Advises That Plant,Unit 2 Cycle 6 Safety Limit Mcpr, ,contained in PECO Energy Co 990311 Application & 990204 Affidavit Will Be Withheld from Public Disclosure,Per 10CFR2.790
ML20206E695
Person / Time
Site: Limerick Constellation icon.png
Issue date: 04/30/1999
From: Buckley B
NRC (Affiliation Not Assigned)
To: Watford G
GENERAL ELECTRIC CO.
References
TAC-MA4957, NUDOCS 9905050204
Download: ML20206E695 (5)


Text

c .

OS

.g ( UNITIED STATES j'p j

i NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20086 0001 b g, April 30,1999 Mr. Glen A. Watford Manager-Nuclear Fuel Engineering .

' General Electric Company .

P.O. Box 780, M/C A16

' Wilmington, NC 2840?.

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE, LIMERICK GENERATING STATION, UNIT 2 (TAC NO. MA4957)

Dear Mr. Watford:

In PECO Energy Company's March 11,1999, application and your affidavit dated February 4, 1999, the document, " Letter R. M. Butrovich (GENE) to K. W. Hunt (PECO Energy) ' Limerick Unit 2, Cyc o 6 Safety Limit MCPR,' dated February 4,1999," was submitted as Attachment 3 snd it was requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. A nonproprietary version was submitted for placement in the Nuc' ear Regulatory Commission's (NRC) public document room.

The affidavit stated that the submittori proprietary information should be considered exempt from mandatory public disclosure for the fcilowing reasons:

1. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies;
2. Information whict., if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product; g
3. The information identified in paragraph (2) is classified as propdetary because it contains details of GE's Safety Limit MCPR analysis and the corresponding ,0\

results which GE hss applied to this specific plant and cycle's actual core design \

with GE's fuel. ~

The development of the methods used in these analys[e)s, along with the testing, development and approval of the supporting critical power correlation was acnieved at a significant cost, on the order of several million dollars, to GE.

. We have reviewed your application and the material .a acccidance with the requirements of 10 CFR 2. 790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

9905050204 990430 "

PDR ADOCK 05000353 P PDR ., f g50036

\

\

g April m, im

~

G. Watford 1 I

Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withh:,lding from public inspection sheli not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants hav's signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom oi information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at (301) 415-1483.

Sincerely, LL O.'P AL Bartholomew C. Buckley, Senior Pr ject Manager, Section 2 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-353 g

cc: See next page DISTRIBUTION

' Docket File r N.PSiemien, OGC PUBLIC CCowgill, RGN-l PDI-2 Readin.; JWermiel JZwolinski/SBlack JClifford BBuckley MO'Brien _ ., 4, , , ,,

OFFICE PDIfP I2/L SRXB/BC OGC PD C NAME BBuckley:rb lI/dNn) JW el MPSibien JCliff DATE 1/ /37/99 h03/99 4 /17/99 /Y/93 Y /.M98 0FFICIAL RECORD COPY DOCUMENT NAME: PRO 4957.WPD I

f April 30,1999 L

G. Watford Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants hav'e signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in s ~vance of any public disclosure.

If you have any questic is regarding this ' .er, I may be reached at (301) 415-1483.

Sincerely, b5 \ ud %C Badholomew C. Buckley, Senior P ject Manager, Section 2 ,

Project Diresorate I '

Division of Licensing Project Management Office of Nuclear Reactor Regulation i 4

Docket No. 50-353 cc: See next page DISTRIBUTION Docket File MPSiemien, OGC PUBLIC CCowgill, RGN l PDl-2 Reading JWermiel JZwolinski/SBlack JC'ifford BBuckley MO'Brien _ . , , , , , _ , , ,,

OFFICE PDl-@ l2/L SRXB/BC OGC PD j NAME BBuckley:rb Nn JW l MPSib.ien JCliff DATE f/ /37/99 //~/7 $/99 Y/17/99 M/99 Y /3098 OFFICIAL RECORD COPY DOCUMENT NAmE: PRO 4957.WPD

, i. 3 4 - <

' G. Watford Therefore, the v'srsiori of the submitted information marked as proprietary will be withheld from public disclost:,e pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

J If the basis for withholding this information from public inspection should change in the future , i such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act I request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure, {

j If you have any questions regarding this matter, I may be reached at (301) 415-1483.

Sincerely, W % C.5 k Bartholomew C. Buckley, Senior Project Manager, Section 2 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-353 cc: See next page i

9 .-

~

ft(

  • PECO Energy Company Limerick Generating Station, Units 1 & 2 cc:

J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. Of Environmental Resources PECO Energy Company P.O. Box 8469 2301 Market Street Harrisburg, PA 17105-8469 Philadelphia, PA 19101 Director-Site Engineering Manager-Limerick Licensing,62A-1 Limerick Generating Station PECO Energy Company P.O. Box A 965 Chesterbrook Boulevard Sanatoga, PA 19464 Wayne, PA 19087-5691 Manager-Experience Assessment Mr. James D. von Suskil, Vice President Limerick Generating Station Limerick Generating Station P.O. Box A Post Office Box A Sanatoga, PA 19464 Sanatoga, PA 19464 Library Plant Manager U.S. Nuclear Regulatory Commission Limerick Generating Station Region i P.O. Box A - 475 Allendale Road Sanatoga, PA 19464 King of Prussia, PA 19406 Regional Administrator, Region i Senior Manager-Operations U.S. Nuclear Regulatory Commission Limerick Generating Station 475 Allendale Road P.O. Box A King of Prussia, PA 19406 Sanatoga, PA 19464 Senior Resident inspector Dr. Judith Johnsrud U.S. Nuclear Regulatory Commission National Energy Committee Limerick Generating Station Sierra Club P.O. Box 596 433 Orlando Avenue Pottstown, PA 19464 State College, PA 16803 Director-Site Support Services Mr. Garrett D. Edwards Limerick Generating Station Director-Licensing, MC 62A-1 P.O. Box A PECO Energy Company Sanatoga, PA 19464 Nuclear Group Headquarters Correspondence Control Desk Chairman P. O. Box No.195 Board of Supervisors Wayne, PA 19087-0195 of Limerick Township 646 West Ridge Pike Linfield, PA 19468