OCT 2 4199n Docket Nos. 50-295; 50-304 License Nos. DRP-39; DRP-48 EA 89-255 Commonwealth Edison Company i
ATTN: Mr. Cordell Reed Senior Vice President Opus West III 1400 Opus Place Downers Grove, IL 60515 Gentlemen:
Thank you for your August 22, 1990 letter which provided additional information
)
requested by our July 6,1990 letter, regarding the licensed operator requalifi-cation program at the Zion Nuclear Station.
Our July 6,1990 letter requested you address certain concerns we had with respect to the remedial training portions l
of the licensed operator requalification program.
Your response to our questions provides us with an indication of adequate j
programmatic controls.
Inspection of these areas at a later date may be used to confirm the adequacy of their implementation.
Sincerely, i
f O!stC.NAL Sid:.LJ Si fue6d J. Mh.uA H. J. Miller, Director t
Division of Reactor Safety See Attached Distribution 3
1 i
l i
l RIII Rill-Rill UL gA,ff
<WM g it/db Pedbrson ler 10/t /90 10/23/90
,0/)C/90 9011010051 901024 PDR ADOCK 05000295 P
PNU L llt 9^,
~
/86/
p j
4
)
i OCT 2 41990 i
2-
.j Commonwealth Edison Company.
1 Distribution i
cc w/ltr dtd 8/22/90:
M. Wallace, Vice President,
]
PWR Operations j
T. Kovach, Nuclear Licensing Manager 4
T. Joyce, Station Manager i
R. Chrzanowski, Regulatory' Assurance L
Supervisor DCD/DCB(RIDS) ll OC/LFDCB i
Resident Inspectors, Byron, Richard Hubbard
-Braidwood. Zion J. W. McCaffrey, Chief, Public' i
Utilities Division Mayor, City of Zion Chandu Patel, LPM, NRR I
Robert Newmann, Office of Public a
Counsel, State of Illinois' Center 1
J.'Lieberman, OE W. Troskoski, OE l]
a
.r s
a if s
-l d
q
.3 c
1..
- - i L.!
p 44 1
3
'!n
,Ib
[f
.z : 3; c
~! f f
f y
s i
26,
i.+..
w e
i
v
- o-I p)
Crmm:nwrith Edistn
' i 1400 Opus Place (d Downcis Grove, Illinois 00515 August 22, 1990 l
Director office of Enfor:ement U.S.
Nucleer Regulatory Commission Washington, DC 20555
Subject:
Zion Station Units 1 and 2 Supplemental Information for Notice of Violation (EA 89-255)
Inspection Report 50-295/89040 and 50-304/89036 UAC_ Docket _tios. 50-291_and 50-304
Reference:
(a)
April 12, 1990, letter from T.J.
Kovach to Director, Office of Enforcement (b)
July 6, 1990, letter from E.
Baker to Cordell Reed Gentlemen:
Commonwealth Edison provided a response to the Zion Station Notice of Violation, in reference (a), regarding the two violations pertaining to the senior reactor operator (limited) with an inactive license performing licensed duties without standing the required ont shift refresher watch and the failure to revise the requalification program at Z.4.on to include requirements tha'. operators attend preplanned lectures and to establish controls that ensure missed sessions are made up.
A civil penalty was proposed and Commonwealth Edison subtltted payment.
Reference (b) requested a response to questions regarding the revised Zion Station requalification program.
This letter addresses those questians.
The normal Zion Statien Operating schedule is strvctured such that one out of every five weeks is designated as a training week for euch of the five shifts.
l This training week contains 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br /> of available time for training instruction and this cycle occurs 10 times to yield the 320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br /> that are available for training.
Therefore, the licensed operator training material is repeated five times, once for each shift. Of those available hours, the Zion Station licensed operator requalification program consists of 8 of the ten cycles.
Therefore,_to answer the first question regarding the use of self study as the only means of remediation, page 1 of the attached requalification flow chart shows that if another lecture from the same cycle is available, then the first and preferred remediation means is to attend another lecture on the'same material.
If another lecture is not available, either due to shift assignment conflicts or if the missed lecture was the last of that cycle and will not be offered again, then a second acceptable means of remediation is self-study of the material by the end of the next quarter.
In either case, a weekly quiz must be successfully completed within the bounds of the requalification program that will be described later in this letter.
The second question pertained to the controls that ensure the specific 180 hours0.00208 days <br />0.05 hours <br />2.97619e-4 weeks <br />6.849e-5 months <br /> of required training is received on subjects identified through the SAT process. Attendance is required, or makeup is permitted as described above, for each lecture that comprises the 180 hours0.00208 days <br />0.05 hours <br />2.97619e-4 weeks <br />6.849e-5 months <br /> of required lectures identified through the SAT process.
