Category:INSPECTION REPORT
MONTHYEARIR 05000267/19970011997-04-0707 April 1997 Insp Rept 50-267/97-01 on 970310-11.No Violations Noted. Major Areas Inspected:Reviews of Status of Radiation Protection,Environ Monitoring & Radwaste Mgt Programs IR 05000267/19960051996-12-23023 December 1996 Insp Rept 50-267/96-05 on 961203-05.No Violations Noted. Major Areas Inspected:Access Licensees Implementation of Radiation Protection Program & Decommissioning Plan & Included Reviews of Status of Radiation Protection IR 05000267/19900171990-11-29029 November 1990 Insp Rept 50-267/90-17 on 901001-1109.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety, Monthly Surveillance & Maint Observation IR 05000267/19900181990-11-20020 November 1990 Partially Withheld Insp Rept 50-267/90-18 on 901022-26. Violation Noted.Major Areas Inspected:Physical Security Program,Including Protected & Vital Area Barriers,Detection & Assessment Aidscommunications,Testing,Packages & Maint IR 05000267/19900191990-11-16016 November 1990 Insp Rept 50-267/90-19 on 901015-19.No Violations or Deviations Noted.Areas Inspected:Stated Radiological Controls IR 05000267/19900201990-11-14014 November 1990 Insp Rept 50-267/90-20 on 901029-1102.Noncitable Violation Noted.Major Areas Inspected:Insp of Fire Protection/ Prevention Program IR 05000267/19900141990-10-11011 October 1990 Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted IR 05000267/19900111990-08-15015 August 1990 Insp Rept 50-267/90-11 on 900601-0728.No Violations Noted. Major Areas Inspected:Onsite Followup of Ler,Operational Safety Verification,Monthly Maint Observation & Monthly Surveillance Observation IR 05000267/19900131990-08-0303 August 1990 Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program Including Emergency Detection & Classification,Knowledge & Performance of Duties IR 05000267/19900101990-07-25025 July 1990 Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Radioactive Matl Transportation Program,Liquid & Gaseous Radwaste Mgt Programs,Including Radiological Effluent Releases IR 05000267/19890191989-10-0202 October 1989 Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted.Major Areas Inspected:Region 19 CRD Assembly Recovery Activities,Followup on Region 19 CRD Clevis Bolt Failures & Steam Generator Ring Header Problems IR 05000267/19890161989-09-26026 September 1989 Insp Rept 50-267/89-16 on 890716-0831.Violation Noted.Major Areas Inspected:Onsite Followup of Ler,Followup on Violations,Followup of Open Item,Review of Part 21 Repts & Review of Licensee Action of Events IR 05000267/19890131989-08-16016 August 1989 Insp Rept 50-267/89-13 on 890626-30.Violation Noted.No Deviations Noted.Major Areas Inspected:Radwaste Sys IR 05000267/19890141989-08-15015 August 1989 Insp Rept 50-267/89-14 on 890710-14.Violation Noted.Major Areas Inspected:Radiation Protection Program ML20245J5791989-08-10010 August 1989 Insp Rept 50-267/89-17 on 890717-21.Violations Noted.Major Areas Inspected:Licensee Programs for Instrument Calibr & Functional Testing of Diesel Fuel Oil Quality & Storage & Actions on Previously Identified Insp Findings ML20245H3971989-08-0808 August 1989 Insp Rept 50-267/89-12 on 890601-0715.Violation Noted.Major Areas Inspected:Onsite Followup of Lers,Operational Safety Verification & Monthly Surveillance & Maint Observations ML20248E0261989-08-0101 August 1989 Team Insp Rept 50-267/89-08 on 890522-26.Violations Noted. Major Areas Inspected:Maint Activities Re Reactor Water Cooling Sys (Sys 46) IR 05000267/19890151989-07-11011 July 1989 Insp Rept 50-267/89-15 on 890623-27.Violation Noted.Major Areas Inspected:Circumstances & Events Associated W/ Operation of Facility Above Authorized Max Power Level of 82% of Full Power IR 05000267/19890101989-06-15015 June 1989 Insp Rept 50-267/89-10 on 890501-31.No Violations Noted. Major Areas inspected:follow-up of Ler,Licensee Action on Previously Identified Insp Findings,Operational Safety Verification & Monthly Surveillance Observation ML20244C1301989-06-0101 June 1989 Insp Rept 50-267/89-07 on 890319-0430.Violations Noted.Major Areas Inspected:Previously Identified Insp Findings, Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation IR 05000267/19890061989-04-24024 April 1989 Partially Withheld Insp Rept 50-267/89-06 on 890313-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support & Security Program Plan & Protected & Vital Area Barriers ML20245C8341989-04-13013 April 1989 Insp Rept 50-267/89-03 on 890201-0318.Violations Noted. Major Areas Inspected:Lers,Reserve Shutdown Matl Removal, Operational Safety Verification,Radiological Controls, Monthly Surveillance Observation & Maint Observation IR 05000267/19890051989-04-12012 April 1989 Insp Rept 50-267/89-05 on 890306-10 & 13-17.No Violations Noted.Major Areas Inspected:Previously Identified Insp Items,Surveillance Procedures & Records,Allegation Followup & Preparations for Refueling IR 05000267/19890041989-03-16016 March 1989 Insp Rept 50-267/89-04 on 880227-0303.No Violations or Deviations Noted.Major Areas Inspected:Licensed Operator Training IR 05000267/19890011989-02-16016 February 1989 Partially Withheld Insp Rept 50-267/89-01 on 890109-13 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Licensee Physical Security Program Including Mgt Support, Security Program Plan,Audits & Security Training IR 05000267/19890021989-01-17017 January 1989 Insp Rept 50-267/89-02 on 890101-31.Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Insp Findings,Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation IR 05000267/19880211988-11-21021 November 1988 Insp Rept 50-267/88-21 on 880926-30.Violation & Deviations Noted.Major Areas Inspected:Implementation of & Compliance to Safe Shutdown Requirements of 10CFR50,App R IR 05000267/19880281988-11-18018 November 1988 Insp 50-267/88-28 Canceled & No Insp Rept to Be Issued for Rept Number ML20206M4311988-11-16016 November 1988 Insp Rept 50-267/88-25 on 880911-1022.Violations Noted. Major Areas Inspected:Previously Identified Insp Findings, Licensee Action in Response to NRC Bulletins,Operational Safety Verification & Monthly Maint Observation IR 05000267/19880261988-11-0404 November 1988 Insp Rept 50-267/88-26 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected:Failure of Emergency Diesel Generator Output Breakers to Automatically Close During 881011 Test & Routine Insp of Instrument Calibr IR 05000267/19880241988-10-12012 October 1988 Insp Rept 50-267/88-24 on 880926-30.No Violations or Deviations Noted.Major Areas inspected:safety-related Surveillance Testing & post-mod Testing IR 05000267/19880231988-10-0303 October 1988 Insp Rept 50-267/88-23 on 880912-16.Violations & Deviations Noted.Major Areas Inspected:Refurbishment of Reactor Helium Circulator IR 05000267/19880181988-09-29029 September 1988 Insp Rept 50-267/88-18 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Licensed Operator, Nonlicensed Staff & General Employee Training IR 05000267/19880201988-09-29029 September 1988 Insp Rept 50-267/88-20 on 880801-0910.Violations Noted. Major Areas Inspected:Operational Safety Verification,Ler Review,Monthly Maint Observations,Esf Walkdown,Radiological Protection & Security Observations ML20154N0081988-09-16016 September 1988 Insp Rept 50-267/88-17 on 880724-0802.Violations Noted. Major Areas Inspected:Licensee Radiation Protection Program ML20154E4341988-09-0808 September 1988 Insp Rept 50-267/88-15 on 880711-0805.Violation & Deviation Noted.Major Areas Inspected:Previous Insp Findings,Ler Followup,Control of Design Changes & Mods & Activities Re Refurbishment of Reactor Helium Circulators ML20155B8411988-09-0202 September 1988 Operational Safety Team Insp Rept 50-267/88-200 on 880509-20.Major Areas Inspected:Operations,Maint, Surveillance,Mgt Oversight,Safety Review & QA Programs IR 05000267/19880141988-09-0202 September 1988 Insp Rept 50-267/88-14 on 880725-0805.Violations & Deviations Noted.Major Areas Inspected:Followup of Previous Insp Findings,Status of Reg Guide 1.97 Implementation,Status of Generic Ltr 83-28 Implementation & Followup of LERs IR 05000267/19880191988-08-30030 August 1988 Partially Withheld Insp Rept 50-267/88-19 on 880810-11 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Safeguards Contingency Plan Implementation & Physical Protection of Safeguards Info IR 05000267/19880161988-08-26026 August 1988 Insp Rept 50-267/88-16 on 880701-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Ler Review,Monthly Maint Observation,Monthly Surveillance & Monthly Security Observation ML20151X4411988-08-11011 August 1988 Insp Rept 50-267/88-13 on 880601-30.Violation Noted.Major Areas Inspected:Licensee Action on NRC Bulletins,Operational Safety Verification,Followup of Allegations,Equipment Qualification Temp Profile & Radiological Protection ML20150C2571988-06-21021 June 1988 Insp Rept 50-267/88-12 on 880501-31.Deviation Noted.Major Areas Inspected:Operational Safety Verification,Ler Review, Monthly Maint Observation,Monthly Surveillance Observation, Radiological Protection & Monthly Security Observation IR 05000267/19880101988-06-0808 June 1988 Insp Rept 50-267/88-10 on 880401-30.Violations Noted.Major Areas Inspected:Followup of Licensee Action on Previously Identified Findings,Followup of Allegation 88-A-01, Operational Safety Verification & Fire Protection IR 05000267/19880111988-05-25025 May 1988 Insp Rept 50-267/88-11 on 880425-29.Violations Noted.Major Areas Inspected:Emergency Response Program,Including Training,Emergency Facilities,Equipment,Instrumentation & Supplies IR 05000267/19880091988-05-13013 May 1988 Insp Rept 50-267/88-09 on 880411-15.No Violations or Deviations Noted.Major Areas Inspected:Licensee Chemistry/ Radiochemistry Program & Water Chemistry & Radiochemistry Confirmatory Measurements IR 05000267/19880071988-05-12012 May 1988 Insp Rept 50-267/88-07 on 880301-31.Violations Noted.Major Areas Inspected:Followup of Licensee Action on Previously Identified Findings,Operational Safety Verification,Review of 10CFR50.59 Safety Evaluations & Radiological Protection IR 05000267/19880081988-04-19019 April 1988 Insp Rept 50-267/88-08 on 880321-25.Violations Noted.Major Areas Inspected:Qa Program,Implementation of 10CFR21,LER Followup & Actions on Previous Insp Findings ML20151R7491988-04-0808 April 1988 Partially Withheld Insp Rept 50-267/88-05 on 880229-0304 (Ref 10CFR73.21).Major Areas Inspected:Insp of Previously Identified Items,Security Plan & Procedures,Security Organization,Locks,Keys & Combinations & Protected Areas IR 05000267/19880041988-03-30030 March 1988 Insp Rept 50-267/88-04 on 880222-26.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection/ Prevention Program & Implementation IR 05000267/19880061988-03-25025 March 1988 Insp Rept 50-267/88-06 on 880229-0304.No Violations Noted. Major Areas Inspected:Licensee Actions Re IE Bulletin 85-003 1997-04-07
