from C. l. Grimes, NRC to T. R. Quay, NRC,
Subject:
CONTAINMENT WITH POTENTIAL FOR DRAINING THE REACTOR VESSEL (1 page) 24.
08/10/94 Memo from E. G. Adensam, NRC to A. B. Beach, NRC, l
Subject:
RESPONSE TO TASK INTERFACE AGREEMENT (93-l TIA-012)- WNP-2 TESTING OF SUPPRESSION POOL COOLING l
MODE OF RESIDUAL HEAT REMOVAL (RHR) EMERGENCY OPERATING PROCEDURES (EOPs)
(4 pages) 25.
08/31/94 Memo from E. G. Adensam, NRC, to A. B. Beach, NRC
Subject:
TASK INTERFACE AGREEMENT (TIA) 94TIA0009 -
VOLUNTARY ENTRY INTO TECHNICAL SPECIFICATION ALLOWED OUTAGE AND SHUTDOWN TIMES - WOLF CREEK GENERATING STATION (3 pages)
4 26.
11/09/94 Memo from J. A. Zwolinski, NRC to R. W. Cooper, NRC,
Subject:
REQUEST FOR TECHNICAL ASSISTANCE ON INDIAN POINT 2 FIRE PROTECTION TECHNICAL SPECIFICATIONS.
(3 pages) 27.
12/29/94 Memo from H. N. Berkow, NRC to E. W. Merschoff, NRC,
Subject:
TIA 94-012 - DETERMINATION OF EMERGENCY POWER SUPPLY TECHNICAL SPECIFICATION REQUIREMENTS AT OCONEE, UNITS 1,2, AND 3 (8 pages) 28.
07/07/95 Memo from J. A. Calvo, NRC, to D. B. Matthews, NRC
Subject:
REQUEST FOR TECHNICAL ASSISTANCE -
EVALUATION OF H. B. ROBINSON UNIT 2 POSITION PERTAINING TO TECHNICAL SPECIFICATIONS COMPLIANCE AND OPERABILITY OF CHEMICAL AND VOLUME CONTROL SYSTEM (3 pages) i 29.
07/14/95 Memo from D. B. Matthews, NRC to E. W. Merschoff, NRC,
Subject:
TASK INTERFACE AGREEMENT (TIA)95-002 -
REQUEST FOR ASSISTANCE IN THE EVALUATION OF LICENSEE POSITION ON TECHNICAL SPECIFICATION COMPLIANCE AND OPERABILITY OF THE CHEMICAL AND VOLUME CONTROL SYSTEM - H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 (4 pages) 30.
08/28/95 Memo from J. N. Hannon, NRC to W. L. Axelson, NRC,
Subject:
TASK INTERFACE AGREEMENT - FERMI 2 PERFORMANCE OF AN OPERATION WITH THE POTENTIAL TO DRAIN THE REACTOR VESSEL WITH LESS THAN THE MINIMUM A.C. ELECTRICAL POWER SOURCES AVAILABLE.
(3 pages) 31.
07/22/96 Memo from P. F. McKee, NRC to R. W. Cooper, NRC,
Subject:
TASK INTERFACE AGREEMENT EVALUATION REGARDING INSTRUMENT ACCURACY AFFECTING MILLSTONE UNIT 2 (6 pages) 32.
07/29/96 Note from J. F. Williams, NRC to Docket File
Subject:
NRR AND REGION ll STAFF DISCUSSIONS REGARDING INTERPRETATION OF BROWNS FERRY TECHNICAL SPECIFICATIONS (2 pages) l l
O 5
33.
08/05/96 Memo from S. A. Varga, NRC to R. W. Cooper, NRC,
Subject:
TECHNICAL ASSISTANCE REQUEST ON HOPE CREEK TESTING OF AUTOMATIC DEPRESSURIZATION SYSTEM VALVES (6 pages) 34.
08/23/96 Memo from F. P. Gillespie, NRC to Regional Administrators,
- NRC,
Subject:
LICENSEE TECHNICAL SPECIFICATIONS (TS)
INTERPRETATIONS (2 pages) 35.
11/12/96 Memo from C. l. Grimes, NRC to W. H. Bateman, NRC
Subject:
TECHNICAL SPECIFICATION REQUIREMENTS FOR QUADRANT POWER TILT RATIO (3 pages) 36.
11/21/96 Letter to Mr. B. R. Sylvia, Niagara Mohawk Power Corp.
from S. S. Bajwa, NRC
Subject:
TECHNICAL SPECIFICATIONS 3.0.2, NINE MILE POINT NUCLEAR STATION, UNIT 2 (6 pages) 37.
