IR 05000267/1987029: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML20151N417
| number = ML20195D035
| issue date = 08/04/1988
| issue date = 06/15/1988
| title = Ack Receipt of 880707 Request for Extension of 30 Days for Submittal of Plan Changes Per Insp Rept 50-267/87-29. Extension Granted
| title = Ack Receipt of 880527 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/87-29
| author name = Callan L
| author name = Callan L
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = NUDOCS 8808080210
| document report number = NUDOCS 8806230018
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 2
}}
}}


Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:
'
g; 4 gg .
. .-
        !
In Reply Refer To:
7 Docket: 50-267/87-29 Public Service Company of Colorado    .
ATTN: Robert O. Williams, J '
Vice President, Nuclear Operations 2420 W. 26th Avenue, Suite 15c Denver, Colorado 80211 Gentlemen:
Thank you for your letter of July 7,1988, which requested an extension of 30 days for submittal of referenced plan change Your request for the extension is approve
 
Sincerely, Original Signed By L.I.Canan  .
L. J. Callan, Director Division of Reactor Projects cc:
Fort St. Vrain Nuclear Station Manager, Nuclear Production Division 16805 WCR 19h Platteville, Colorado 80651 Fort St. Vrain Nuclear Station P. Tomlinson, Manager, Quality Assurance Division (same address)
Colorado Radiation Control Program Director Colorado Public Utilities Commission l
bec to DMB (IE04)
Qg bec distrib. by RIV:
eNo R(0. Martin,RA  DRP
@$' ReTident Inspector  Lisa Shea, RM/ALF gg Section Chief, DRP/B  DRS co o RPB-DRSS  MIS System  ;
og RSTS Operator  RIV File  ;
"O Inspector  Section Chief  ;
$8 B. Mutray  R. L. Bangart  ;
8C R. E. Hall  Project Engineer, DRP/B  l gg K. Hritner, NRR Project Manager    1 9      0 f C:DRP/Ch  P4 RIV- 5:RPB C:S RPB C:Rg&,  D 5 l
Ea st/jt RJEv t BJuFi%y s TFWesterman JCallan Ap/t/88
%  q/\/88 p/\ /88 i (/ y /88  / %88 f 6' l
_
1
}}
}}

Revision as of 05:36, 14 November 2020

Ack Receipt of 880527 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/87-29
ML20195D035
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 06/15/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
References
NUDOCS 8806230018
Download: ML20195D035 (2)