_ ., { i~
'
'4
.
. . .
.
1
.,:
Esiit g
'
09 00T 1987-
- M %d E
Docket No.
50-352
Philadelphia ~ Electric Company
ATTN: Mr. J. W. Gallagher
.
Vice President
.. Nuclear-Operations
2301 Market Street'
Philadelphia, Pennsylvania'_19101
Gentlemen:
Subject:
Inspection No. 50-352/87-19,
This refers to the operational readiness team inspection conducted by
Mr..R. Gorchardt of this office on August 17 -' August 21, 1987,>at Limerick
Generating Station,-Uni.t 1, Limerick, Pennsylvania of activities authorized by
NRC license No..NPF-27 and to discussions of our findings held by
.
Mr. 'R. Borchardt with Mr. J. Franz and other members of.your staff during, and
at the conclusion, of.the inspection.
Areas examined during this inspection are described in the Region I Inspection
Report which is enclosed with this letter.
The purpose or this inspection was to assess readiness of the facility to
resume full power operation following the completion of the first refueling
outage by insuring that adequate measures have been employed to control main-
tenance, surveillance testing, and plant modification activities.
This was
accomplished by observing in process activities, reviewing administrative
programs and procedures, interviewing personnel, and touring the facility.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the " General Statement of
Policy and Procedure for NRC Enforcement Action," 10 CFR Part 2, Appendix C.
You are required to respond to this letter and in response, you should follow
,
the instructions in Appendix A.
Other inspection team findings have been
characterized as program strengths, or weaknesses, as appropriate, and are
documented in Section 1 of the attached report.
In your response to this
report, please include those actions you have taken or plan to take regarding
the weaknesses summarized in Section 1.2 of the report.
In general, we have concluded that management controls of outage and restart
preparation activities were' adequate to support resumption of full power
j
operation.
However, as discussed at the exit meeting, we considered a thorough
review of the Temporary Circuit Alterations (TCAs) and the remote shutdown
panel surveillance test necessary to be performed prior to plant startup. The
OFFICIAL RECORD COPY
IR LIM 1 87-19 - 0001.0.0
09/28/87
h
00
2
Cl
L
.___ ___ - _ _ _
-
_ _ _ .
.
49 00Tl987
Phil:delphia Electric Company
2
..
. purpose of' these reviews was' to reverify the appropriateness of installed
TCAs, and to ensure the remote shutdown panel testing is adequate. We note
that the' remote shutdown panel test was revised and successfully completed
after.the. conclusion of this' inspection. Also the resident inspectors were
' advised of the.TCA review results prior to the unit startup.
In accordance with 10 CFR 2.790(a),.a copy of this' letter.and the enclosures
.will be placed'in the Public Document Room. The responses directed by this-
!
letter'and the accompanying Notice are not. subject'to.the clearance procedures
of the Office of Management and Budget as required by the Paperwork Reduction
Act of 1980, PL 96-511.
'
Your cooperation is appreciated.
Sincerely,.
WSign~Q}
William F. Kane, Director
Division of Reactor Projects
!
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I-Inspection Report Number 50-352/87-19
cc w/encls:
John S. Kemper, Senior Vice President, Engineering and Production
=
G. Leitch, Nuclear Generation Manager
J. Franz, Manager Limerick Generating Station
Troy B. Conner, Jr. , Esquire
Eugene J. Bradley, Esquire, Assistant General Counsel
W. M. Alden, Engineer in Charge, Licensing Section
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
.E. Kelly, Senior Resident Inspector
-bec w/encls:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
J. Linville, DRP Section Chief, No. 2A
J. Wechselberger, Resident Inspector - Oyster Creek
J. Lyash, Resident Inspector - Pilgrim
S. Kucharski, Resident Inspector - Limerick I
l
L. Scholl, Reactor Engineer
l
R. Borchardt, Senior Resident Inspector - Hope Creek
R hP
Borcha[#
RI* D
R
p
RI:DRP
K te/mlb
L(ville
k
nger
..
O
19/T /87
f/{/87
87
I RI b /87
j p
0FFICIAL/ RECORD COPY
IR LIM 1 87-19 - 0002.0.0
09/28/87
)
)
_ _ _ _ _ _ _ _ _ _ _ _ _
_
1