Letter Sequence Meeting |
|---|
|
Results
Other: ML20096C267, ML20154M436, ML20154N901, ML20206A268, ML20236C636, ML20236Q429, ML20237C032, ML20245E654, ML20245E660, ML20247F625, ML20247G557
|
MONTHYEARML20096C2671984-08-17017 August 1984 Forwards Revised Schedule for App R Review,Submittals,Plant Mods & Fire Protection Safe Reactor Shutdown/Cooldown Capability Incorporating NRC Concerns & Comments Project stage: Other ML20236C6271987-10-15015 October 1987 Application for Amend to License DPR-34,deleting Fire Protection Limiting Conditions for Operation & Surveillance Requirements from Tech Specs Project stage: Request ML20236C6361987-10-15015 October 1987 Proposed Tech Specs,Deleting Fire Protection Limiting Conditions for Operation & Surveillance Requirements Project stage: Other ML20236C6161987-10-15015 October 1987 Forwards Application for Amend to License DPR-34,deleting Fire Protection Limiting Conditions of Operations & Surveillance Requirements from Tech Specs.Fee Paid Project stage: Request ML20236Q4291987-11-12012 November 1987 Advises That Util 871015 Request to Delete Fire Protection Tech Specs Premature.Util Must Have Approved Fire Protection Program & Request Amend to License Containing License Condition Per Encl 3 to Generic Ltr 86-10 Project stage: Other ML20237C0321987-12-15015 December 1987 Forwards Fort St Vrain Nuclear Generating Station Fire Protection Plan, for Approval,Per Generic Ltr 86-10. Review of Util & NRC Correspondence Re Fire Protection Provided Project stage: Other ML20153F4951988-04-29029 April 1988 Requests Addl Info to Continue Review of Util 871215 Submittal Re Fire Protection Plan within 45 Days of Ltr Date Project stage: Approval ML20195H9451988-06-13013 June 1988 Forwards Response to NRC 880429 Request for Addl Info Re Facility Fire Protection Program Plan.W/Three Oversize Drawings Project stage: Request ML20151V7281988-08-18018 August 1988 Notification of 880831 Meeting W/Util in Rockville MD to Discuss Fire Protection at Facility Project stage: Meeting ML20154E4031988-09-0909 September 1988 Summary of 880831 Meeting W/Util Re Fire Protection Issues at Plant.Meeting Attendees Encl Project stage: Meeting ML20154M4361988-09-0909 September 1988 Rev a to EE-FP-0005, Evaluation of Cable Trays Outside of Congested Cable Area Project stage: Other ML20154M3991988-09-20020 September 1988 Documents & Summarizes Actions & Commitments Resulting from 880831 Meeting Re NRC Review of Fire Protection Plan. Verification Testing Results of Emergency Lighting Addressed in Followup Ltr.W/Three Oversize Proprietary Drawings Project stage: Meeting ML20154N9011988-09-22022 September 1988 Advises That Details to Specific Emergency Lighting Mods Will Be Provided by 881121 Due to Util Test Results Indicating Inadequate Lighting,Per 10CFR50,App R,Section Iii.J Project stage: Other ML20206A2681988-10-28028 October 1988 Advises That Listed Emergency Lighting Mods Will Be Installed & Functional by Startup at End of Fourth Refueling Project stage: Other ML20245E6601989-01-0606 January 1989 Independent Review of Fire Protection Program Plan,Public Svc Co of Co,Fort St Vrain Nuclear Generating Station Project stage: Other ML20245E6541989-01-0606 January 1989 Forwards Technical Evaluation Rept SAIC-88/1822, Independent Review of Fire Protection Plan,Public Svc Co of Co,Fort St Vrain Nuclear Generating Plant Project stage: Other IR 05000267/19890041989-03-16016 March 1989 Insp Rept 50-267/89-04 on 880227-0303.No Violations or Deviations Noted.Major Areas Inspected:Licensed Operator Training Project stage: Request ML20246N4691989-03-16016 March 1989 Provides Comments on Draft Science Applications Intl Corp Technical Evaluation Rept SAIC-88/1822 Re Fire Protection Program Project stage: Draft Other ML20247F6251989-03-27027 March 1989 Forwards Issue 3 of Fire Protection Operability Requirements 13 & 15 Re Insp of Both Sides of Penetration & Functional Testing of Fusible Link Dampers,Respectively,Per Generic Ltr 86-10 Project stage: Other ML20247G5571989-05-18018 May 1989 Advises That 880722 Rev 1 to Fire Protection Program Plan Acceptable.Approved Plan Should Be Incorporated in Updated FSAR Per Generic Ltr 86-10 Project stage: Other 1988-08-18
[Table View] |
Text
- - - - - -.
h Public Service ~
~Ava.
c s.u rc h.
R.O. WILLIAMS, JR.
LE R DONS 2420 W. 26th Avenue, Suite 1000, Denver, Colorado 80211 September 20, 1988 Fort St. Vrain Unit No. 1 P-88327 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Docket No. 50-267
SUBJECT:
NRC Review of FSV's Fire Protection Program Plan
REFERENCE:
1)
PSC letter dated April 1, 1985, Lee to Johnson (P-85113) 2)
PSC letter dated June 13, 1988, Willians to Docu-ment Control Desk (P-88200)
Gentlemen:
This letter documents and summarines PSC's actions and comitments resulting from the August 31, 1988 meeting between the NRC and PSC representatives on the ope'1 items associated with the NRC review of the FSV Fire Protection Program Plan (FPPP).
The three topics discussed were:
(1) fire detection coverage (2) concentrated cable locations outside the defined congested cable areas, and (3) emergency lighting verification.
(pdt*f
,00092 _00204 000,920
+
gs a
P-88327 Page 2 September 20, 1988 Regarding fire detection coverage, PSC provided drawings which detail the present fire detection coverage at FSV and acknowledged that additional fire detectors will be installed to ensure coverage as previously comitted in Reference 1.
Furtheruore, PSC committed to install additional fire detectors in areas not previously committed i
to, including areas such as the Fire Water Pump rooms and welding shop.
It is anticipated that these modifications will be completed by start up after the 4th refueling outage.
PSC will keep the NRC informed of any changes in the present schedule.
The analysis results of the concentrated cable locations outside the congested cable areas, using the methodology defined in Reference 2,
were exhibited at the meeting. The analysis identified no locations where cable concentrations exceed the agreed upon limit of 350% of 40% filled cable trays within a 20 foot radius. Attachment 1 provides a copy of Engineering Evaluation EE-FP-0005 which documents these conclusions.
i i
Verification testing results of the emergency lighting will be i
addressed in a follow-up letter (P-88343).
If you have any questions or coments, please contact Mr. M. H.
Holmes at (303) 480-6960.
Very truly yours, h
/W R. O. Williams, Jr.
Vice President Nuclear Operations R0W:LAV/pjb 3
i i
Attachment i
cc:
Regional Administrator, Region IV Attention: Mr. T. F. Westerman, Chief 1
Projects Section B l
Mr. R. E. Farrell Senior Resident inspector Fort St. Vrain
-l
Attachtent 1
- - - - -, - - - - - - - - - -