12/03/96 Memo from C. I. Grimes, NRC to J. W. Shea, NRC,
Subject:
REQUEST FOR WRITTEN INTERPRETATION OF TECHNICAL SPECIFICATIONS (3 pages) 38.
12/10/96 Memo from C. l. Grimes, NRC to F. M. Reinhart, NRC,
Subject:
V.C. SUMMER NUCLEAR STATION TECHNICAL SPECIFICATIONS - DEFINITION OF CORE ALTERNATIONS (3 pages) 39.
01/14/97 Memo from C.1. Grimes, NRC to W. D. Beckner, NRC,
Subject:
WATERFORD 3 INTERPRETATION OF SURVEILLANCE REQUIREMENT 4.6.2.2 FOR THE CONTAINMENT AIR COOLERS (4 pages) 40.
01/16/97 Memo from C. l. Grimes, NRC to G. Kelly, NRC,
Subject:
DUANE ARNOLD PHILOSOPHY ON ENTERING LIMITING CONDITIONS FOR OPERATION (LCOs) (AIT 96-0278)
(4 pages) 41.
01/24/97 Memo from R. P. Zimmerman, NRC to J. Lieberman, NRC,
Subject:
REQUEST FOR VIEWS AND INTERPRETATIONS OF REGULATORY REQUIREMENTS (7 pages) l
a e
6 42.
01/30/97 Memo from J. S. Wermiel, NF.C to J. F. Stotz, NRC,
Subject:
TASK INTERFACE AGREEMENT RESPONSE - SCOPE OF TECHNICAL SPECIFICATION REQUIRED CHANNEL FUNCTIONAL TEST AT PEACH BOTTOM (7 pages) 43.
02/12/97 Memo from C.1. Grimes, NRC, to J.1. Zimmerman, NRC,
Subject:
REQUEST FOR WRITTEN INTERPRETATION OF TECHNICAL SPECIFICATIONS (3 pages) 1 44.
02/18/97 Memo from J. S. Wermiel, NRC to J. F. Stotz, NRC,
Subject:
TASK INTERFACE AGREEMENT RESPONSE - SUJr)E OF TECHNICAL SPECIFICATION REQUIRED CHANNEL FUNCTIONAL TEST AT PEACH BOTTOM (8 pages) 45.
03/27/97 E-mail message from C. Grimes, NRC to J.1. Zimmerman, H.
Berkow, J. G. Luehman, Anne Boland, Besty Yeh, NRC, to Linda Watson, NRC,
Subject:
Fariey TS question - Reply (4 pages) 46.
04/07/97 Memo from C. l. Grimes, NRC to R.A. Capra, NRC
Subject:
REQUEST FOR TECHNICAL SPECIFICATION INTERPRETATION ON CONTAINMENT VENT AND DRAIN VALVES AT BRAIDWOOD (4 pages) 47.
04/08/97 Memo from C. l. Grimes, NRC to G. Kelly, NRC
Subject:
SUPPLEMENTAL RESPONSE TO THE TIA CONCERNING TECHNICAL SPECIFICATION PRACTICES AT DUANE ARNOLD (3 pages) 48.
04/09/97 Memo from J. F. Stolz, NRC to C. W. Hehl, NRC
Subject:
TASK INTERFACE AGREEMENT RESPONSE - SCOPE l
OF TECHNICAL SPECIFICATIONS REQUIRED CHANNEL FUNCTIONAL TEST AT PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 (5 pages) 49.
05/02/97 Memo from C. l. Grimes, NRC to J. F. Harold, NRC
Subject:
MANUAL VS. AUTOMATIC OPERATION AS IT RELATES TO AUXILIARY FEEDWATER OPERABILITY AT INDIAN POINT UNIT 2
(? pages) l l
)
l l
7 50.
05/05/97 Memo from C. l. Grimes, NRC to P. D. Milano, NRC
Subject:
INTERPRETATION OF MAINE YANKEE TS REGARDING THE ACCEPTABILITY OF GRAB SAMPLING AS A LEAKAGE DETECTION SYSTEM WITHIN THE MEANING OF TS 3.14 A (4 pages) 51.
07/31/97 Memo from P. S. Tam, to Docket File, NRC
Subject:
CATAWBA UNITS 1 AND 2 - RECORD OF TELEPHONE CONVERSATION REGARDING CORE ALTERATION (1 page) 52.