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000267/19970011997-04-0707 April 1997 Insp Rept 50-267/97-01 on 970310-11.No Violations Noted. Major Areas Inspected:Reviews of Status of Radiation Protection,Environ Monitoring & Radwaste Mgt Programs IR 05000267/19960051996-12-23023 December 1996 Insp Rept 50-267/96-05 on 961203-05.No Violations Noted. Major Areas Inspected:Access Licensees Implementation of Radiation Protection Program & Decommissioning Plan & Included Reviews of Status of Radiation Protection IR 05000267/19900171990-11-29029 November 1990 Insp Rept 50-267/90-17 on 901001-1109.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety, Monthly Surveillance & Maint Observation IR 05000267/19900181990-11-20020 November 1990 Partially Withheld Insp Rept 50-267/90-18 on 901022-26. Violation Noted.Major Areas Inspected:Physical Security Program,Including Protected & Vital Area Barriers,Detection & Assessment Aidscommunications,Testing,Packages & Maint IR 05000267/19900191990-11-16016 November 1990 Insp Rept 50-267/90-19 on 901015-19.No Violations or Deviations Noted.Areas Inspected:Stated Radiological Controls IR 05000267/19900201990-11-14014 November 1990 Insp Rept 50-267/90-20 on 901029-1102.Noncitable Violation Noted.Major Areas Inspected:Insp of Fire Protection/ Prevention Program IR 05000267/19900141990-10-11011 October 1990 Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted IR 05000267/19900111990-08-15015 August 1990 Insp Rept 50-267/90-11 on 900601-0728.No Violations Noted. Major Areas Inspected:Onsite Followup of Ler,Operational Safety Verification,Monthly Maint Observation & Monthly Surveillance Observation IR 05000267/19900131990-08-0303 August 1990 Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program Including Emergency Detection & Classification,Knowledge & Performance of Duties IR 05000267/19900101990-07-25025 July 1990 Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Radioactive Matl Transportation Program,Liquid & Gaseous Radwaste Mgt Programs,Including Radiological Effluent Releases IR 05000267/19890191989-10-0202 October 1989 Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted.Major Areas Inspected:Region 19 CRD Assembly Recovery Activities,Followup on Region 19 CRD Clevis Bolt Failures & Steam Generator Ring Header Problems IR 05000267/19890161989-09-26026 September 1989 Insp Rept 50-267/89-16 on 890716-0831.Violation Noted.Major Areas Inspected:Onsite Followup of Ler,Followup on Violations,Followup of Open Item,Review of Part 21 Repts & Review of Licensee Action of Events IR 05000267/19890131989-08-16016 August 1989 Insp Rept 50-267/89-13 on 890626-30.Violation Noted.No Deviations Noted.Major Areas Inspected:Radwaste Sys IR 05000267/19890141989-08-15015 August 1989 Insp Rept 50-267/89-14 on 890710-14.Violation Noted.Major Areas Inspected:Radiation Protection Program ML20245J5791989-08-10010 August 1989 Insp Rept 50-267/89-17 on 890717-21.Violations Noted.Major Areas Inspected:Licensee Programs for Instrument Calibr & Functional Testing of Diesel Fuel Oil Quality & Storage & Actions on Previously Identified Insp Findings ML20245H3971989-08-0808 August 1989 Insp Rept 50-267/89-12 on 890601-0715.Violation Noted.Major Areas Inspected:Onsite Followup of Lers,Operational Safety Verification & Monthly Surveillance & Maint Observations ML20248E0261989-08-0101 August 1989 Team Insp Rept 50-267/89-08 on 890522-26.Violations Noted. Major Areas Inspected:Maint Activities Re Reactor Water Cooling Sys (Sys 46) IR 05000267/19890151989-07-11011 July 1989 Insp Rept 50-267/89-15 on 890623-27.Violation Noted.Major Areas Inspected:Circumstances & Events Associated W/ Operation of Facility Above Authorized Max Power Level of 82% of Full Power IR 05000267/19890101989-06-15015 June 1989 Insp Rept 50-267/89-10 on 890501-31.No Violations Noted. Major Areas inspected:follow-up of Ler,Licensee Action on Previously Identified Insp Findings,Operational Safety Verification & Monthly Surveillance Observation ML20244C1301989-06-0101 June 1989 Insp Rept 50-267/89-07 on 890319-0430.Violations Noted.Major Areas Inspected:Previously Identified Insp Findings, Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation IR 05000267/19890061989-04-24024 April 1989 Partially Withheld Insp Rept 50-267/89-06 on 890313-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support & Security Program Plan & Protected & Vital Area Barriers ML20245C8341989-04-13013 April 1989 Insp Rept 50-267/89-03 on 890201-0318.Violations Noted. Major Areas Inspected:Lers,Reserve Shutdown Matl Removal, Operational Safety Verification,Radiological Controls, Monthly Surveillance Observation & Maint Observation IR 05000267/19890051989-04-12012 April 1989 Insp Rept 50-267/89-05 on 890306-10 & 13-17.No Violations Noted.Major Areas Inspected:Previously Identified Insp Items,Surveillance Procedures & Records,Allegation Followup & Preparations for Refueling IR 05000267/19890041989-03-16016 March 1989 Insp Rept 50-267/89-04 on 880227-0303.No Violations or Deviations Noted.Major Areas Inspected:Licensed Operator Training IR 05000267/19890011989-02-16016 February 1989 Partially Withheld Insp Rept 50-267/89-01 on 890109-13 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Licensee Physical Security Program Including Mgt Support, Security Program Plan,Audits & Security Training IR 05000267/19890021989-01-17017 January 1989 Insp Rept 50-267/89-02 on 890101-31.Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Insp Findings,Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation IR 05000267/19880211988-11-21021 November 1988 Insp Rept 50-267/88-21 on 880926-30.Violation & Deviations Noted.Major Areas Inspected:Implementation of & Compliance to Safe Shutdown Requirements of 10CFR50,App R IR 05000267/19880281988-11-18018 November 1988 Insp 50-267/88-28 Canceled & No Insp Rept to Be Issued for Rept Number ML20206M4311988-11-16016 November 1988 Insp Rept 50-267/88-25 on 880911-1022.Violations Noted. Major Areas Inspected:Previously Identified Insp Findings, Licensee Action in Response to NRC Bulletins,Operational Safety Verification & Monthly Maint Observation IR 05000267/19880261988-11-0404 November 1988 Insp Rept 50-267/88-26 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected:Failure of Emergency Diesel Generator Output Breakers to Automatically Close During 881011 Test & Routine Insp of Instrument Calibr IR 05000267/19880241988-10-12012 October 1988 Insp Rept 50-267/88-24 on 880926-30.No Violations or Deviations Noted.Major Areas inspected:safety-related Surveillance Testing & post-mod Testing IR 05000267/19880231988-10-0303 October 1988 Insp Rept 50-267/88-23 on 880912-16.Violations & Deviations Noted.Major Areas Inspected:Refurbishment of Reactor Helium Circulator IR 05000267/19880181988-09-29029 September 1988 Insp Rept 50-267/88-18 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Licensed Operator, Nonlicensed Staff & General Employee Training IR 05000267/19880201988-09-29029 September 1988 Insp Rept 50-267/88-20 on 880801-0910.Violations Noted. Major Areas Inspected:Operational Safety Verification,Ler Review,Monthly Maint Observations,Esf Walkdown,Radiological Protection & Security Observations ML20154N0081988-09-16016 September 1988 Insp Rept 50-267/88-17 on 880724-0802.Violations Noted. Major Areas Inspected:Licensee Radiation Protection Program ML20154E4341988-09-0808 September 1988 Insp Rept 50-267/88-15 on 880711-0805.Violation & Deviation Noted.Major Areas Inspected:Previous Insp Findings,Ler Followup,Control of Design Changes & Mods & Activities Re Refurbishment of Reactor Helium Circulators ML20155B8411988-09-0202 September 1988 Operational Safety Team Insp Rept 50-267/88-200 on 880509-20.Major Areas Inspected:Operations,Maint, Surveillance,Mgt Oversight,Safety Review & QA Programs IR 05000267/19880141988-09-0202 September 1988 Insp Rept 50-267/88-14 on 880725-0805.Violations & Deviations Noted.Major Areas Inspected:Followup of Previous Insp Findings,Status of Reg Guide 1.97 Implementation,Status of Generic Ltr 83-28 Implementation & Followup of LERs IR 05000267/19880191988-08-30030 August 1988 Partially Withheld Insp Rept 50-267/88-19 on 880810-11 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Safeguards Contingency Plan Implementation & Physical Protection of Safeguards Info IR 05000267/19880161988-08-26026 August 1988 Insp Rept 50-267/88-16 on 880701-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Ler Review,Monthly Maint Observation,Monthly Surveillance & Monthly Security Observation ML20151X4411988-08-11011 August 1988 Insp Rept 50-267/88-13 on 880601-30.Violation Noted.Major Areas Inspected:Licensee Action on NRC Bulletins,Operational Safety Verification,Followup of Allegations,Equipment Qualification Temp Profile & Radiological Protection ML20150C2571988-06-21021 June 1988 Insp Rept 50-267/88-12 on 880501-31.Deviation Noted.Major Areas Inspected:Operational Safety Verification,Ler Review, Monthly Maint Observation,Monthly Surveillance Observation, Radiological Protection & Monthly Security Observation IR 05000267/19880101988-06-0808 June 1988 Insp Rept 50-267/88-10 on 880401-30.Violations Noted.Major Areas Inspected:Followup of Licensee Action on Previously Identified Findings,Followup of Allegation 88-A-01, Operational Safety Verification & Fire Protection IR 05000267/19880111988-05-25025 May 1988 Insp Rept 50-267/88-11 on 880425-29.Violations Noted.Major Areas Inspected:Emergency Response Program,Including Training,Emergency Facilities,Equipment,Instrumentation & Supplies IR 05000267/19880091988-05-13013 May 1988 Insp Rept 50-267/88-09 on 880411-15.No Violations or Deviations Noted.Major Areas Inspected:Licensee Chemistry/ Radiochemistry Program & Water Chemistry & Radiochemistry Confirmatory Measurements IR 05000267/19880071988-05-12012 May 1988 Insp Rept 50-267/88-07 on 880301-31.Violations Noted.Major Areas Inspected:Followup of Licensee Action on Previously Identified Findings,Operational Safety Verification,Review of 10CFR50.59 Safety Evaluations & Radiological Protection IR 05000267/19880081988-04-19019 April 1988 Insp Rept 50-267/88-08 on 880321-25.Violations Noted.Major Areas Inspected:Qa Program,Implementation of 10CFR21,LER Followup & Actions on Previous Insp Findings ML20151R7491988-04-0808 April 1988 Partially Withheld Insp Rept 50-267/88-05 on 880229-0304 (Ref 10CFR73.21).Major Areas Inspected:Insp of Previously Identified Items,Security Plan & Procedures,Security Organization,Locks,Keys & Combinations & Protected Areas IR 05000267/19880041988-03-30030 March 1988 Insp Rept 50-267/88-04 on 880222-26.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection/ Prevention Program & Implementation IR 05000267/19880061988-03-25025 March 1988 Insp Rept 50-267/88-06 on 880229-0304.No Violations Noted. Major Areas Inspected:Licensee Actions Re IE Bulletin 85-003 1997-04-07
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000267/19970011997-04-0707 April 1997 Insp Rept 50-267/97-01 on 970310-11.No Violations Noted. Major Areas Inspected:Reviews of Status of Radiation Protection,Environ Monitoring & Radwaste Mgt Programs IR 05000267/19960051996-12-23023 December 1996 Insp Rept 50-267/96-05 on 961203-05.No Violations Noted. Major Areas Inspected:Access Licensees Implementation of Radiation Protection Program & Decommissioning Plan & Included Reviews of Status of Radiation Protection IR 05000267/19900171990-11-29029 November 1990 Insp Rept 50-267/90-17 on 901001-1109.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety, Monthly Surveillance & Maint Observation IR 05000267/19900181990-11-20020 November 1990 Partially Withheld Insp Rept 50-267/90-18 on 901022-26. Violation Noted.Major Areas Inspected:Physical Security Program,Including Protected & Vital Area Barriers,Detection & Assessment Aidscommunications,Testing,Packages & Maint IR 05000267/19900191990-11-16016 November 1990 Insp Rept 50-267/90-19 on 901015-19.No Violations or Deviations Noted.Areas Inspected:Stated Radiological Controls IR 05000267/19900201990-11-14014 November 1990 Insp Rept 50-267/90-20 on 901029-1102.Noncitable Violation Noted.Major Areas Inspected:Insp of Fire Protection/ Prevention Program IR 05000267/19900141990-10-11011 October 1990 Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted IR 05000267/19900111990-08-15015 August 1990 Insp Rept 50-267/90-11 on 900601-0728.No Violations Noted. Major Areas Inspected:Onsite Followup of Ler,Operational Safety Verification,Monthly Maint Observation & Monthly Surveillance Observation IR 05000267/19900131990-08-0303 August 1990 Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program Including Emergency Detection & Classification,Knowledge & Performance of Duties IR 05000267/19900101990-07-25025 July 1990 Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Radioactive Matl Transportation Program,Liquid & Gaseous Radwaste Mgt Programs,Including Radiological Effluent Releases IR 05000267/19890191989-10-0202 October 1989 Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted.Major Areas Inspected:Region 19 CRD Assembly Recovery Activities,Followup on Region 19 CRD Clevis Bolt Failures & Steam Generator Ring Header Problems IR 05000267/19890161989-09-26026 September 1989 Insp Rept 50-267/89-16 on 890716-0831.Violation Noted.Major Areas Inspected:Onsite Followup of Ler,Followup on Violations,Followup of Open Item,Review of Part 21 Repts & Review of Licensee Action of Events IR 05000267/19890131989-08-16016 August 1989 Insp Rept 50-267/89-13 on 890626-30.Violation Noted.No Deviations Noted.Major Areas Inspected:Radwaste