ML20249C168

From kanterella
Jump to navigation Jump to search

Forwards Environ Assessment Related to Application for Exemption from Certain Requirements of 10CFR50.71 for Units 1 & 2.Exemption Would Permit Extension of Time Interval for Submittal of Updated FSAR
ML20249C168
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 06/24/1998
From: Assa R
NRC (Affiliation Not Assigned)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20249C169 List:
References
TAC-MA1315, TAC-MA1316, NUDOCS 9806260140
Download: ML20249C168 (3)


Text

^

June 24, 1998'~

Mr. Oliver D. Kingsley, President Nudear Generation Group Commonwealth Edison Company Executive Towers West 111 1400 Opus Place, Suite 500 Downers Grove,IL 60515

SUBJECT:

ENVIRONMENTAL ASSESSMENT RELATED TO EXEMPTION FROM REQUIREMENTS OF 10 CFR 50.71 - ZION NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS MA1315 AND MA1316)

Dear Mr. Kingsley; Enclosed is a copy of an Environmental Assessment and Finding of No Significant Impact related to your application for an exemption from certain requirements of 10 CFR 50.71, " Maintenance of records, making of reports," for Zion Nuclear Power Station, Units 1 and 2. The request was submitted by letter dated March 12,1998. The proposed exemption would permit extension of the time interval for the submittal of the Updated Final Safety Analysis Report (UFSAR),10 CFR 50.71(e)(4) requires the time interval for the subsequent UFSARs not to exceed 24 months. The next Zion Station 24-month time interval would end in July 1998. The proposed exemption would allow this date to be extended to December 1998.

This assessment is being forwarded to the Office of the Federal Register for publication.

Sincerely, i

ORIG. SIGNED BY:

Ramin R. Assa, Project Manager Project Directorate lll-2 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket Nos. 50-295,50-304

Enclosure:

Environmental Assessment cc w/ encl: See next page t

DISTRIBUTION.

Docket PUBLIC PD3-2 r/f EAdensam SRichards CMoore RAssa TEssig OGC ACRS DHills, Rill SWeiss TMaitjey DOCUMENT NAME: G:\\CMNTSP\\ ZION)Zl1315.EA l

TO MCENE A COPY oF THis DOCUMENT, WDICATE W THE Box:"C" = COPY WITHouT ENCLOSURES "E" = COPY WITH Enclosures *W" OFFICE PM.PD32,,

C h:hjh M CfDND,pt, (A)BC:PGEB OGC D.PD32 C

[

f hn[f SRICHARDSk NAME RASSA h (Ch$E NIShh TESSIG DATE

  1. M.

S M /98 h h 198' h( 38 h !l 88--

h!b48

~~

fa[i :

OFFICIAL RECORD COPY lInta t %*?! m e L S 1

NRC IRE CENTHI e**

l' P.

PDR s

i t

a

p erg h

UNITED STATES j

j NUCLEAR RE!!ULATORY COMMI2SION t

WASHINGTON, o.C. 20066 4 001

,y...../

June 24,1998 Mr. Oliver D. Kingsley, President Nuclear Generation Group

)

Commonwealth Edison Company Executive Towers West til 1400 Opus Place, Suite 500 Downers Grove,IL 60515

SUBJECT:

ENVIRONMENTAL ASSESSMENT RELATED TO EXEMPTION FROM REQUIREMENTS OF 10 CFR 50.71 - ZION NUCLEAR POWER STATION, UNITS 1 AND 2 (TAC NOS MA1315 AND MA1316)

Dear Mr. Kingsley:

Enclosed is a copy of an Environmental Assessment and Finding of No Significant Impact related to your application for an exemption from certain requirements of 10 CFR 50.71, " Maintenance of records, making of reports," for Zion Nuclear Power Station, Units 1 and 2. The request was submitted by letter dated March 12,1998. The proposed exemption would permit extension of the time interval for the submittal of the Updated Final Safety Analysis Report (UFSAR).10 CFR 50.71(e)(4) requires the time interval for the subsequent UFSARs not to exceed 24 months. The next Zion Station 24-month time interval would end in July 1998. The proposed exemption would allow this date to be extended to December 1998.

This assessment is being forwarded to the Office of the Federal Register for publication.

Sincerely, W

,r Ramin R. Assa, Project Manager Prnject Directorate lil-2 Division of Reactor Projects - lil/IV Office of Nuclear Reactor Regulation Docket Nos. 54295,50 304

Enclosure:

Environmental Assessment cc w/ encl: See next page 4

hir ui

O. Kingsley Zion Nuclear Power Station j

Commonwealth Edison Company Units 1 and 2 cc:

Michael 1. Miller, Esquire Mr. Michael J. Wallace, Senior Vice President Sidley and Austin Commonwealth Edison Company One First National Plaza Executive Towers West til Chicago, Illinois 60603 1400 Opus Place, Suite 900 Downers Grove,IL 60515 Dr. Cecil Lue-Hing, Director Research and Development Mr. David Helwig, Senior Vice President Metropolitan Sanitary District of Greater Chicago Commonwealth Edison Company 100 E. Erie Street Executive Towers West til Chicago, Illinois 60611 1400 Opus Place, Suite 900 Downers Grove, IL 60515 Phillip Steptoe, Esquire Sidley and Austin Mr. Gene H. Stanley One First National Plaza PWR's Vice President Chicago,lilinois 60603 Commonwealth Edison Company Executive Towers West 111 Commonwealth Edison Company 1400 Opus Place, Suite 900 Site Vice President - Zion Downers Grove,IL 60515 101 Shiloh Blvd.

Zion, Illinois 60099-2797 Mr. Steve Perry BWR's Vice President lilinois Department of Nuclear Safety Commonwealth Edison Company Office of Nuclear Facility Safety Executive Towers West til 1035 Outer Park Drive 1400 Opus Place, Suite 900 Springfield, Illinois 62704 Downers Grove, IL 60515 U.S. Nuclear Regulatory Commission Mr. Dennis Farrar Zion Resident inspectors Office Regulatory Services Manager 105 Shiloh Blvd.

Commonwealth Edison Company Zion, Illinois 60099 Executive Towers West 111 1400 Opus Place, Suite 500 Regional Administrator Downers Grove, IL 60515 U.S. NRC, Region til 801 Warrenville Road Ms. Irene Johnson, Licensing Director Lisle, Illinois 60532-4351 Nuclear Regulatory Gervices Commonwealth Edison Company Commonwealth Edison Company Executive Towers West lil Zion Station Manager 1400 Opus Place, Suite 500 101 Shiloh Blvd.

Downers Grove,IL 60515 Zion, Illinois 60099-2797 Commonwealth Edison Company Document Control Desk-Licensing Reg. Assurance Supervisor-Zion Commonwealth Edison Company 101 Shiloh Blvd.

1400 Opus Place, Suite 400 Zion, Illinois 60099-2797 Downers Grove, Illinois 60515 Mr. Bill Franz (5)

Mayor of Zion Environmental Review Coordinator Zion, Illinois 60099 77 W. Jackson Blvd.

Chicago, Illinois 60604-3590