ML20062G402

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-352/90-21 & 50-353/90-20 on 900827-31.No Violations Noted
ML20062G402
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 11/19/1990
From: Joyner J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20062G407 List:
References
NUDOCS 9011290180
Download: ML20062G402 (2)


See also: IR 05000352/1990021

Text

l . .

-

. .

.

. .

I

. .

-

! ,

1

10V19 d

i

,

Docket Nos 50-352

50-353

,

Philadelphia Electric Company

ATTN: Mr. D. Smith '

Senior Vice President -

Nuclear

Nuclear Group Headquarters

Correspondence Control Desk

P. O. Box 195

Wayne, PA 19087-0195

Gentlemen:

Subject: Combined Inspection Report Nos. 50-352/90-21 and 50-353/90-20

This refers to the announced, routine safety inspection of emergency

preparedness activities authorized by License Nos. NPF-39 and NPF-85 conducted

by Mr. C. Amato of this office and other members of an NRC team on August

27-31, 1990, at your Limerick Generating Station, Pottstown, Pennsylvania and

your Nuclear Group Headquarters, Chesterbrook, Pennsylvania. Discussions of

.

'

our findings were held by Mr. Amato with your staff at the conclusion of the

inspection.

The areas examined during this inspection are described in the NRC Region I

inspection report which is enclosed with this letter. Within these areas, the

inspection consisted of examination of procedures and records, and interviewt.

l with personnel by the inspectors.

Based on the results of this inspection, no violati.9ns were identified.

No reply to the letter is indicated. Your cooperation with us in this matter

is appreciated.

,

l Sincerely,

Original S!Ened By:

James H. Joyner

l James H. Joyner, Chief

! Facilities Radiological' Safety and

Safeguards Branch ,

Division of Radiation Safety and

Safeguards

Enclosure:

NRC Region I Combined Inspection Report Nos. 50-352/90-21 and 50-353/90-20

0FFICIAL RECORD COPY CIR LIM 90-21/20 - 0001.0.0

..

-11/13/90

! 180 901129

Mdl2yDCKOpjoon.-_.

a .

/Ok ,

t

PDC 1

_.

. .

~.. .

. .

'

. Philadelphia Electric Company 2

cc w/ encl:

R. Lees, Chairman, Nuclear Review Board . ,

G. Leitch, Vice President - Limerick Generating Station .

D. Helwig, Vice President of Nuclear Engineering and Services

'

J. Durham, Sr., Vice President and General Council '

M. McCormick, Jr., Manager - Limerick Generating Station

G. Hunger, Jr., Director - Licensing Section

J. Doering, Project Manager - Limerick Generating Station - '

'

J. O'Rourke, Manager - Limerick Quality Division

G. Madsen, Regulatory Engineer - Limerick Generating Station

Secretary, Nuclear Committee of the Board

'

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PA0 (2) All Inspection Reports

NRC R9tident Inspector

Commonwealth of Pennsylvania

FEMA-II

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)-

J. Joyner, DRSS

R. Blough, DRP

P. Kaufman, DRP

L. Doerflein, DRP

M. Miller, SLO

J. Caldwell, EDO

l R. Clark, NRR

l

t

r

l

l

l l

l $ RI:DRSS I:D SS  !

RI:Dy!T

Am sj l s oy

11//s-/90 11/ti/90 11//d /90 .

1

i 0FF'.CIAL RECORD COPY CIR LIM 90-21/20 - 0002.0.0 i'

l

11/13/90

d