Sys IR 05000267/19890141989-08-15015 August 1989 Insp Rept 50-267/89-14 on 890710-14.Violation Noted.Major Areas Inspected:Radiation Protection Program ML20245J5791989-08-10010 August 1989 Insp Rept 50-267/89-17 on 890717-21.Violations Noted.Major Areas Inspected:Licensee Programs for Instrument Calibr & Functional Testing of Diesel Fuel Oil Quality & Storage & Actions on Previously Identified Insp Findings ML20245H3971989-08-0808 August 1989 Insp Rept 50-267/89-12 on 890601-0715.Violation Noted.Major Areas Inspected:Onsite Followup of Lers,Operational Safety Verification & Monthly Surveillance & Maint Observations ML20248E0261989-08-0101 August 1989 Team Insp Rept 50-267/89-08 on 890522-26.Violations Noted. Major Areas Inspected:Maint Activities Re Reactor Water Cooling Sys (Sys 46) IR 05000267/19890151989-07-11011 July 1989 Insp Rept 50-267/89-15 on 890623-27.Violation Noted.Major Areas Inspected:Circumstances & Events Associated W/ Operation of Facility Above Authorized Max Power Level of 82% of Full Power IR 05000267/19890101989-06-15015 June 1989 Insp Rept 50-267/89-10 on 890501-31.No Violations Noted. Major Areas inspected:follow-up of Ler,Licensee Action on Previously Identified Insp Findings,Operational Safety Verification & Monthly Surveillance Observation ML20244C1301989-06-0101 June 1989 Insp Rept 50-267/89-07 on 890319-0430.Violations Noted.Major Areas Inspected:Previously Identified Insp Findings, Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation IR 05000267/19890061989-04-24024 April 1989 Partially Withheld Insp Rept 50-267/89-06 on 890313-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support & Security Program Plan & Protected & Vital Area Barriers ML20245C8341989-04-13013 April 1989 Insp Rept 50-267/89-03 on 890201-0318.Violations Noted. Major Areas Inspected:Lers,Reserve Shutdown Matl Removal, Operational Safety Verification,Radiological Controls, Monthly Surveillance Observation & Maint Observation IR 05000267/19890051989-04-12012 April 1989 Insp Rept 50-267/89-05 on 890306-10 & 13-17.No Violations Noted.Major Areas Inspected:Previously Identified Insp Items,Surveillance Procedures & Records,Allegation Followup & Preparations for Refueling IR 05000267/19890041989-03-16016 March 1989 Insp Rept 50-267/89-04 on 880227-0303.No Violations or Deviations Noted.Major Areas Inspected:Licensed Operator Training IR 05000267/19890011989-02-16016 February 1989 Partially Withheld Insp Rept 50-267/89-01 on 890109-13 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Licensee Physical Security Program Including Mgt Support, Security Program Plan,Audits & Security Training IR 05000267/19890021989-01-17017 January 1989 Insp Rept 50-267/89-02 on 890101-31.Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Insp Findings,Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation IR 05000267/19880211988-11-21021 November 1988 Insp Rept 50-267/88-21 on 880926-30.Violation & Deviations Noted.Major Areas Inspected:Implementation of & Compliance to Safe Shutdown Requirements of 10CFR50,App R IR 05000267/19880281988-11-18018 November 1988 Insp 50-267/88-28 Canceled & No Insp Rept to Be Issued for Rept Number ML20206M4311988-11-16016 November 1988 Insp Rept 50-267/88-25 on 880911-1022.Violations Noted. Major Areas Inspected:Previously Identified Insp Findings, Licensee Action in Response to NRC Bulletins,Operational Safety Verification & Monthly Maint Observation IR 05000267/19880261988-11-0404 November 1988 Insp Rept 50-267/88-26 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected:Failure of Emergency Diesel Generator Output Breakers to Automatically Close During 881011 Test & Routine Insp of Instrument Calibr IR 05000267/19880241988-10-12012 October 1988 Insp Rept 50-267/88-24 on 880926-30.No Violations or Deviations Noted.Major Areas inspected:safety-related Surveillance Testing & post-mod Testing IR 05000267/19880231988-10-0303 October 1988 Insp Rept 50-267/88-23 on 880912-16.Violations & Deviations Noted.Major Areas Inspected:Refurbishment of Reactor Helium Circulator IR 05000267/19880181988-09-29029 September 1988 Insp Rept 50-267/88-18 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Licensed Operator, Nonlicensed Staff & General Employee Training IR 05000267/19880201988-09-29029 September 1988 Insp Rept 50-267/88-20 on 880801-0910.Violations Noted. Major Areas Inspected:Operational Safety Verification,Ler Review,Monthly Maint Observations,Esf Walkdown,Radiological Protection & Security Observations ML20154N0081988-09-16016 September 1988 Insp Rept 50-267/88-17 on 880724-0802.Violations Noted. Major Areas Inspected:Licensee Radiation Protection Program ML20154E4341988-09-0808 September 1988 Insp Rept 50-267/88-15 on 880711-0805.Violation & Deviation Noted.Major Areas Inspected:Previous Insp Findings,Ler Followup,Control of Design Changes & Mods & Activities Re Refurbishment of Reactor Helium Circulators ML20155B8411988-09-0202 September 1988 Operational Safety Team Insp Rept 50-267/88-200 on 880509-20.Major Areas Inspected:Operations,Maint, Surveillance,Mgt Oversight,Safety Review & QA Programs IR 05000267/19880141988-09-0202 September 1988 Insp Rept 50-267/88-14 on 880725-0805.Violations & Deviations Noted.Major Areas Inspected:Followup of Previous Insp Findings,Status of Reg Guide 1.97 Implementation,Status of Generic Ltr 83-28 Implementation & Followup of LERs IR 05000267/19880191988-08-30030 August 1988 Partially Withheld Insp Rept 50-267/88-19 on 880810-11 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Safeguards Contingency Plan Implementation & Physical Protection of Safeguards Info IR 05000267/19880161988-08-26026 August 1988 Insp Rept 50-267/88-16 on 880701-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Ler Review,Monthly Maint Observation,Monthly Surveillance & Monthly Security Observation ML20151X4411988-08-11011 August 1988 Insp Rept 50-267/88-13 on 880601-30.Violation Noted.Major Areas Inspected:Licensee Action on NRC Bulletins,Operational Safety Verification,Followup of Allegations,Equipment Qualification Temp Profile & Radiological Protection ML20150C2571988-06-21021 June 1988 Insp Rept 50-267/88-12 on 880501-31.Deviation Noted.Major Areas Inspected:Operational Safety Verification,Ler Review, Monthly Maint Observation,Monthly Surveillance Observation, Radiological Protection & Monthly Security Observation IR 05000267/19880101988-06-0808 June 1988 Insp Rept 50-267/88-10 on 880401-30.Violations Noted.Major Areas Inspected:Followup of Licensee Action on Previously Identified Findings,Followup of Allegation 88-A-01, Operational Safety Verification & Fire Protection IR 05000267/19880111988-05-25025 May 1988 Insp Rept 50-267/88-11 on 880425-29.Violations Noted.Major Areas Inspected:Emergency Response Program,Including Training,Emergency Facilities,Equipment,Instrumentation & Supplies IR 05000267/19880091988-05-13013 May 1988 Insp Rept 50-267/88-09 on 880411-15.No Violations or Deviations Noted.Major Areas Inspected:Licensee Chemistry/ Radiochemistry Program & Water Chemistry & Radiochemistry Confirmatory Measurements IR 05000267/19880071988-05-12012 May 1988 Insp Rept 50-267/88-07 on 880301-31.Violations Noted.Major Areas Inspected:Followup of Licensee Action on Previously Identified Findings,Operational Safety Verification,Review of 10CFR50.59 Safety Evaluations & Radiological Protection IR 05000267/19880081988-04-19019 April 1988 Insp Rept 50-267/88-08 on 880321-25.Violations Noted.Major Areas Inspected:Qa Program,Implementation of 10CFR21,LER Followup & Actions on Previous Insp Findings ML20151R7491988-04-0808 April 1988 Partially Withheld Insp Rept 50-267/88-05 on 880229-0304 (Ref 10CFR73.21).Major Areas Inspected:Insp of Previously Identified Items,Security Plan & Procedures,Security Organization,Locks,Keys & Combinations & Protected Areas IR 05000267/19880041988-03-30030 March 1988 Insp Rept 50-267/88-04 on 880222-26.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection/ Prevention Program & Implementation IR 05000267/19880061988-03-25025 March 1988 Insp Rept 50-267/88-06 on 880229-0304.No Violations Noted. Major Areas Inspected:Licensee Actions Re IE Bulletin 85-003 1997-04-07
[Table view] Category:UTILITY
MONTHYEARIR 05000267/19900201990-11-14014 November 1990 Insp Rept 50-267/90-20 on 901029-1102.Noncitable Violation Noted.Major Areas Inspected:Insp of Fire Protection/ Prevention Program IR 05000267/19900141990-10-11011 October 1990 Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted IR 05000267/19900111990-08-15015 August 1990 Insp Rept 50-267/90-11 on 900601-0728.No Violations Noted. Major Areas Inspected:Onsite Followup of Ler,Operational Safety Verification,Monthly Maint Observation & Monthly Surveillance Observation IR 05000267/19900131990-08-0303 August 1990 Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program Including Emergency Detection & Classification,Knowledge & Performance of Duties IR 05000267/19900101990-07-25025 July 1990 Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Radioactive Matl Transportation Program,Liquid & Gaseous Radwaste Mgt Programs,Including Radiological Effluent Releases IR 05000267/19890191989-10-0202 October 1989 Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted.Major Areas Inspected:Region 19 CRD Assembly Recovery Activities,Followup on Region 19 CRD Clevis Bolt Failures & Steam Generator Ring Header Problems IR 05000267/19890161989-09-26026 September 1989 Insp Rept 50-267/89-16 on 890716-0831.Violation Noted.Major Areas Inspected:Onsite Followup of Ler,Followup on Violations,Followup of Open Item,Review of Part 21 Repts & Review of Licensee Action of Events IR 05000267/19890131989-08-16016 August 1989 Insp Rept 50-267/89-13 on 890626-30.Violation Noted.No Deviations Noted.Major Areas Inspected:Radwaste Sys IR 05000267/19890141989-08-15015 August 1989 Insp Rept 50-267/89-14 on 890710-14.Violation Noted.Major Areas Inspected:Radiation Protection Program ML20245J5791989-08-10010 August 1989 Insp Rept 50-267/89-17 on 890717-21.Violations Noted.Major Areas Inspected:Licensee Programs for Instrument Calibr & Functional Testing of Diesel Fuel Oil Quality & Storage & Actions on Previously Identified Insp Findings ML20245H3971989-08-0808 August 1989 Insp Rept 50-267/89-12 on 890601-0715.Violation Noted.Major Areas Inspected:Onsite Followup of Lers,Operational Safety Verification & Monthly Surveillance & Maint Observations ML20248E0261989-08-0101 August 1989 Team Insp Rept 50-267/89-08 on 890522-26.Violations Noted. Major Areas Inspected:Maint Activities Re Reactor Water Cooling Sys (Sys 46) IR 05000267/19890151989-07-11011 July 1989 Insp Rept 50-267/89-15 on 890623-27.Violation Noted.Major Areas Inspected:Circumstances & Events Associated W/ Operation of Facility Above Authorized Max Power Level of 82% of Full Power IR 05000267/19890101989-06-15015 June 1989 Insp Rept 50-267/89-10 on 890501-31.No Violations Noted. Major Areas inspected:follow-up of Ler,Licensee Action on Previously Identified Insp Findings,Operational Safety Verification & Monthly Surveillance Observation ML20244C1301989-06-0101 June 1989 Insp Rept 50-267/89-07 on 890319-0430.Violations Noted.Major Areas Inspected:Previously Identified Insp Findings, Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation IR 05000267/19890061989-04-24024 April 1989 Partially Withheld Insp Rept 50-267/89-06 on 890313-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support & Security Program Plan & Protected & Vital Area Barriers ML20245C8341989-04-13013 April 1989 Insp Rept 50-267/89-03 on 890201-0318.Violations Noted. Major Areas Inspected:Lers,Reserve Shutdown Matl Removal, Operational Safety Verification,Radiological Controls, Monthly Surveillance Observation & Maint Observation IR 05000267/19890051989-04-12012 April 1989 Insp Rept 50-267/89-05 on 890306-10 & 13-17.No Violations Noted.Major Areas Inspected:Previously Identified Insp Items,Surveillance Procedures & Records,Allegation Followup & Preparations for Refueling IR 05000267/19890041989-03-16016 March 1989 Insp Rept 50-267/89-04 on 880227-0303.No Violations or Deviations Noted.Major Areas Inspected:Licensed Operator Training IR 05000267/19890011989-02-16016 February 1989 Partially Withheld Insp Rept 50-267/89-01 on 890109-13 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected: Licensee Physical Security Program Including Mgt Support, Security Program Plan,Audits & Security Training IR 05000267/19890021989-01-17017 January 1989 Insp Rept 50-267/89-02 on 890101-31.Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Insp Findings,Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation IR 05000267/19880211988-11-21021 November 1988 Insp Rept 50-267/88-21 on 880926-30.Violation & Deviations Noted.Major Areas Inspected:Implementation of & Compliance to Safe Shutdown Requirements of 10CFR50,App R IR 05000267/19880281988-11-18018 November 1988 Insp 50-267/88-28 Canceled & No Insp Rept to Be Issued for Rept Number ML20206M4311988-11-16016 November 1988 Insp Rept 50-267/88-25 on 880911-1022.Violations Noted. Major Areas Inspected:Previously Identified Insp Findings, Licensee Action in Response to NRC Bulletins,Operational Safety Verification & Monthly Maint Observation IR 05000267/19880261988-11-0404 November 1988 Insp Rept 50-267/88-26 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected:Failure of Emergency Diesel Generator Output Breakers to Automatically Close During 881011 Test & Routine Insp of Instrument Calibr IR 05000267/19880241988-10-12012 October 1988 Insp Rept 50-267/88-24 on 880926-30.No Violations or Deviations Noted.Major Areas inspected:safety-related Surveillance Testing & post-mod Testing IR 05000267/19880231988-10-0303 October 1988 Insp Rept 50-267/88-23 on 880912-16.Violations & Deviations Noted.Major Areas Inspected:Refurbishment of Reactor Helium Circulator IR 05000267/19880181988-09-29029 September 1988 Insp Rept 50-267/88-18 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Licensed Operator, Nonlicensed Staff & General Employee Training IR 05000267/19880201988-09-29029 September 1988 Insp Rept 50-267/88-20 on 880801-0910.Violations Noted. Major Areas Inspected:Operational Safety Verification,Ler Review,Monthly Maint Observations,Esf Walkdown,Radiological Protection & Security Observations ML20154N0081988-09-16016 September 1988 Insp Rept 50-267/88-17 on 880724-0802.Violations Noted. Major Areas Inspected:Licensee Radiation Protection Program ML20154E4341988-09-0808 September 1988 Insp Rept 50-267/88-15 on 880711-0805.Violation & Deviation Noted.Major Areas Inspected:Previous Insp Findings,Ler Followup,Control of Design Changes & Mods & Activities Re Refurbishment of Reactor Helium Circulators ML20155B8411988-09-0202 September 1988 Operational Safety Team Insp Rept 50-267/88-200 on 880509-20.Major Areas Inspected:Operations,Maint, Surveillance,Mgt Oversight,Safety Review & QA Programs IR 05000267/19880141988-09-0202 September 1988 Insp Rept 50-267/88-14 on 880725-0805.Violations & Deviations Noted.Major Areas Inspected:Followup of Previous Insp Findings,Status of Reg Guide 1.97 Implementation,Status of Generic Ltr 83-28 Implementation & Followup of LERs IR 05000267/19880191988-08-30030 August 1988 Partially Withheld Insp Rept 50-267/88-19 on 880810-11 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Safeguards Contingency Plan Implementation & Physical Protection of Safeguards Info IR 05000267/19880161988-08-26026 August 1988 Insp Rept 50-267/88-16 on 880701-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Ler Review,Monthly Maint Observation,Monthly Surveillance & Monthly Security Observation ML20151X4411988-08-11011 August 1988 Insp Rept 50-267/88-13 on 880601-30.Violation Noted.Major Areas Inspected:Licensee Action on NRC Bulletins,Operational Safety Verification,Followup of Allegations,Equipment Qualification Temp Profile & Radiological Protection ML20150C2571988-06-21021 June 1988 Insp Rept 50-267/88-12 on 880501-31.Deviation Noted.Major Areas Inspected:Operational Safety Verification,Ler Review, Monthly Maint Observation,Monthly Surveillance Observation, Radiological Protection & Monthly Security Observation IR 05000267/19880101988-06-0808 June 1988 Insp Rept 50-267/88-10 on 880401-30.Violations Noted.Major Areas Inspected:Followup of Licensee Action on Previously Identified Findings,Followup of Allegation 88-A-01, Operational Safety Verification & Fire Protection IR 05000267/19880111988-05-25025 May 1988 Insp Rept 50-267/88-11 on 880425-29.Violations Noted.Major Areas Inspected:Emergency Response Program,Including Training,Emergency Facilities,Equipment,Instrumentation & Supplies IR 05000267/19880091988-05-13013 May 1988 Insp Rept 50-267/88-09 on 880411-15.No Violations or Deviations Noted.Major Areas Inspected:Licensee Chemistry/ Radiochemistry Program & Water Chemistry & Radiochemistry Confirmatory Measurements IR 05000267/19880071988-05-12012 May 1988 Insp Rept 50-267/88-07 on 880301-31.Violations Noted.Major Areas Inspected:Followup of Licensee Action on Previously Identified Findings,Operational Safety Verification,Review of 10CFR50.59 Safety Evaluations & Radiological Protection IR 05000267/19880081988-04-19019 April 1988 Insp Rept 50-267/88-08 on 880321-25.Violations Noted.Major Areas Inspected:Qa Program,Implementation of 10CFR21,LER Followup & Actions on Previous Insp Findings ML20151R7491988-04-0808 April 1988 Partially Withheld Insp Rept 50-267/88-05 on 880229-0304 (Ref 10CFR73.21).Major Areas Inspected:Insp of Previously Identified Items,Security Plan & Procedures,Security Organization,Locks,Keys & Combinations & Protected Areas IR 05000267/19880041988-03-30030 March 1988 Insp Rept 50-267/88-04 on 880222-26.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection/ Prevention Program & Implementation IR 05000267/19880061988-03-25025 March 1988 Insp Rept 50-267/88-06 on 880229-0304.No Violations Noted. Major Areas Inspected:Licensee Actions Re IE Bulletin 85-003 ML20150F0081988-03-25025 March 1988 Insp Rept 50-267/88-03 on 880201-29.Violations Noted.Major Areas Inspected:Licensee Action on Previously Identified Findings,Operational Safety Verification,Followup of Unusual Events,Esf Walkdown & Physical Security Observation IR 05000267/19880021988-02-22022 February 1988 Insp Rept 50-267/88-02 on 880125-29.No Violations Noted. Major Areas Inspected:Changes to Emergency Plan,Shift Staffing & Augmentation,Knowledge & Performance of Duties & Operational Status of Emergency Preparedness Program IR 05000267/19880011988-02-16016 February 1988 Insp Rept 50-267/88-01 on 880101-31.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety Verification,Followup of NRC Bulletin,Licensee Action on Lers,Core Safety Limit & Monthly Surveillance IR 05000267/19870341988-02-0202 February 1988 Insp Rept 50-267/87-34 on 871122-1231.Violations Noted. Major Areas Inspected:Operational Safety Verification, Followup of Allegation 4-86-A-119,followup of NRC Compliance Bulletin 87-002 & Monthly Security Observation ML20148T5801988-01-25025 January 1988 Insp Rept 50-267/87-32 on 871116-1204.No Violations or Deviations Noted.Major Areas Inspected:Fire Recovery Activities in Response to 871002 Fire 1990-08-03
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000267/19970011997-04-0707 April 1997 Insp Rept 50-267/97-01 on 970310-11.No Violations Noted. Major Areas Inspected:Reviews of Status of Radiation Protection,Environ Monitoring & Radwaste Mgt Programs IR 05000267/19960051996-12-23023 December 1996 Insp Rept 50-267/96-05 on 961203-05.No Violations Noted. Major Areas Inspected:Access Licensees Implementation of Radiation Protection Program & Decommissioning Plan & Included Reviews of Status of Radiation Protection IR 05000267/19940031996-04-0202 April 1996 Revised NOV from Insp Rept 50-267/94-03.Violation Noted: Contractor to Licensee Submitted Inaccurate Radiation Surveys ML20136B3051996-04-0202 April 1996 Revised NOV from Insp Rept 50-267/94-03.Violation Noted: Numerous Required Records of Radiation Surveys Were Created Which Were Not Complete & Accurate ML20137H1731995-08-17017 August 1995 Investigation Rept 4-95-015.Noncompliance Noted.Major Areas Investigated:Alleged Deliberate Failure of Contract Employee to Perform Daily Response Checks on Portable Contamination Monitor ML20137K0551995-05-26026 May 1995 Investigation Rept 4-94-010 on 950526.No Noncompliance Noted.Major Areas Investigated:Allegations Re Falsification of Radiation Survey Records ML20058P5931993-10-12012 October 1993 EN-93-101:on 931012,notice of Proposed Imposition of Civil Penalty in Amount of $80,000 Issued to Licensee.Action Discussed in SECY-93-263 & Approved by Commission on 931007 ML20062H8191990-11-29029 November 1990 Notice of Violation from Insp on 901022-26.Violation Noted: Test of Protected Area Intrusion Detection Zones Defeated by Testing Personnel Jumping Over Zone IR 05000267/19900171990-11-29029 November 1990 Insp Rept 50-267/90-17 on 901001-1109.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety, Monthly Surveillance & Maint Observation IR 05000267/19900181990-11-20020 November 1990 Partially Withheld Insp Rept 50-267/90-18 on 901022-26. Violation Noted.Major Areas Inspected:Physical Security Program,Including Protected & Vital Area Barriers,Detection & Assessment Aidscommunications,Testing,Packages & Maint IR 05000267/19900191990-11-16016 November 1990 Insp Rept 50-267/90-19 on 901015-19.No Violations or Deviations Noted.Areas Inspected:Stated Radiological Controls IR 05000267/19900201990-11-14014 November 1990 Insp Rept 50-267/90-20 on 901029-1102.Noncitable Violation Noted.Major Areas Inspected:Insp of Fire Protection/ Prevention Program ML20058E4951990-10-30030 October 1990 Notice of Violation from Insp on 900928.Violation Noted: Licensee Did Not Perform Radiation & Airborne Surveys Before Allowing Special Svcs Licensed Operator to Enter Hot Svc Facility to Remove Five Unshielded Radioactive Samples IR 05000267/19900141990-10-11011 October 1990 Insp Rept 50-267/90-14 on 900801-0930.No Violations or Deviations Noted IR 05000267/19900111990-08-15015 August 1990 Insp Rept 50-267/90-11 on 900601-0728.No Violations Noted. Major Areas Inspected:Onsite Followup of Ler,Operational Safety Verification,Monthly Maint Observation & Monthly Surveillance Observation IR 05000267/19900131990-08-0303 August 1990 Insp Rept 50-267/90-13 on 900709-13.No Violations or Deviations Noted.Major Areas Inspected:Emergency Preparedness Program Including Emergency Detection & Classification,Knowledge & Performance of Duties IR 05000267/19900101990-07-25025 July 1990 Insp Rept 50-267/90-10 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected:Radioactive Matl Transportation Program,Liquid & Gaseous Radwaste Mgt Programs,Including Radiological Effluent Releases IR 05000267/19890191989-10-0202 October 1989 Insp Rept 50-267/89-19 on 890821-26 & 29-30.No Violations or Deviations Noted.Major Areas Inspected:Region 19 CRD Assembly Recovery Activities,Followup on Region 19 CRD Clevis Bolt Failures & Steam Generator Ring Header Problems ML20248B3051989-09-26026 September 1989 Notice of Violation from Insp on 890716-0831.Violation Noted:Four Reactor Engineers Worked on safety-related Test of Reactor Core Beyond Tech Specs Limit W/O Documented Authorization IR 05000267/19890161989-09-26026 September 1989 Insp Rept 50-267/89-16 on 890716-0831.Violation Noted.Major Areas Inspected:Onsite Followup of Ler,Followup on Violations,Followup of Open Item,Review of Part 21 Repts & Review of Licensee Action of Events PNO-IV-89-055, on 890829,Board of Directors Directed Termination of Nuclear Operations at Facility for 100-day Cooldown Period in Preparation for 30-month Reactor Defueling.Nrc Currently Reviewing Defueling Safety Analysis1989-08-29029 August 1989 PNO-IV-89-055:on 890829,Board of Directors Directed Termination of Nuclear Operations at Facility for 100-day Cooldown Period in Preparation for 30-month Reactor Defueling.Nrc Currently Reviewing Defueling Safety Analysis PNO-IV-89-052C, updates 890818,21 & 23 Unplanned Reactor Shutdowns Due to Inoperable Control Rod.Control Rod Assembly Will Be Removed Using Bldg Crane.Aluminum Shutter Will Be Remotely Placed on Bottom of Canister1989-08-25025 August 1989 PNO-IV-89-052C:updates 890818,21 & 23 Unplanned Reactor Shutdowns Due to Inoperable Control Rod.Control Rod Assembly Will Be Removed Using Bldg Crane.Aluminum Shutter Will Be Remotely Placed on Bottom of Canister PNO-IV-89-052B, on 