The remainder of the available training consists of out-of-service card training, general employee training, fire brigade training, the administration of the requalification examination consisting of JPH's, simulator, and the written test, and some simulator training.
This training is in addition to the required 180 hours0.00208 days <br />0.05 hours <br />2.97619e-4 weeks <br />6.849e-5 months <br /> of specific lecture material to satisfy the licensed operator requalification program.
In summary, a prescribed 180 hours0.00208 days <br />0.05 hours <br />2.97619e-4 weeks <br />6.849e-5 months <br /> of lecture material is defined to satisfy the requirements of the requalification program.
The additional 140 hours0.00162 days <br />0.0389 hours <br />2.314815e-4 weeks <br />5.327e-5 months <br /> of training consists of additional training time-for the administration of the examination and non-requalification program. training, totaling 320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br /> of training per year.
~ o1^^ M g 2 B $90 g,wo s, ~ \\
.g
'.Dir. Otc. of Enforcement 2 -
Auguot 22, 1990 l
The last question pertained to the policy for remediation of individuals who fail required quizzes. The process is most easily explained if it is divided into four categories. The first category applies to individuals who pass the quiz with a score of greater than or equal to 80%.
In this case, no remediation is required and the individual is permitted to take the requalification examination.
The second category applies to individuals that fail the test with a score of less than 70%.
In this case, the Assistant Superintendent of Operating and the individual are notified of the score and the specific weaknesses are identified. A remediation quiz is scheduled and must be passed prior to taking the requalification examination.
The third category applies to individuals that score less than 80% yet greater than or equal to.70% on a speelfic *seekly quiz..In this case,_,the.,
l Assistant Superintendent of Operating and the individual are notified of the score and the specific weaknesses are identified.
A remediation quiz is not required at this point and the individual is permitted to take the requalification examination.
The fourth and last category applies to individuals that have a rolling 6'
{
quiz average of less than or equal to 80%.
In this case, the individual is removed i
from shift and the Assistant Superintendent of Operating and the individual are notified of the average and the specific weaknesses. A comprehensive remediation 7
examination must be taken and a score of greater than of equal to 80% is required prior to returning to shift and being petmitted to take the requalification examination.
The attached flow chart depicts the appropriate actions that are taken to satisfy the requirements of the licensed operator weekly requalification program.
If any further questions exist, please direct them to this of'fice Very truly yours, N
/
R. A.
hrzanowski Huclear Li naing Administrator i
Attachment cca C. Patel - NRR Region III Office Zion Resident Inspector l
l l
/sc1:ID192:2
LICENSED OPERATOR RETRAINING WEEKLY PROGRAM J
Yts n
rem:n2 l
na2xr anw:s To stance unacar i
wir IA Rstkri heaqrer r# Ae e anone mGlied dinfirWu~'ofteodonx nenl$
imWs that wuWivd to kss l
gggy then i4e nysumf annenom j
pertia)wtwo
~
\\
m nss n utmr guiz emt ym-its
- Emr
,9 ociz scant is
>m aso nonnen.saeuni.
ase wrmet someau.
NH21VES REPORT ON OUIZ RECEFf3 REPORT ON QUII scene ano veanesses sconc ane vennesses s
ano scmsviso ran rou s te east i
E oun wrw Yes no 2m v
1 j
r, en, dw PAGE 1 a er r
1
s.
~ LICENSED OPERATOR RETRAINING QUIZ AVERAGE ROLUNG TAKEN OIT SHIFT TEs stX QUlz M
Aso fear;FIED. INDmDUAL AVERACE PECUVE3 REPORT CN QUIZ
>g AYERACE AND WEAKNESSES TAKE C0uPPDIEN", TIE ExAn vrs PASS THE m
OPERATUt3 TRAIMNG CGar= m utQUIZ 1m
/
REVIEW BOARD DErrRumes REuEmAnow REuEotAnow Yts svu w.a
_ m_ Paransanct nevan QUIZ RETAKE tm cggumEE 0)NVDIES comunut its nEcoumpes M
asPosinon eEttrwtsto connpuEn er station mANacEn v
REuEntAnon' fa Aqre J
~
i PAGE 2
D LICENSED OPERATOR RETRAINING REQUALIFICATION EXAM
?
e e
YES PASS T E NO TAKDI REQUAL EIAN? /
OFT SHIFT
/
I em mn.3nerx REVIEW BOARD DETEmmeES RDfEMATION YES PASS THE NO PERFDmWICE REVIEW REQUAL RE-EIAM?
COMIN1 TEE CONVDIES C0wamtE TES RECC4WDIDS NO DEP05m0N DEfDRWIED ColeTINUED SY 5taTI0ft WNIACII RDfEDIATION?
RE3UNE THE PROCESS BEX NI WEEKLY TPJWINOG o