08/07/97 Memo from J. S. Wermiel, NRC to H. M. Berkow, NRC
Subject:
TASK INTERFACE AGREEMENT (TIA 7-07)
EVALUATION REGARDING REACTOR TRIP AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEMS INSTRUMENTATION SETPOINTS FOR VOGTLE UNITS 1 AND 2 (4 pages) 53.
08/11/97 Memo from W. D. Beckrar, NRC to H. N. Berkow, NRC
Subject:
WORK REQUE.GT DATED AUGUST 4,1997 REQUESTING REVIEW OF A REGION I TASK INTERFACE AGREEMENT (TIA) REGARDING INTERPRETATION OF TECHNICAL SPECIFICATIONS (TS) AT VERMONT YANKEE (2 pages) 54.
08/13/97 Memo from W.D. Beckner, NRC to R. M. Pulsifer, NRC
Subject:
TECHNICAL SPECIFICATION CLARIFICATION AT QUAD CITIES (TIA 97036)
(8 pages) l 55.
08/21/97 Memo from J. A. Calvo, NRC to H. N. Berkow, NRC
Subject:
FARLEY UNITS 1 AND 2 - REQUEST FOR INTERPRETATION OF TECHNICAL SPECIFICATIONS 4.8.1.1.2.e (4 pages) 56.
09/08/97 Memo from W.D. Beckner, NRC to H. N. Berkow, NRC
Subject:
WORK REQUEST DATED AUGUST 4,1998 REQUESTING REVIEW OF A REGION l TASK INTERFACE AGREEMENT (TIA) REGARDING ! INTERPRETATION OF TECHNICAL SPECIFICATIONS (TS) AT VERMONT YANKEE-REVISED RESPONSE (3 pages) l 57.
09/09/97 Memo from R. A. Capra, NRC, to G. Grant, NRC
Subject:
TECHNICAL SPECIFICATION CLARIFICATION AT QUAD CITIES (TlA 97036)
(5 pages) 1
8 58.
09/10/97 Memo from G. Edison, NRC to J. Johnson, NRC
Subject:
CLOSURE OF TIA NO 97-006 REGARDING VESSEL DISASSEMBLY WITHOUT SECONDARY CONTAINMENT INTEGRITY ESTABLISHED - BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 (2 pages) 59.
09/15/97 Memo from J. Wermiel, NRC to A. W. Dromerick, NRC
Subject:
R.E. GINNA NUCLEAR POWER PLANT, REVIEW OF THE TIA FROM REGION 1 FOR OPERABILITY ASSESSMENT OF AN INTERMEDIATE RANGE NEUTRON MONITORING (IRM)
INSTRUMENT WHILE THE INSTRUMENT WAS UNDER COMPENSATED FOR PROPER DETECTOR VOLTAGE (11 pages) 60.
09/16/97 Memo from H. N. Berkow, NRC to J. R. Johnson, NRC
Subject:
TIA97-07, VOGTLE REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION TRIP SETPOINTS - VOGTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 (3 pages) j 61.
09/29/97 Memo from W. D. Beckner, NRC to J. E. Rosenthal, NRC
Subject:
DEPORTABILITY OF MISSED TECH. SCAL SPECIFICATIONS SURVEILLANCE UNDER 10 CFR 50.73 l
(2 pages) i 62.
10/01/97 Memo from F. J. Hebdon, NRC to J. R. Johnson, NRC
Subject:
NRR RESPONSE TO TIA 96-18, SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 - INTERPRETATION OF TECHNICAL SPECIFICATION 3/4.3.1 ON PRESSURIZER PRESSURE TRANSMITTERS (4 pages) 63.
10/06/97 Memo from R. B. Eaton, NRC to C. W. Hehl, NRC
Subject:
WORK REQUEST DATED AUGUST 4,1997, REQUESTING REVIEW OF A REGION I TASK INTERFACE AGREEMENT (TIA) REGARDING INTERPRETATION OF TECHNICAL SPECIFICATIONS (TS) AT VERMONT YANKEE -
REVISED RESPONSE (2 pages) i
9 64.
10/14/97 Memo from W. D. Beckner, NRC to J. N. Hannon, NRC
Subject:
TECHNICAL SPECIFICATION INTERPRETATION FOR AUXILIARY FEEDWATER AND SAFETY INJECTION SYSTEMS OPERABILITY - PRAIRIE ISLAND 1 AND 2 (6 pages) 65.
