Text
7 Michael P. Gallagher, P.E.
Plant Manager '
o Limerich Generating Station L
PECO NUCLEAR
= ;cm l
A' Unit of PECO Energy S nEo*g$,P19464-0920 610 718 2000 September 22,1999 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 Mr. H. J. Miller, Regional Administrator U.' S. Nuclear Regulatory Commission-Region 1 -
475 Allendale Road.
King of Prussia, PA 19406
Subject:
Limerick Generating Station, Units 1 and 2
' Suspensions of Licensed Operator Participation in Requalification Training
' This letter requests authorization for the following licensed operators to temporarily suspend their participation in the licensed operator requalification program at Limerick Generating Station, in accordance with Section ES-605 of NUREG-1021. " Operator Licensing Examination Standards for Power Reactors," Revision 8.
Npmp Docket No.
License No.
License Exoiration James A. Hutton, Jr.
55-60708 SOP-10459-2 December 24,1999 Ronald W. Monaco 55-60215 SOP-10928-1 August 30, 2002 This request is made due to the operators' reassignment to full-time, career-enhancing duties at other locations, which makes it impractical for them to participate in the Limerick Generating 3
Station licensed operator requalification program.
1 James A. Hutton, Jr. has been uppointed as Director of Licensing at Nuclear Group Headquarters j
at Chesterbrook. Ronald W. Monaco has been reassigned to the Amergen Ventures group. In
- accordance with ES-605, the duration of these reassignments will be limited to a period of 24 months, or other specific action regarding the status of the operators' licenses will be taken.
i Prior to retuming Mr. Hutton and Mr. Monaco to licensed duties, actions will be taken to ensure that each operator's qualifications and status are acceptable, i.e., the operators will be retrained, retested, reactivated, and determined to be medically fit for duty. The NRC will be provided with certification of the successful completion of these actions, and the operators will not be retumed to licensed duties until confirmation of the NRC's acceptance of this certification is received.
j 1
Thank you for your attention in this matter.
1 Very Truly Yours
&m ' D NRC Document Control Desk (signed original)
H.J. Miller, Administrator Region I, USNRC