890823,unplanned Reactor Shutdown Due to Inoperable Control Rod.Licensee Plans to Remove Control Rod Pair W/Bldg Crane in Unshielded Configuration to Shielded, Contained Evolution1989-08-23023 August 1989 PNO-IV-89-052B:on 890823,unplanned Reactor Shutdown Due to Inoperable Control Rod.Licensee Plans to Remove Control Rod Pair W/Bldg Crane in Unshielded Configuration to Shielded, Contained Evolution PNO-IV-89-052A, on 890818,after Attempting to Withdraw & Insert Control Rod Pair from Region 19,control Rod Motor Stopped Drawing Current & Indicated Open Conductor or Thermal Overload.Pair Will Be Withdrawn Using Bldg Crane1989-08-21021 August 1989 PNO-IV-89-052A:on 890818,after Attempting to Withdraw & Insert Control Rod Pair from Region 19,control Rod Motor Stopped Drawing Current & Indicated Open Conductor or Thermal Overload.Pair Will Be Withdrawn Using Bldg Crane ML20246E6011989-08-21021 August 1989 Notice of Violation from Insp on 890710-14.Violation Noted:From 890101-0712,only Three of Seven Shipments of Nonexempt Radioactive Matls Had Current License on File PNO-IV-89-052, on 890817,unplanned Reactor Shutdown Due to Inoperable Control Rod Drive Occurred.Attempts to Clear Cause of Slack Cable Light Failed.Loop 2 Shutdown Due to Upset in Bearing Water Sys Occurred During Plant Shutdown1989-08-18018 August 1989 PNO-IV-89-052:on 890817,unplanned Reactor Shutdown Due to Inoperable Control Rod Drive Occurred.Attempts to Clear Cause of Slack Cable Light Failed.Loop 2 Shutdown Due to Upset in Bearing Water Sys Occurred During Plant Shutdown IR 05000267/19890131989-08-16016 August 1989 Insp Rept 50-267/89-13 on 890626-30.Violation Noted.No Deviations Noted.Major Areas Inspected:Radwaste Sys IR 05000267/19890141989-08-15015 August 1989 Insp Rept 50-267/89-14 on 890710-14.Violation Noted.Major Areas Inspected:Radiation Protection Program ML20245J5721989-08-10010 August 1989 Notice of Violation from Insp on 890717-21.Violation Noted: Procedures Covering Timely Testing of Reactor Protection Sys Startup Channel & Periodic Test & Calibr of Diesel Engine Overspeed Trip for diesel-driven Fire Pump Not Established ML20245J5791989-08-10010 August 1989 Insp Rept 50-267/89-17 on 890717-21.Violations Noted.Major Areas Inspected:Licensee Programs for Instrument Calibr & Functional Testing of Diesel Fuel Oil Quality & Storage & Actions on Previously Identified Insp Findings ML20246A7061989-08-0909 August 1989 Exam Rept 50-267/OL 89-02 During Wk of 890710.Exam Results: Three of Four Limited Senior Reactor Operator Applicants Passed Exam.Answer Key Encl ML20245H3941989-08-0808 August 1989 Notice of Violation from Insp on 890628.Violation Noted:On 890625,util Failed to Verify Positioning of HS-6335 to Tank 1 B,Resulting in Unanalyzed Gaseous Waste Release ML20245H3971989-08-0808 August 1989 Insp Rept 50-267/89-12 on 890601-0715.Violation Noted.Major Areas Inspected:Onsite Followup of Lers,Operational Safety Verification & Monthly Surveillance & Maint Observations ML20248E0101989-08-0303 August 1989 Notice of Violation from Insp on 880522-26.Violations Noted: Inadequate Testing of cross-connect Valves Per Tech Spec SR 5.3.4 & Failure to Test High Flow Alarms Per Tech Spec SR 5.4.5 ML20248E0261989-08-0101 August 1989 Team Insp Rept 50-267/89-08 on 890522-26.Violations Noted. Major Areas Inspected:Maint Activities Re Reactor Water Cooling Sys (Sys 46) ML20247L6141989-07-14014 July 1989 Notice of Violation from Insp on 890623-27.Violation Noted: Failure to Provide Adequate Administrative Control of Plant Changes That Affect safety-related Plant Procedures IR 05000267/19890151989-07-11011 July 1989 Insp Rept 50-267/89-15 on 890623-27.Violation Noted.Major Areas Inspected:Circumstances & Events Associated W/ Operation of Facility Above Authorized Max Power Level of 82% of Full Power PNO-IV-89-044, on 890628,pressure in Waste Gas Receiver a Decreased from 250 Psig & Pressure in Receiver a Decreased from 60 to 50 Psig.Caused by Erroneous Valve Lineup.Plant Stack Monitors Did Not Alarm1989-06-28028 June 1989 PNO-IV-89-044:on 890628,pressure in Waste Gas Receiver a Decreased from 250 Psig & Pressure in Receiver a Decreased from 60 to 50 Psig.Caused by Erroneous Valve Lineup.Plant Stack Monitors Did Not Alarm PNO-IV-89-040, from 890622-23,power Exceeded 82% & Secondary Heat Balance Indication in Control Room Read Approx 79.2%.On 890623,discovered Incorrect Input Into Secondary Heat Balance Calculation.Power Reduced to 65% Pending Evaluation1989-06-23023 June 1989 PNO-IV-89-040:from 890622-23,power Exceeded 82% & Secondary Heat Balance Indication in Control Room Read Approx 79.2%.On 890623,discovered Incorrect Input Into Secondary Heat Balance Calculation.Power Reduced to 65% Pending Evaluation ML20245G4781989-06-22022 June 1989 Exam Rept 50-267/OL-9-01 on 890523-25.Exam Results:Two Senior Reactor Operator & Three Reactor Operator Candidates Passed All Portions of Exams & Issued Appropriate Licenses. One Reactor Operator Failed Written Exam IR 05000267/19890101989-06-15015 June 1989 Insp Rept 50-267/89-10 on 890501-31.No Violations Noted. Major Areas inspected:follow-up of Ler,Licensee Action on Previously Identified Insp Findings,Operational Safety Verification & Monthly Surveillance Observation ML20244C1271989-06-0808 June 1989 Notice of Violation from Insp on 890324-0430.Violations Noted:Two Examples of Failing to Comply W/Tech Spec Requirements & Inadequate Control of Replacement Parts for safety-related Equipment ML20244C1301989-06-0101 June 1989 Insp Rept 50-267/89-07 on 890319-0430.Violations Noted.Major Areas Inspected:Previously Identified Insp Findings, Operational Safety Verification,Monthly Surveillance Observation & Monthly Maint Observation PNO-IV-89-036, on 890529,two Teenagers Shot by off-duty Security Guard Following Confrontation Re Assault.Guard Arrested & Being Held for Murder.Licensee Plans to Issue Press Release.State of Co Will Be Informed.Record Copy1989-05-30030 May 1989 PNO-IV-89-036:on 890529,two Teenagers Shot by off-duty Security Guard Following Confrontation Re Assault.Guard Arrested & Being Held for Murder.Licensee Plans to Issue Press Release.State of Co Will Be Informed.Record Copy PNO-IV-89-031, on 890427,CRD 3 Failed to Insert on Scram During Performance of Weekly Partial Insertion Scram Tests. Troubleshooting Confirmed That CRD Brake Deenergized & That Rod Out Limit Cleared.Licensee Plans to Replace CRDs 3 & 71989-04-28028 April 1989 PNO-IV-89-031:on 890427,CRD 3 Failed to Insert on Scram During Performance of Weekly Partial Insertion Scram Tests. Troubleshooting Confirmed That CRD Brake Deenergized & That Rod Out Limit Cleared.Licensee Plans to Replace CRDs 3 & 7 IR 05000267/19890061989-04-24024 April 1989 Partially Withheld Insp Rept 50-267/89-06 on 890313-17 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support & Security Program Plan & Protected & Vital Area Barriers ML20245C8311989-04-14014 April 1989 Notice of Violation from Insp on 890217.Violation Noted: Stairway of Reactor Bldg Utilized by Potentially Contaminated Individuals Prior to Performing Whole Body Frisk & by Individuals Exiting Area After Frisking ML20245C8341989-04-13013 April 1989 Insp Rept 50-267/89-03 on 890201-0318.Violations Noted. Major Areas Inspected:Lers,Reserve Shutdown Matl Removal, Operational Safety Verification,Radiological Controls, Monthly Surveillance Observation & Maint Observation IR 05000267/19890051989-04-12012 April 1989 Insp Rept 50-267/89-05 on 890306-10 & 13-17.No Violations Noted.Major Areas Inspected:Previously Identified Insp Items,Surveillance Procedures & Records,Allegation Followup & Preparations for Refueling IR 05000267/19870351989-04-0707 April 1989 Final SALP Rept 50-267/87-35 for May 1987 - Aug 1988. Category 1 Assigned in Areas of Maint,Fire Protection & Radiological Controls 1997-04-07
[Table view] |
Text
'
y, .
APPENDIX B i U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report: 50-267/87-10 License: DPR-34 Docket: 50-267 Licensee: Public Service Company of Colorado (PSC)
P.O. Box 840 Denver, Colorado 80201 Facility Name: Fort St. Vrain Nuclear Generating Station (FSV)
Inspection At: Platteville, Colorado Inspection Conducted: ' April 6-10 and 20-24,1987 (onsite) to May 1,1987 (NRC Region IV office)
inspector: . zr pynp Y7S & jh1/87
__. R. Jot nson, Reactor Inspector (Nuclear
~
Date Engine r), Reactor Safety Branch
'/
Also participating in the inspection and contributing to the report was:
R. E. Ireland, Chief, Engineering Section, Reactor Safety Branch, RIV Approved: k$.
R.~ reland, Cri ef, Enginee ing Section 6/29h]
Date Reactor Safety Branch Inspection Summary Inspection Conducted April 6-10 and 20-24,1987 (Onsite) to May 1,1987 (NRC Region IV Office), Report 50-267/87-10)
Areas Inspected: Unannounced NRC inspection and post-impleinentation review of a program for establishing and maintaining the qualification of electric equipment within the scope of 10 CFR 50.4 During the first round NRC equipment qualification (EQ) special team inspection conducted at FSV on January 26-30. 1987 (NRC Inspection Report 50-267/87-04),
two violations (Potential Enforcement / Unresolved Items) and five open items 8707280314 870721 PDR ADOCK 05000267 G PDR
.____- -___________ -
_
--_ - _ _ - _ - _ _ _ _ _ - _ ___- - - - _ - - - _ - - - _ _ _
f
'k
? '
-.
1 were identified. PSC has since completed corrective actions. Two of the five open-items involve an evaluation and review of the overall implementation of the;PSC EQ maintenance and procurement program Results: JThe inspection and post-implementation' review determined that the L
licensee's commitments to meet the requirements of 10 CFR 50.49 have been
. satisfactorily accomplished by implementing the corrective action necessary to-close out the deficiencies identified during the NRC EQ special team inspection of January 20-26, 198 Corrective action for two violations regarding: (1)qualificationoffirst generation Rockbestos coaxial. cable, and (2) qualification of certain Raychem installed electrical- splice configurations, have been satisfactorily accomplished in that the EQ qualification files (EQFs) now adequately establish qualification-for these components.-
.
Two open items in regard to the implementation of the PSC EQ maintenance and procurement programs have been closed out, in that both of these programs are
'
currently being implemented . satisfactoril The three remaining open~ items regarding: (1)ASCOsolenoidvalveconduit installations; (2) EQ cable binder upgrades; and (3) Limitorque valve operator vertical conduit entrances, have also been closed ou Within the area inspected, no new violations, deviations, er unresolved /open items were identifie '
!
h
,
,
l i
)
'j
-- . * .
DETAILS Persons Contacted Licensee Personnel
+ Brey, Manager, Nuclear Licensing and Fuel (NLF)
- +D. Warembourg, Manager, Nuclear Engineering Division (NED)
- J. Eggebroten, Superintendent, Technical Services, Engineering
+M. Lehr, Supervisor, Quality Assurance (QA) Engineering
- +R. Craun, Site Engineering Manager, NED
- J. Grambling, Supervisor, Nuclear Licensing, Operations R. Doyle, Engineer, QA
- M. Ferris, QA Operations Manager
- +T. Prenger, QA Services Manager
- + Brown, Supervisor,I&C,NuclearProductDivision(NPD)
+ Fuller,' Station Manager
- R. Williams, Vice President, Nuclear Operations
+ Niehoff, PSC Nuclear Design Manager, NPD
- +F. Novachek, PSC Technical / Administrative Services Manager, NPD W. Pressley, PSC, Procurement
+T. McIntire, PSC, NED M. Lindinsky, Procurement Specialist, Stone & Webster Engineering Corporation
- H. Hagan, Outage Manager, NPD M. Fedie, PSC I&C, NBD
+L. Sutton, PSC QA
+S. Smith, PSC QA i
'
- +J. Waage, Manager, Projects & Engineering, SMSC
- S. Marguez, PSC EQ Coordinator, NED
- M. Holmes, PSC Nuclear Licensing Manager
- +J. Reesy, PSC Staff Assistant, NED
- W. Franek, PSC Superintendent, Planning / Scheduling / Stores ;
+K. Owens, PSC, NLF j NRC Personnel
- +R. Farrell, Senior Resident Inspector, RIV }
W. Bennett, Reactor Inspector, RIV
- + Ireland, Johnson, Chief, ReactorEngineering Inspector- (Nuclear Engineer), RIV
<
- Present at exit meeting April 10, 198 +Present at exit meeting April 24, 198 '
I
_ ______ ____________ _A
_ - _ _ _ _ _ _
!. !
u l
'.- '.
