IR 05000295/1998005

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-295/98-05 & 50-304/98-05 on 980314-0424.No Violations Noted.Staff Responded to Several Events Involving Configuration Control Deficiencies
ML20247P359
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/20/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20247P362 List:
References
50-295-98-05, 50-295-98-5, 50-304-98-05, 50-304-98-5, NUDOCS 9805270422
Download: ML20247P359 (2)


Text

SUBJECT:

NRC INSPECTION REPORT NO. 50-295/98005(DRP); 50-304/98005(DRP)

j

Dear Mr. Kingsley:

- On April 24,1998, the NRC completed an inspection at your Zion 1 and 2 reactor facilities. The enclosed report presents the results of that inspection.

Performance during this inspection period was adequate. However, your staff responded to y

several events involving configuration control deficiencies. These events included inadvertent draining of a holdup tank to the spent fuel pool, inadvertent draining of a reactor water storage l

tank to a holdup tank, and a failure to maintain the applicable number of service water pumps l

'

operable during surveillance testing. Problems in configuration control was an existing performance issue at Zion Station before the permanent shutdown. These recent examples indicate the need to continue management focus on pertinent problem areas for the permanently shutdown facility.

,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its l

enclosure will be placed in the NRC Public Document Room.

l We will gladly discuss any questions you have concoming this inspection.

!

Sincerely, l

/s/ Geoffrey E. Grant i

Geoffrey E. Grant, Director Division of Reactor Projects Docket Nos.: 50-295; 50-304

- License Nos.: DPR-39; DPR-48

,

Enclosure:

Inspection Report-No. 50-295/98005(DRP);

50-304/98005(DRP)

See Attached Distribution -

0 ~ "J

--

l DOCUMENT NAME: G:\\ ZION \\ZIO98005.DRP To receive a copy of this document, indicate in the box "C" = Copy w/o attach /enci"E" = Copy w/ attach /enci "N" = No copy OFFICE Rlli lr Rill lE Rlli l

l NAME Pelton\\ml pr/44.-

Hills D&

Grant (M DATE 5/$/98 SA3/98 54C4/98 O C 9005270422 990520 PDR ADOCK 05000295 i

\\

C PDR f

fEO l

,

'

.

.

\\

I

!

I l I cc w/ encl:

M. Wallace, Senior Vice President D. Helwig, Senior Vice President

)

G. Stanley, PWR Vice President J. Perry, BWR Vice President D. Farrar, Regulatory I

Services Manager 1. Johnson, Licensing Director DCD - Licensing J. Brons, Site Vice President R. Starkey, Plant General Manager R. Godley, Regulatory Assurance Supervisor Richard Hubbard Nathan Schloss, Economist Office of the Attomey General Mayor, City of Zion State Liaison Officer State Liaison Officer, Wisconsin Chairman, Illinois Commerce Commission Distribution:

SAR (E-Mail)

Project Mgr., NRR w/enci A. Beach w/enci J. Caldwell w/enct B. Clayton w/enct SRI Zion w/enci DRP w/enci

!

TSS w/enci

DRS (2) w/ encl Rill PRR w/enci j

PUBLIC IE-01 w/enci

_

l

-

Docket File w/enci GREENS LEO (E-Mail)

DOCDESK (E-Mail)

L l

l l

l t.

I

!

l

_