May 7,1999
i
Mr. G. Rainey, President
'
PECO Nuclear
Nuclear Group Headquarters
Correspondence Control Desk
P. O. Box 195
Wayne, PA 19087-0195
SUBJECT:
NRC INSPECTION REPORT 50-352/99-02,50-353/99-02
Dear Mr. Rainey:
This refers to the inspection conducted on March 2,1999, through April 12,1999, at your
,
Limerick Units 1 and 2 reactor facilities. The enclosed report presents the results of this inspec-
tion.
l
During the 6-week inspection period covered by this report, the conduct of activities at Limerick
Units 1 and 2 was characterized by safe and conservative operations and decision making. In
particular, your operators continue to identify problems early, such as the de-energized
shutdown cooling isolation logic. However, the NRC observed that housekeeping and general
area material condition had degraded in the vicinity of fire barrier modification activities.
Based on the results of this inspection, the NRC has determined that three violations of NRC
requirements occurred. These violations are being treated as Non-Citad Violations (NCVs),
consistent with Appendix C of the Enforcement Policy. These NCVs involved a locked valve
surveillance, fire protection and safeguards information. These NCVs are described in the
subject inspection report. If you contest the violation or severity level of these NCVs , you
should provide a response within 30 days of the date of this inspection report, with the basis for
'
your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington DC 20565-0001, with copies to the Regional Administrator, Region I, and the
Director, Office of Enforcement, United States Nuclear Regulatcr/ Commission, Washington,
DC 20555-0001.
!
I}
9905170138 990507
j!
ADOCK 05000352
G
0
[h.0
'
.
Mr. G. R. Rainey
2
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure (s), and your response will be placed in the NRC Public Document Room (PDR).
Sincerely,
ORIGINAL SIGNED BY:
Curtis J. Cowgill, Chief
Project Branch 4
Division of Reactor Projects
Docket Nos.: 50-352, 50-353
Enclosures:
,
l
NRC Inspection Report 50-352/99-02, 50-353/99-02
l
l
cc w/ encl:
J. J. Hagan, Vice President, Nuclear Station Support
G. Edwards, Chairman, Nuclear Review Board and Director - Licer,aing
J. von Suskil, Vice President - Limerick Generating Station
M. P. Gallagher, Plant Manager, Limerick Generating Station
T. Moore, Manager, Experience Assessment
Secretary, Nuclear Committee of the Board
R. A. Calvan, Regional Director, FEMA, Region 111
Commonwealth of Pennsylvania
4
)
.
.
3
Distribution w/enci:
Region i Docket Room (with concurrences)
NRC Resident inspector
Nuclear Safety information Center (NSIC)
PUBLIC
H. Miller, RA/J. Wiggins, DRA
C. Cowgill, DRP
D. Florek, DRP
D. Cullison, DRP
C. O'Daniell, DRP
4
Distribution w/ encl: (Via E-Mail)
M. Tschiltz, OEDO
E. Adensam, PDI-2, NRR
R. Correia, NRR
DOCDESK
Inspection Program Branch, NRR (IPAS)
l
l
DOCUMENT NAME: G:\\ BRANCH 4\\ LIM \\LM9902R1.WPD
Ta receive a copy of thisgapument, Indicate in the box: "C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No copy
OFFICE
Rl/DR$&
l
Rl/DRP p At ,l
/
l
l
l
NAME
ABurritf
1/
CCowgill Uf
,
DATE
05/07/99
_
05//1/99
05/ /99
05/ /99
05/ /99
OFFICIAL RECORD COPY