Requests Addl Info to Continue Review of Util 871215 Submittal Re Fire Protection Plan within 45 Days of Ltr Date
ML20153F495
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 04/29/1988
From: Heitner K
Office of Nuclear Reactor Regulation
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
References
TAC-66508, NUDOCS 8805100349
Download: ML20153F495 (6)


Text

April 29,1988 Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

FIRE PROTECTION PLAN APPROVAL (TAC N0. 66508)

We are continuing our review of your submittal dated December 15,1987(P-87422) concerning the Fort St. Vrain (FSV) Fire Protecticn Plan (FPP). In order to continue this review, we are requesting certain additional information, as  ;

described in the enclosure to this letter. Some of the information requested 1 results from the staff's on-site audit of the FSV-FPP on April 4-6, 1988. I Please provide the information requested within 45 days of the date of this letter. The infomation requested in this letter affects fewer than 10 respondents, therefore, OMB clearance is not required under P.L.96-511. )

Sincerely,

/s/

Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION

Docket File ' NRC PDR Local PDR PD4 Reading L. Rubenstein J. Calvo P. Noonan K. Heitner OGC-Rockville E. Jordan J. Partlow C. McCracken ACRS(10) PD4 Plant File l

PD4/LA PD4/PM )b PD4/D / E t PNoonan KHeitner:sr JCalvo 4 cCracken 04/t6/88 04/t(,/88 04/g)/88 04/2f/88 A805100349 880429

-DR ADOCK 05000267 F PDR

April 29,1988

?

o Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

FIRE PROTECTION PLAN APPROVAL (TAC NO. 66508)

We are continuing our review of your submittal dated December 15,1987(P-87422) concerning the Fort St. Vrain (FSV) Fire Protection Plan (FPP). In order to continue this review, we are requesting certain additional inform & tion, as described in the enclosure to this letter. Some of the information requested results from the staff's on-site audit of the FSV-FPP on April 4-6, 1988.

Please provide the infomation requested within 45 days of the date of this letter. The information requested in this letter affects fewer than 10 respondents, therefore, OMB clearance is not required under P.L.96-511.

Sincerely,

/s/

Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, 1 IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

1 As stated cc w/ enclosure:

See next pt.ge 1

1 l

OISTRIBUTION Docket File NRC PDR Local PDR PD4 Reading L. Rubenstein J. Calvo P. Noonan K. Heitner 0GC-Rockville E. Jordan J. Partlow C. McCracken ACRS(10) PD4 Plant File PD4/LA 9 PD4/PM H PD4/D [ t PNoonan KHeitner:sr JCalvo 4I cCracken 04/t6/88 04/t6/88 04/Af/88 04//)/88

@ Kf00 d' UNITED STATES

~ #e 8' 1 NUCLEAR REGULATORY COMMISSION

{ ,N WASHINGTON, D. C. 20555 April 29,1988

$,g.....,/

Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

FIRE PROTECTION PLAN APPROVAL (TAC NO. 66508)

We are continuing our review of your submittal dated D'.cember 15,1987(P-87422) concerning the Fort St. Vrain (FSV) Fire Protection P,an (FPP). In order to continue this review, we are requesting certain additional information, as described in the enclosure to this letter. Some of the infomation requested results from the staff's on-site audit of the FSV-FPP on April 4-6, 1988.

Please provide the infomation requested within 45 days of the date of this letter. The information requested in this letter affects fewer than 10 respondents, therefore, OMB clearance is not required under P.L.96-511.

Sincerely, Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page

9 .

Mr. R. O. Williams, Jr.

Public Service Company of Colorado Fort St. Vrain cc:

Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201-0840 Mr. David Alberstein, 14/159A Mr. R. O. Williams, Jr., Acting Manager GA Technologies, Inc. Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. P. F. Tomlinson, Manager Public Service Conpany of Colorado Quality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver, Colorado 80201-0840 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Comission Mr. R. F. Walker P. O. Box 640 Public Service Company of Jolorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 Kelley, Stansfield & 0'Donnell Public Service Company Building Comitment Control Program Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-D Denver, Colorado 80211 Regional Administrator, Region IV  !

U.S. Nuclear Regulatory Comission l

611 Ryan Plaza Drive, Suite 1000  !

Arlington, Texas 76011 Chairman, Board of County Comissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Reprssentative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413 1

I I

I

REQUEST FOR ADDITIONAL INFORMATION-FORT St. VRAIN NUCLEAR STATION FIRE PROTECTION PROGRAM PLAN REVIEW

l. During the 1983 Appendix R audit, a concern was raised concerning the routing of the power feed for the electric fire pump through the area containing the diesel fire pump.

During the site visit of April 4-6, 1988 it was demonstrated that a redundant feed from the ACM had been added, however, 1 it appeared that the electrical control circuit for the l electric fire pump still ran through the diesel room. t Please provide conduit routing diagrams and a description l which demonstrates the separation of all necessary power and control cables for the electric pump from the room i containing the diesel fire pump. l

2. Provide drawings and any other necessary documentation which demonstrates that detectors throughout the plant are located j in compliance with NFPA 72A and 72E. This information  ;

should also address the adequate spacing of detectors when ionization and beam detectors are used in the same area.

3. Provide justification for the use of non-IEEE 383 cables in i the plant. This response should address items such as the location of this cable, combustible loadings in these areas, and why this cable does not impact plant safety.
4. Submit drawings which illustrate the installed configurations of fire dampers inside barriers. Also provide a description of the several types of dampers used in the plant and information which demonstrates that these dampers are rated equivalent to the barrier.
5. During the April 4-6, 1988 site visit, the Appendix A comparison portion of the program plan was discussed with  ;

licensee representatives. The concern raised by the NRC was that a number of sections within this comparison use l words such as "the intent of this guideline has been met", J however, no explanation is presented of why the guideline is not strictly met. For sections where full compliance does not exist, provide within the comparison, an explanation of the deviation and adequate justification for the deviation.

Where juctification is contained in lengthy analyses, reference to these documents would be satisfactory.

6. It could not be determined during the April 4-6, 1988 visit whether or not the recently installed emergency lighting 1

? .

s' -

system provides adequate illumination for safe shutdown manual operator actions and for access and egress to areas where these manual actions take place. It is understood that this lighting system will be evaluated by the licensee during an upcoming drill. Although no action is necessary at this time, the issue of the adequacy of the emergency lighting system will remain an open item pending the performance of this evaluation.

l 2