4 , I 2. Purpose, The purpose.at this inspection was a post-implementation review of the licensee's comitments with regard to the requirements of 10 C'R 50.4 . Background In the fall of 1985, PSC requested that the NRC grant FSV an extension of the November 30, 1985, deadline for meeting the EQ requirements for 10 CFR 50.49. This request was documented in PSC letters dt.ted September 24, October 22, and November 22, 1985. The extension request was granted in Commission Memorandum and Order dated November 26, 198 This' extension allowed operation of the plant until May 31, 1986, with reactor power' level limited to 35 percent. .At that time, the plant was shutdown and modifications for compliance.with 10 CFR 50.49 were begu Included in the Commission Memorandum and Order was the condition that operation of the plant after May 31, 1986, would only be allowed when the FSV EQ program was completed and approved by the Director, Nuclear Reactor Regulation (NRR).
Based on PSC-submittals dated May 12. June 20, July 28, and 31, 1986, a Final EQ Safety Evaluation Report (SER) was issued for FSV on September 10, 198 As a result of the NRC.first round EQ special team inspection conducted January 26-30, 1987, the NRC determined that PSC had implemented a program to meet the violations andrequirements of 10 five open items CFR (NRC 50.49 with Inspection Report the e>.ception of two50-267/87-04) p .
On March 23, 1987, the " Enforcement Criteria for EQ Enforcement" (enclosure to Generic Letter 86-15) was approved by the Commissio On March 31, 1987, PSC certified to the NRC: (1) the completion of EQ related issues; (2) that the PSC EQ program is &n place and satisfies the requirements of 10 CFR 50.49; (3) the availabil11ty of at least one path.to safe shutdown using fully qualified equipment'available; and (4) that all other equipment within the scope of 10 CFR 50.43 is fully qualifie On April 3,1987, PSC received approval from NRil of the FSV EQ program in that it has been completed as specified in the f,ommission Memorandum and Order abov On April 6,1987, PSC received authorization for interim operation of FSV ,
at 35 percent of full power. The Commission iss ued a Confirmatory Order Modifying License to PSC to operate FSV based or the commitments contained in PSC letter dated January 30, 1987 (P-87038), and subject to NRC post-implementation review and inspection The post-implementation review of a program for establishing and maintaining the qualification of electric equipmant within the scope of
. - - _ _ _ _ _ - _ _ - _ _ _ _ _ - _ - _ _ _ _ .___ _ - _ _ -
_ __ _ _ _ _ _ _ _ _ _ __ _ _- _- _ . _ - _ -
I
- f
- . .,
,
'
i i
' CFR 50.49 involved onsite and subsequent in-office inspection of PSC rt rds furnished by the license . EQ Preventive and Corrective Maintenance (PM/CM) Program; Open Item 50-Z67/8/04-02 (Closed)
The NRC inspectors reviewed the implementation of the FSV EQ preventive m&intenance (PM) and corrective maintenance (CM) program The NRC inspectors selected five PM/CM packages in accordance with PSC Procedure SMAP-27 to verify the methodology used by the licensee to identify, review, and incorporate maintenance information for plant EQ equipment into the PSC PM and CM programs for FSV. . Procedure SMAP-27 :
applies to the review and incorporation of information into the PM/CM programs from manufacturer / vendor maintenance manuals e EQ binders, and external sources of maintenance information for EQ equipment installed at FSV. Each PM/CM package contains the completed SMAP-27 attachment sheets (controls) which were reviewed by the NRC inspectors to verify that implementation of all maintenance information were being identified, 7 adequately reviewed, and incorporated into a computerized data information
- system known as the " plant preventive mr.intenance information
-
system (PPMIS)." The SMAP-27 attachment sheets reviewed by the NRC inspectors included information such as: (1) maintenance requirement reviews; (2) independent review checklists; (3) comment worksheets (which identify the preparers recommendations); (4) maintenance worksheets (which identify the.PM and lubrication tasks); (5) input data sheets (which describe the PM tasks in detail such as precautions, procedures, special tools, and parts); (6) plant lubrication sheets; (7) spare parts sheets; (8) procedure information sheets (incorporate required PSC procedure changes); (9) equipment tag number sheets; (10) station service request (SSR) addendum sheets; (11) corrective maintenance worksheets, and (12)operationsinputsheets. The five PM/CM packages reviewed by the NRC inspectors are listed as follows:
SMAP Package /
Date Approved Equipment EQ,BinderN February 24, 1987 ASCO solenoid valves, EQ-FSV-47 model K206-380-2VU
March 13, 1987 Foxboro pressure trans-- EQ-FSV-19 mitters, model N-E11GH HIM2-C-E-L December 27, 1986 General Electric panel EQ-FSV-18 push button switches, model CR2940-U201 November 18, 1986 Microswitch limit switches, EQ-FSV-4 model BZE6-2RN
_ _ . - - _-
-_ _ -_ -
< '
, .
6 6 i
i November 18, 1986 NAMCO limit switches, EQ-FSV-6 model EA-180-31302 In addition, the NRC inspectors reviewed the implementation of the FSV planning and discipline scheduling function, on receipt of the SMAP-27 .
input sheets for the above five PM/CM packages, in accordance with NPAP-13
" Preventive Maintenance Planning / Scheduling Implementation." Also, the NRC inspectors reviewed the station service request (SSR) work planning function in accordance with SMP-29 " Station Service Request Work This included NRC inspector reviews of the SMAP-29 attachments Planning (controls ") such as (1) work pitnning sheets; (2) planners controlled work instructions; (3) SSR data field change requests; and (4) material requirements list. In addition, the NRC inspectors reviewed and verified ,
the NPD coordinators functions in generating the following PPMIS !
schedules: (1) weekly schedule; (2) weekly prioritized PM's to be '
completed schedule; (3) look ahead schedule (16 weeks); and (4) as required look ahead schedule identifying added PM's in accordance with SMAP-27 review The NRC inspectors reviewed and terified the implementation of the SSR processing in accordance with Procedure P-7 " Station Service Request Processing." Two sample SSR work packages were reviewed by the NRC inspectors involving pressure switches and solenoid operated shutoff valves to the FSV instrument air compressor 1A. It should be noted that surveillance testing to meet Technical Specification (TS) requirements do not require SSR's for PM. The NRC inspectors reviewed the implementation of each of the P-7 attachments (controls) for the SSR work packages which included the SSR rejection process and categories. Also, implementation of SMAP-25 "EQ Review of SSR's" was verified by the NRC inspectors. The NRC inspectors reviewed the SSR work packages for adequacy of the EQ program to maintain equipment qualification. Also, these two packages showed evidence that they were reviewed by NED for trending, deficient conditions, and other feedback infomation. At FSV the SSR flow for CM activities is identical to SSR flow for PM activities, with the exception that PM activities involve steps that are preplanned or preperformed. The FSV maintenance program uses PPMIS to track work flow and assist work control. The detailed use of PPMIS is in accordance with Procedure NRMM-10 reviewed by the NRC inspectors. The guidelines for PM and CM requirements, in accordance wdth Procedure NPAP-11 were reviewed by the NRC inspectors. These included: (1) lubrication programs; (2) stores parts inventory and controls; (3) procedure development; (4) frequency of PM; and (5) preparation and use of model SSR's.
i The FSV operations department incorporates the PM/CM activities required to meet the TS requirements for surveillance testing (ST) in accordance with Procedure SMAP-1 " Technical Specification Surveillance Testing Program." The NRC inspectors verified the 15 information as correct for one SMAP-27 work package (Foxboro N-E10 Series transmitters).
l
- - - -
w ,
,, 3 s
'
< s Yp
. , t
"
'
'
- (,L !) s.
- s!' ,
,a
- ),7 4 , '( g' '
N
'f _ , '.' Tj\ \,
Y
'
- e', q 4 i
'
The FSV NPD PM coordiftator, a o g with the discipline schedu'.hs, prepare the yearly PM:pogrameschedt.le PREMIS)fromtheSSRworkpac4Ylen,an coordinates tM's infornatior. with maintenance supervit. hrs and the statio }'4 .
man'age The f6C inspector < reviewed the latest PREMIS with the NPD PM
'
,~ .' ' .p coordinatqn.?TiePEEMIPs
'
plants other thm. FSV. J . ystem use is widespread - by. (PSO, being<ustd ,,
,\
,
,
- .
, 4 + .> y M The .NRC-jtispectors dete irted,that the FSV, EQ, PM, and CM p drams are i', ' currently being implemer:dd satisfactorily. * Tnis. open item $ -Jnow closed,.. yN ,
t1 - 'd- 1 EQ Procurement System; Open Item 50-267/8704-01 (Closed) ,
b '\
The NRC inspectors ~ reviewed the implementation of the 5SV EQ procuremen syr,temandmaterialsmanagementbysampling;sixprocurementpackneyas
- fcilot s: 1 y) . 1, c
U
- 4 M # ate of- I ltem A,h '
f* 4
,
' 1 Purchase Number cCode ,
Item
,.<
> # . . / #
Jars 15,1987 N-7632 11749346
60' Raychem Nuclear-
? CabM S . I' !- , t 3') MCW-N f , heves , [
./ 3 y
. 0c'g. 11, 198,2 N-4382 ,17331987 700 f Anaconda Cable,
>
EPR Insulated,
!,1 ]c' j CSPE,v 11ypalc 4{th acket f- ,
May 25, 1984 N-5481 1733172 20,000 ft. Anaconda Cable, Unshielded, EP, FREP May 31.-1984 N7 550 . M00; f t . . Okonite Cable, 1733192 $0i} {t..- EPR Insulation
,
with Okonolon
- !t < Jacket '
l'
i Sb .Nov. 29, 1987' r N-5727 1733230 2500 ft. Rockbestos
, 1733232 5000 ft. Firew11 EP t Cabl5,EPR h#
If g; '
,,
irisu'<ati< p ,
witt/ Necorone/
( ,
, lj Hypal9nhcket
,
1, 1 Aug. 28~, 198 N-7'243 1733172 10,000 ft.' Rockbestss" Firevall;III
[ ">p (Ce:46)b, fable, Xt.FE
'
ulation, and PVC/
y Neoprene Jacket g , ja
, I
.. y
.
i (. .j . ......n .. . _ - . . . -, . . .. . -
.<
__ __
__-_ - - _ - -_-___-___-_ - ___- --____--__--____ __ - _ _ - _ - - _ _ _ _ _ _ _
t
'
.I'
( 7,
The'FSV activities involved are controlled by the following procedures:
S ' Procedure N Issue Date , . Title
<
Q-4'- :9- 10/24/86 Procurement System Rf, , ;MRIMi l
'
8 03/11/87 Control'of Procured Materials, A
'
,s
' '
< Equipment, Services
,
Q-10.-
'
,
- P-5 - 9 01/24/86 : baterial Contro ENG-16- 3- 01/05/87 NED Procurement Document Evaluation
- ED-76 1 01/12/87-- EQ Procurement Document Review
,
-Q-7 9 10/24/86 General Receiving Inspection-STD-1 *~ *' Cleanness, Packaging, Shipping,
,
Receiving, Storage, and Handling MPRM-10 5 01/05/87 Requirements for . Safety-Related -
MR/PR's and SRR's (Material Requests / Purchase Requisitions e and Special~ Recurring Requisitions)
- Issue.and date not documented by the NRC inspector ,
The EQ procurement system and material management program at FSV consists of: (1) identification; (2) procurement;:(3)~receivin of procured materials, and receiving inspection);storage; (4) g (includes and control (5)-issuanc ?The.NRC. inspectors determined that the NED engineering evaluation of
,
"
procurement documents issued for purchase were effectively being implemented as evidenced by the NRC inspectors review of the above six
^ procurement packages in accordance with the ENG-16, Q-4, ED-76, MPRM-10, and-Q-7 procedures. The NRC' inspectors reviewed the contents of each procurement package against procedure ENG-16 and the attachment
- requirement forms (A, B, C, D, and E) which included: '(1) baseline
- checklist requirements for_ procurement (acceptance criteria,-inspection requirements, performance characteristics, source inspection requirements, storage tracea>ility requirements, seismic requirements, and testing
' requirements.); (2). standard,'non-standard, and special purchase order (P0) clauses (substitutions, markings,sellerrecords, reporting defects /nonconformances, installation / maintenance instructions, witness and hold ' points, certificates of conformance (CC), certified material test L
_--- - - _ _ _ _ - - - - - - - _ - - - _ _
,
'
,
'
q -.g i
!" 9' j l
L reports (CMTR), certified test reports ,(CTR), electrical property reports (EPR),.EQ test procedures, and EQ test reports); (3) QA/QC source inspection requirements;'(4) QC receiving inspection requirements; and-(5) dedication of commercial grade item requirements-(considerations given to EQ items to. verify particular characteristics).
