ML20154A346
| ML20154A346 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 09/25/1998 |
| From: | Anderson C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rainey G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20154A350 | List: |
| References | |
| 50-352-98-07, 50-352-98-7, 50-353-98-07, 50-353-98-7, NUDOCS 9810020281 | |
| Download: ML20154A346 (3) | |
See also: IR 05000352/1998007
Text
-.
. . . . . - . -
-
- - - - . , _
_ . - - .
- -
.---- - --
~- -
..
- +
September 25, 1998
'
Mr. G. Rainey, President
PECO Nuclear
Nuclear Group Headquarters
i
Correspondence Control Desk
P. O. Box 195
Wayne, PA 19087-0195
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-352/98-07,50-353/98-07
Dear Mr. Rainey:
This refers to the inspection conducted on July 7,1998, through August 31,1998, at
your Limerick Units 1 and 2 reactor facilities. The enclosed report presents the results of
this inspection.
During the 8-week inspection period covered by this report, the conduct of activities at
Limerick Units 1 and 2 was generally characterized by safe and conservative operations
and decision making. Your operators responded very well to unexpected plant conditions
on three separate occasions. However, weaknesses were noted with reactor engineering
support to a rod pattern adjustment.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
'its enclosure (s), and your response will be placed in the NRC Public Document Room
. (PDR).
.
Sincerely,
j
Original Signed by:
)
f
Clifford J. Anderson, Chief
Project Branch 4
Division of. Reactor Projects
Docket Nos.: 50-352,50 353
,
'
Enclosure: NRC Inspection Report 50 352/98-07,50-353/98-07
.
9810020281 980925
ADOCK 05000352
G
,
0FFICIAL RECORD COPY
IE:01
.
-
.
_
. .
_
_. . _ _ .
. _ . _ . _ _ _ .
_ _ . _ - _ _ . _ . .
_ - .
.m_
_
_
.
.
G. Rainey
2
cc w/ encl:
J. J. Hagan, Vice President, Nuclear Stat;on Support
G. Edwards, Chairman, Nuclear Review Board and Director - Licensing
J. von Suskil, Vice President - Limerick Generating Station
M. P. Gallagher, Plant Manager, Limerick Generating Station
T. Moore, Manager, Experience Assessment
Secretary, Nuclear Committee of the Board
~ Commonwealth of Pennsylvania
,
b
4
4
+
'
-
. .
. . .
.
.
- . ~ .-
.- - _ _ -- - - .
-
-
..
.
.
.
,
.
4
-
G. Rainey
3
Distribution w/ encl:
Region i Docket Room (with concurrencer.)
)
H. Miller, RA/W. Axelson, DRA (1)
C. Anderson, DRP
D. ':lorek, DRP
R.Junod,DRP
NRC Resident inspector
Nuclear Safety Information Center (NSIC)
PUBLIC
{
l
!
. Distribution w/ encl: (Via E-Mail)
I
B. McCabe, OEDO
R. Capra, PDI-2, NRR
Inspection Program Branch, NRR (IPAS)
4
R. Correia, NRR
F. Talbot, NRR
M. Campion, ORA
DOCDESK
l
'
,
I
.i '
DOCUMENT NAME: G:\\ BRANCH 4\\ LIM \\ LIM 9807A.lNS
/
To receive a copy of this document, indicate in the box: "C" = Copy without
attachment /encips f "E" = Copy wPh attachment / enclosure
"N" = No copy
OFFICE
Rl/D@ff '
Rl/DRP
,
NAME
DFigffk
j
CAnderson (jd
DATE
09[$298
09/ggf/98
'
OFFICIAL RECORD CO')Y