10/16/97 Memo from F. J. Hebdon, NRC to J. R. Johnson, NRC
Subject:
NRR RESPONSE TO TIA 96-017, SEQUOYAH NUCLEAR Pl. ANT, UNITS 1 AND 2 - INTERPRETATION OF TECHNICAL SPECIFICATION 3.2.4 ON QUADRANT POWER TILT RATIO (3 pages) 66.
10/16/97 Letter to Mr. Roger O. Anderson, Northem States Power Company, from B. A. Wetzel, NRC
Subject:
TECHNICAL SPECIFICATIONS INTERPRETATIONS FOR AUXILIARY FEEDWATER AND SAFETY INJECTION SYSTEMS OPERABILITY - PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNITS NOS.1 AND 2 (6 pages) 67.
10/18/97 Memo from W.D. Beckner, NRC to J. N. Hannon, NRC
Subject:
TECHNICAL SPECIFICATION INTERPRETATION FOR AUXILIARY FEEDWATER AND SAFETY INJECTION SYSTEMS OPERABILITY - PRAIRIE ISLAND 1 AND 2 (6 pages) 68.
10/22/97 Memo from R. A. Capra, NRC to John A. Grobe, NRC
Subject:
REGION 111 TASK INTERFACE AGREEMENT; CONTAINMENT SPRAY ADDITIVE SYSTEM CONFORMANCE WITH DESIGN BASIS AND TECHNICAL SPECIFICATIONS (41 pages) 69.
10/29/97 Memo from J. S. Wermiel, NRC to H.M. Berkow, NRC
Subject:
TASK INTERFACE AGREEMENT (TIA 97-12)
EVALUATION OF MONTHLY SURVEILLANCE TESTING OF REACTOR TRIP BYPASS BREAKER AND ITS P-4 INTERLOCK FOR VOGTLE UNITS 1 AND 2 (7 pages) 70.
11/25/97 Memo from J. R. Hall, NRC to T. P. Gwynn, NRC
Subject:
TASK INTERFACE AGREEMENT (TIA), ARKANSAS NUCLEAR ONE, UNIT 1 (ANO-1) PRESSURIZER SAFETY VALVE SET POINTS,95TIA005 (4 pages)
l 10 71.
12/22/97 Memo from H. N. Berkow, NRC to J. B. Johnson, NRC
Subject:
TASK INTERFACE AGREEMENT (TIA 97-12)
EVALUATION OF TECHNICAL SPECIFICATION REQUIRED MONTHLY AND REFUELING INTERVAL TESTING OF P-4 INTERLOCK FOR VOGTLE UNITS 1 AND 2 (4 pages) 72.
12/31/97 Memo from F. J. Hebdon, NRC to J. R. Johnson, NRC
Subject:
NRR RESPONSE TO TIA 97-019, SEQUOYAH NUCLEAR PLANT, UNIT 1 - TECHNICAL SPECIFICATION REQUIREMENTS FOR INITIATION OF PHYSICS TESTING (3 pages) 73.
02/04/98 Letter to Mr. John. K. Wood, Centerior Service Company,from R.
P. Savio, NRC
Subject:
DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 -
INTERPRETATION OF SCHEDULE REQUIREMENTS FOR TECHNICALSPECIFICATION SURVEILLANCE TESTS CONDUCTED ON A STAGGERED TEST BASIS (9 pages) 74.
02/25/98 Memo from F. J. Hebdon, NRC to R. M. Gallo, NRC
Subject:
TECHNICAL SPECIFICATION INTERPRETATION -
SEQUOYAH (4 pages) 75.
03/11/98 Memo from W. D. Beckner, NRC to W. H. Bateman, NRC
Subject:
TASK INTERFACE AGREEMENT (TIA) RESPONSE -
CALLAWAY - PERFORMANCE OF "DURING SHUTDOWN" SURVEILLANCE TEST REQUIREMENTS WITH THE UNIT AT-l POWER.
l (3 pages) l 76.
04/01/98 Memo from J. S. Wermiel, NRC to H. M. Berkow, NRC
Subject:
TASK INTERFACE AGREEMENT (TIA 97-12)
SUPPLEMENTAL EVALUATION OF TECHNICAL SPECIFICATION REQUIRED MONTHLY AND REFUELING l
INTERVAL TESTING OF p-4 INTERLOCK FOR VOGTLE UNITS 1 AND2 (1 Page) 77.
06/05/98 Memo from W. D. Beckner, NRC to R. A. Capra, NRC
Subject:
REQUEST FOR NRC INTERPRETATION - TECHNICAL SPECIFICATION CHANNEL CAtlBRATION OF RTDS AND THERMOCOUPLE (3 pages) i