Additionally, thej NRC inspectors verified the effective implementation of the.FSV receipt inspection station and'the~ control of EQ procured materials during receiving inspection in accordance.with procedures MPRM-1, Q7, Q10, and Std. The NRC inspectors conducted interviews with the FSV Receipt Inspection Station Superintendent and (
personnel as to their methods, ~ inspection techniques, dispositioning of EQ items, dispositioning of nonconforming materials, inspection record keeping (acceptance reject, and hold tagging), and issuance to the stores warehouse. The NRC inspectors determined that the FSV receipt inspection activity was effectively being implemented in accordance with the FSV procedure The NRC inspectors will verify the effective implementation of the FSV stores warehouse techniques and methods during a subsequent NRC inspection when the FSV overall storage program will be reviewe The NRC inspectors determined that the FSV EQ procurement system has been
-
implemented satisfactorily. This open item is now close . Qualification of Rockbestos Coaxial Cable; EQ-FSV-79; Violation 50-267/8704-03 (Closed)
During the NRC inspection of January 26-30, 1987, a review of binder EQ-FSV-79 (Rockbestos coaxial cable) determined that-Rockbestos first generation coaxial cable was installed in the FSV plant. Rockbestos first generation coaxial cable is constructed using LD (low density) polymer as the first insulation, cross-linked polyethylene (XLPE) as the second insulation, and a XLPE jacket. Rockbestos first generation cable has displayed shorting characteristics due to thermal expansion probleins above identified temperature thresholds during laboratory type testing and was the subject of 10 CFR Part 21 reporting several years ago by other licensees. PSC could not explain the documented conclusion that first generation cable was qualified for the FSV plant environment based on a Rockbestos qualification report QR-6802 and a Rockbestos coaxial cable similarity lette During this followup inspection, the NRC inspectors reviewed EQ binder EQ-FSV-79 and a new PSC change notice (CN) No. 2598, dated March 9, 1987, relating to
'
the qualification of Rockbestos coaxial first generation cabl The EQ-FSV-79 binder (perCN2598)nowincludesS& Calculation No. CQD-033322, February 18, 1987, for the purpose of environmentally qualifying Rockbestos first generation coaxial cable for use in the FSV plant in accordance with D0R guidelines. Calculation CQD-033322 references the following additional qualification documentation contained in EQ-FSV-79, reviewed by the NRC inspectors, to first generation coaxial cable qualification:
"
-
..
l
, .
,
.,
t
o a. WyleTestReportNo.57102, February 6,1980(qualificationforpeak DBA/ post-DBA 30-day temperatures). PSC Test Specification 93-1-720, Issue January 17, 1980 (test plan for Wyle Report 57102 above). General Atomic Compar.y Test Report No. E-254-960, May 1,1981 (qualification for post-DBA temperatures beyond 30 days). Rockbestos letter to PSC, July 18,1981 (temperature thresholds), NSLD Calculation No. 3C21-0786-001, . Revision 3, February 23, 1987, (thermallaganalysis).
Rockbestos Report QR-6802, March 12, 1986, for coaxial, twinaxial, and triaxial generic cable (qualification tests for adverse service conditions) remains in place together with the Rockbestos letter to S&L, August 4,1986,(subject: Rockbestos report QR-6802), regarding a qualified (greaterthan)35-yearservicelif In the above PSC has provided (1) a letter from Rockbestos which defines temperature thresholds relating to the thermal expansion problems; and (2) documentation that demonstrates by analysis that cable temperatures remain below the damage threshol The NRC inspectors determined that the documentation contained in EQ-FSV-79 binder and CN 2598 including that described above, adequately establish the environmental qualification of the Rockbestos first generation coaxial cables at FS Failure of inadequate documentation to demonstrate qualification of Rockbestos first generation type tes; cables in the EQF during the January 26-30, 1987 EQ inspection was a violation of 10 CFR 50.49 (05-267/8704-03). This violation is now close . Qualification of Raychem N-PKV Stub Type and WCSF-N In-Line Type Cable Splices; EQ-FSV-15, Violation 50-267/8704-06 (Closed) Raychem N-PKV Stub Type Splices
'
During the inspection, the NRC inspectors reviewed EQ binder EQ-FSV-15 and associated CN 2523, February 23, 1987, relating to the above Raychem stub type N-PKV cable splice qualification. The EQ-FSV-15 binder (per CN 2523) now includes approved qualification documentation, specifically Wyle qualification plan No. 17873-02 dated Januery 19, 1987, and Wyle EQ test report No. 17883-1, dated January 22 1987, as a result of a new qualification test performed on the most limiting existing installed splice configurations at FS _ _ _ _ _ _ . _ _
..
.
.
.
The new qualification type test was performed on the above Raychem N-PKV-2-16 type stuo connecting splice. The type test specimen wires used were a 26 AWG teflon insulated wire and a 16 AWG Rockbestos SIS wire crimped together in one ring-tongue terminal lu The type test configuration used a Raychem WCSF-050 heat shrinkable tubing shim on the 26 AWG wire extending outside of the overall end cap (sealingsleeve). This configuration has complete sealing between end cap, shim, breakout, and wires.
l Raychem WCSF-N In-Line Type Splices l
- PSC has in place CN 2630, April 8,1987, which requires a similarity
'
analysis using the Wyle EQ test plan No. 17873-02 and test report No.17883-1 (referred to in paragraph 7.a above) being incorporated into EQ binder EQ-FSV-15 with regard to the Raychem WCSF-N in-line l splice qualification. During the NRC inspection of January 26-30, 1987, the NRC inspector observed WCSF-N in-line splices in low voltage junction box Nos. K555 and K556, with extended shims on the cable beyond the overall sealing sleeves. As a result of the new qualification test performed on the most limiting existing installed splice configurations at FSV for the Raychem N-PKV stub type (see paragraph 7.a above), PSC has established qualification for the WCSF-N most limiting installed in-line splice configurations at FSV, l by a similarity analysis. Again, this configuration uses a l Raychem WCFS-050 heat shrinkable tubing shim on the wire extending
'
outside of the overall sealing sleeve and has complete sealing between cable jacket, shim, and sealing sleev Since June 1986, PSC has performed several walkdown inspections with regard to IE Information Notice No. 86-53, in which PoC took immediate corrective action to replace improperly installed Raychem type WCSF and N-PKV electrical cable splices. PSC procedures have been issued since October 1985 to maintain tight control of nuclear adhesive heat shrinkable tubing (shim)applicationsasfollows:
.
'
i Pyotedure N Issue Date Title MPE-190 thru 5 10/19/85 Installation of Raychem 11/08/85 Material on New Splices
,
11/20/85 (Control / Instrumentation
09/17/86 Cables)
10/14/86 MPE-1901.2-EQ 1 02/05/87 Installation of Raychem Material on New Splices (Control / Instrumentation Cables)
The above procedures were reviewed by the NRC inspectors and were determined to adequately control these splice installations at FS _ _ _ _
, _ _ - - - - . - - _ __ _ _ - _ _ _ _ - - __ - -_-- _
I -g ,
'
, -;.
^
-
. f, ..
' *
The above 'corre'ctive action by PSC' also completes the action described in 'a PSC " Speed' Letter" ~ at' the time of the January '26-30,1987, inspection, of which 'an NRC. recommendation was agread.to by the' licensee, in regard to a plant design request (PDR) 87-1067, dated January 28,'1987, to-procedure MPE-1901.2-EQ to assure. no bend radii' occur. in Raychem splice
. installations'which have overall sealing sleeves extending less than'
2 ii.ches' beyond the inner shimL(e.g., particularly applicable to the new
. qualification test configurations of paragraphs 7.a and 7.b above). These instructions have always been included in MPE-1901.2, Issue 5, dated'
October. 14~, 1986. PDR 87-1067 has incorporated the same instructions into pracedure MPE-1901.2-EQ, Issue 1, dated February 5,1987,i reviewed by the NRC inspector In addition, corrective action has been completed as described in a PSC
" Speed Letter"'of which an NRC recommendation was agreed to by the licensee, in regard to qualified life calculations of Raychem' cable splices using a less than 2-inch overlap at the outer sleeve. The thermal aging analysisof.EQbinderEQ-FSV-15(S&LcalculationNo.CQD-028078, Revision 5)
is being changed by CN 2570, January 29,1987, to include aging parameters from Wyle Test-Report No. 17852-2 contained in the binder. Consideratio . of these added aging parameters will augment those calculations already in place, which are based on Raychem reports. This now results in an extended qualified life for the . splices under plant service conditions documented in binder EQ-FSV-1 FAilureL to .have adequate documentation to demonstrate qualification of the
' WCSF-N and N-PKV splices in the EQF during the January 26-30,1987,EQ inspection-(paragraphs 7.a and 7.b above) is.a violation of 10 CFR 50.49 (05-267/8704-06). This violation is now close . Normal Service Aging Qualification of Okonite Nos. 35 (Jacketing) and T95 (insulating) Splicing Tapes; EQ-F5V-23 The Okonite T-95 Jnsulating tape and Okonite No. 35 jacketing tape are used in the' repairing of damaged power cable.at FSV. The Okonite T-95 is used as an insulation material, the Okonite No. 35 is used as a jacket over the insulating tape T-95. During the NRC. inspection of January 26-30,-1987, the NRC inspector observed that Wyle test report No. 17883-1, dated January 22, 1987, for the above splicing l tapes, took crcdit for a 22-year normal service life temperature aging qualification. Calculations in the report however computed to 15 year Corrective action has been completed as described in a PSC " Speed Letter,"
of which an NRC recommendation was agreed to by the licensee, in regard to documenting the extended service life qualificatio A new service aging qualification analysis has been documented in EQ l binder EQ-FSV-23 to analyze the Okonite No.'s 35 and T95 splicing tapes for a normal service-time / temperature' aging extending the qualified life to l
j
_ - _ - - - _ - - - - _ -- - - - _- -- - - - - _
.
'
1: .
. ,
<
/
l y;c '.,
f 13 ,
L l22 years ^at 120*F. The calculations are_ contained in S&L Justification Analysis No. CQD-034801, dated March 16, 1987, reviewed by the.NRC inspectors.
y No violations, deviations,. or unresolved items were identifie .
9.-- Qualification of Sealed and Vented C'onduit/Jur.ction'80x Installation for A500 Solenoid Valves, Models NPK 8316, NPK 8320, KZ06-308, and KZO6-832,-
EQ-FSV-47, Open Item 50-267/8704-04 (Closed)
'
During the inspection,.the NRC inspectors reviewed EQ binder EQ-FSV-47 and associated CN,2523, dated February 23, 1987,_ relating to the above sealed and vented conduit / junction box installation, of which the licensee. agreed to clarify. the installed configurations in the- EQ binder. . CN 2523 provided additional information in' support of these installed configurations at FS ' Applicable ASCO bulletin No. 8320, catalog NP-1, and maintenance instruction sheets, have been included which identify specific vendor recommended installation requirements. PSC also _ included their_ analysis that FSV ASCO installations were in compliance with the vendor recommended
~ installation practices to assure moisture sealing requirements. An-additional: engineering analysis addressing moisture ingress has been added -
to the EQ-FSV-47 binder (S&L calculation). The analysis _ determined that the mechanism _for moisture intrusion is. negated when properly sealed and vente The NRC inspectors determined that the changes to EQ binder EQ-FSV-47 (per CN 2523) adequately clarify and establish qualification of the sealed and vented conduit / junction box installed configurations. This open item is close . Qualification of Conduit Entrance Configurations on Limitorque Valve Operators; EQ-FSV-16, Open Item 60-267/8704-07 (Closed)
During the inspection, the NRC inspectors reviewed EQ binder EQ-FSV-16 and associated CN 2523, dated February 23, 1987, relating to the above unsealed conduit entrance configurations with long vertical runs to Limitorque valve operators. The licensee agreed to clarify the qualification binder regarding water accumulation in motor operator switch compartments by flooding, fire suppression spray, and saturated steam. CN 2523 adds a discussion to provide justification to preclude the need to install conduit seals, as these^ absolute ' seals add no further considerations for qualification. The qualification testing results demonstrates proper performance of the motor operator's intended function even under complete submergence. The FSV specific installations _however, are much less severe and submergence is not a plant concern. The new justification in the EQ binder now provides more specific information related to valve operator sealing requirements (S&L Calculation No. CQD-027605). FSV actuators are not subjected to submergence, chemical spray, or fire suppression sprays.-
It also states that'these actuator motors were designed to survive DBA/ post DBA environment without absolute sealin _- _- __ _-____ - __ _ _ -
.- __ -_ _ -_ _
' *
.
s ,
f l
! !
Also, corrective action has been completed as described in two PSC " Speed !
Letters," of which NRC recommendations were agreed to by the licensee, in j regard to replacement of unidentified terminal blocks (TB's) in Limitorque 1 motor operators, in that EQ binder EQ-FSV-16 did not identify the TB )
manufacturers. As a result of a PSC walkdown inspection, PSC has replaced all unidentified TB's with Buchanan EQ qualified TB's per CN 2294A and revised the EQ-FSV-16 binder accordingly. In addition, qualified Raychem splice kits were used in lieu of Buchanan TB's in motor operators HV-4225 and HV-4257 due to the physical restraints which would not allow this model TB to fit within the operator. CN 2294C, February 23, 1987, has been completed to EQ binder EQ-FSV16, which documents a departure from the qualification basis and test report to which these motor operators were originally tested. The qualification of the Raychem splices has been evaluated and established in EQ binder EQ-FSV-15. Reference to the use of qualified Raychem splices in lieu of the TB's has been documented in the S&L calculation No. CQD-027695 in EQ-FSV-16 binde The NRC inspectors determined that the changes to EQ binder EQ-FSV-16 adequately clarifies the qualification status of Limitorque motor operators with regard to conduit entrance configurations, unidentified TB replacements, and incorporation of Raychem splice kits in lieu of TB' This open item is close . Upgrading of EQ Binders for Rockbestos, Okonite, and Anaconda Cable from 00R Guidelines to 10 CFR 50.49, Category I; EQ-FSV-50, EQ-FSV-54, i EQ-FSV-51, EQ-FSV-64, and EQ-FSV-77, Open Item 50-267/8704-05 (Closed)
During the inspection, the NRC inspectors reviewed the EQ binders for the above cable and associated CN's relating to the upgrading qualification status of these binders. The EQ binders had been upgraded from the NRR Division of Operating Reactors, " Guidelines for Evaluating Environmental Qualification of Class 1E Electrical Equipment in Operating Reactors, November 1979," requirements (00R guidelines) to the most current qualification requirements of the rule (10 CFR 50.49). In accordance with 10 CFR 50.49, equipment for FSV may be qualified to the criteria specified in either the D0R Guidelines or Interim Staff Position on Environmental Qualification of Safety-Related Electrical Equipment (NUREG-05SG), except for replacement equipment. Replacement equipment installed subsequent to February 22, 1983, must be qualified in accordance with the provisions of 10 CFR 50.49 using the guidance of Regulatory Guide (RG) 1.89, unless there are sound reasons to the contrary. RG 1.89 refers to the requirements of IEEE Std. 323-1974, "IEEE Standard for Qualifying Class IE Equipment for Nuclear Power Generating Stations, February 28, 1974," as acceptable to the NRC staff, subject to the regulatory positicns stated therein, EQ Binder FSV-50, Rockbestos Firewall EP Cables (EPR Insulation with Neoprene or Hypalon Jacket)
CN 2590 dated March 6,1987, upgrades this EQ binder in accordance with 10 CFR 50.49 based upon the original testing performed by the manufacturer. In each instance, the original testing was performed in
_ - _ _ _ _ _ - - _ - _ _ - _ _ - _ _ - - _ _ _ _
_
s 4- .,
!
j 15 accordance with the recommended guidelines of IEEE Std. 323-197 Testing for each cable was completed in accordance with the manufacturer's approved test procedures. The primary qualification documentation for the DBA in the S&L Calculation CQD-030749 was Wyle Report 17722-1, " Nuclear Qualification on Rockbestos Cables for Niagara Mohawk's 9 Mile Point Power Plants," December 19, 198 Franklin Institute Report No. F-C3798, March 1984, originally in place, is still used but only for cable flame test qualificatio EQ Binder FSV-54, Rockbestos Firewall III (CERRO) Cables (XLPE Insulation with PVC or Neoprene Jacket)
CN 2595 dated March 9, 1987, upgrades this EQ binder in accordance with 10 CFR 50.49 based on new qualification tests performed in accordance with the requirements of IEEE Std. 323-1974. The technical content of this binder has been revised to include this new basis in which these cables have been tested to satisfy the most current requirements of 10 CFR 50.49. S&L Calculation CQD-028382 now incorporates the latest qualification documentation (test reports) by Rockbestos(QR-5804, October 10,1985; QR-5805, October 8,1985; QR-5804, November 11, 1985; and QR 5805, November 11,1985). EQ Binder FSV-51, Okonite Power and Control Cables (EPR Insulation with Hypalon or Neoprene Jacket)
The justification / analysis section of EQ binder FSV-51 upgrades this binder in accordance with 10 CFR 50.49. S&L Calculation CQD-027087, Revision 6, February 3,1987, has been revised in accordance with 10 CFR 50.49 which bases the qualification on the original testing by the manufacturer. The primary qualification documentation includes Okonite Test Report No. NQRN-1A, Revision 3 February 16, 1984. The qualification for thermal aging is demonstrated by type testing and analysis. The DBE 30-day test plus 100-day post-DBE qualification is demonstrated by a combination of type testing and analysis. The test sequence demonstrated in report NQRN-1A is in accordance with IEEE Std. 383-1974 requirement EQ Binder FSV-64, Anaconda Unshield EP Thermocouple and Instrumentation Cable (Flame Retardant EPR Insulated with Chlorinated Polyethylene (CPE) Jacket)
The justification / analysis section of EQ binder FSV-64 upgrades this binder in accordance with 10 CFR 50.49. S&L Calculation CQD-032890, Revision 1 February 3,1987, has been revised in accordance with 10 CFR 50.49 which bases the qualification on the original testing by 4 the manufacturer. The primary qualification documentation is the Franklin Institute Research Laboratory Report F-C4350-4, dated i July 1976. An attachment to Report F-C4350-4, dated June 1978 and a Anaconda letter dated July 1978 are also included. This documentation demonstrates that thermal aging tests were performed before radiation l
l
- _
_ _ _ _ _ _ _
I l
, .
,
.,
-testing in accordance with IEEE Std. 323-1974. Accelerated thermal aging qualification are based on a regression line analysis, arrhenius methodology, and type testing, EQ Binder FSV-77, Anaconda EPR Insulated, Power and Instrument Cable (Hypalon Jacket)
The justification / analysis section of binder FSV-77 (S&L Calculation No. CQD-031209, February 3,1987) has been revised and upgraded in accordance with 10 CFR 50.49 which bases the qualification on the original testing by the manufacturer. The primary qualification documentation is the Franklin Institute Research Laboratory Report F-C4350-4, dated July 1976. An Attachment to Report F-C4350-4, dated June 1978, and a Anaconda letter dated July 1978 are also included. This documentation demonstrates the qualification of the cable's thermal life by type testing and the DBE qualification by type testing and analysis per IEEE Std 323-1974 requirement The NRC inspectors determined that the revisions to the above listed EQ l
binders (paragraphs 11.a.11.b,11.c,11.d. and 11.e), as described above, adequately establish qualification for the above Class 1E cable to the most
'
current requirements of the 10 CFR 50.49 rule. This open item is closed.
i 12. Qualification of Masoneilan Electropneumatic Transducers and Valve Positioners, Models 8005, 8006 and 8012; EQ-FSV-02 (
Corrective action has been completed as described in a PSC " Speed Letter,"
of which an NRC recommendation was agreed to by the licensee, in regard to the addition of functional descriptions in EQ binder EQ-FSV-02. The addition of a functional description is necessary to verify that these transducers and valve positioners will perform their intended safety function following a DB CN 2585, dated February 20, 1987, incorporates a revision to the S&L Calculation contained in binder EQ-FSV-02 which fully describes the loss of the pneumatic feedback signal for the bearing water supply valves HV-21185, HV-21186, HV-21187, and HV-21188. The calculation concludes that the loss of the feedback signal to the positioner will have no effect on the operation of the bearing water syste The NRC inspectors reviewed CN 2585 and the S&L calculation and determined that the additional functional descriptions were adequat No violations, deviations, or unresolved items were identifie . Qualification of Revere Thermocouple Cable (EPDM Insulation with Hypalon Jacket); EQ-FSV-86 Corrective action has been completed as described in a PSC " Speed Letter,"
of which an NRC recommendation was agreed to by the licensee, in regard to a thennal aging analysis for the above cable qualificatio _ _ ___ ._ _ .__ - _
. _ - - _ _ _ - _ _ = _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _. _ _ .
._-_ ,
.. .,
,
CN 2523, dated February 24, 1987, incorporates a revision to the S&L Calculation No. CQD-033782 contained in binder EQ-FSV-86, which now clarifies that the above cable has been thennally aged for 168 hours0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> at 121 C by sole means of a egression line method used in determining its qualified service lif The NRC inspectors reviewed S&L Calculation No. C d-033782 4 and the above CN and determined that the thermal aging analysis was adequat No' violations, deviations, or unresolved items were identifie . Instrument Loop Inaccuracy Evaluation for Instruments at FSV using
' Insulation Resistances (IR's) of Tested Cables; EQ-FSV-11, 53, 54, 60, 63, 64, 66, 72, 76, 77, 78, 79, 80, 81, 82, and 8 Corrective action has been completed as described in a PSC " Speed Letter,"
of which an NRC recommendation was agreed to by the licensee, in regard to instrument loop accuracy calculations at FSV. Instrument loop accuracies are affected as a result of a change in cable IR's. This is due to the various cable lengths installed at FSV, as compared to those cable lengths used during type testin S&L Calculation No. CQD-034680, Revision 2, dated March 4, 1987, now considers the IR measurements obtained during type testing as applied to the long cable runs of installed instruments at FSV. Table 1, on page 10, !
of this calculation was revised making comparisons of IR measurements between those taken during type testing and the extrapolated values for cable IR's at 1000-foot lengths. The results of these calculations for each cable type demonstrated no appreciable induced error which would 1 significantly affect the accuracy of the instrument j-The NRC inspectors reviewed S&L Calculat wn No. CLU-034680, Revision 2, and determined that these IR considerations were negligible with regard to the required instrument accurac No violations, deviations, or unresolved items were identifie . Qualification of Westinghouse Relays, 24 VDC; EQ-FSV-20 Corrective action has been completed as described in a PSC " Speed Letter,"
of which an NRC recommendation was agreed to by the licensee, in regard to the above EQ binder checklist NDMAP-4 which requires a 23-year replacemen This replacement schedule was not specified in the maintenance and !
surveillance sectio I CN 2585, dated February 16, 1987, incorporates a revision to EQ-FSV-20 l deleting the 23-year replacement requirement. The MDMAP-4 checklist was in error and did not agree with the analysis (Tab C) in the EQ binde l
'
EQ-FSV-20 qualifies these relays for 51.7 years. Consequently, no replacement is required in the maintenance and surveillance sectio l No violations, deviations, or unresolved items were identifie l i !
I
- _____-______A
p -
O .
'
l.
!
(*. '<
<
16. FSV Shelf Life Program, Procedure SMAP-28, November 5,1986 During +.he NRC inspection at FSV; the NRC inspectors remained cognizant of
- a PSC audit being performed by their QA department (QA Audit on Maintenance / Procurement No. 87-01). This audit addressed shelf life controls 'for stocked materials in establishing shelf life expiration dates, based on data provided by. vendors / manufacturers.. The audit resulted 'in
-
eight ' discrepant conditions. A management corrective action report (MCAR)
.was issued.by PSC on April 9, 1987. The discrepant conditions involved:
.
,
'
(1) occasions where stores' had issued materials since November 5, 1986,
. with expired shelf lifes; (2) material management department (MMD) failure to input shelf life data into.the shelf life data base; (3) failure to
. identify. shelf life expiration dates on items for which it had expired; (4)
failure to determine the disposition of the expired items; (5)-failure to
. generate and to' distribute shelf life data base scheduled reports; (6)
fai'.ure of. stores personnel to document shelf life expiration dates at the i time of material issue; (7) failure to provide classroom training for stores 1-persor,nel; and (8) failure of MED to evaluate the safety significance of installing material with expired shelf lif PSC has completed'all corrective actions to date.-
The NRC' inspectors remained appraised of the PSC audit progress and reviewed information through the PSC QA manager as the audit discrepancies were being evaluated.- The NRC inspectors were careful to identify that the shelf life discrepancies did not impact the shelf life EQ items as listed on the.10 CFR 50.49 master equipment list (MEL).
No violations, deviations, or unresolved items were identifie . Exit-Interview An exit meeting was held on April 24, 1987, at which time results of the NRC. inspection were discussed with FSV staff member a
l l
I