ML20248D890
| ML20248D890 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 07/28/1989 |
| From: | Linville J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20248D894 | List: |
| References | |
| NUDOCS 8908110162 | |
| Download: ML20248D890 (2) | |
See also: IR 05000352/1989012
Text
.n
-
--
- - -
--
-- =
7
3
~
.,9
q
,
.
y
'
L
!
u
.
-
t'
,
lv
.
.
.
28 JUL 1989
\\
Docket Nos.-.50-352-
- 50-353
l
i
'
Philadelphia Electric Company-
' ATTN: Mr. C. A. McNeill
'
'
.
Executive Vice President-Nuclear
Correspondence Control Desk
P.O. Box 7520
' Philadelphia, Pennsylvania .19101
- Gentlemen:
1
-Subject:
Inspection No..50-352/89-12 and 50-353/89-19
' This letter transmits' the routine resident safety inspection report by Messrs.
T Kenny,'. L'.. Scholl, . R. Fuhrmeister: and Ms. M. Evans from May 29 - June 25,
~ 1989 at'the Limerick Generating Station, . Limerick, Pennsylvania, Messrs. A.
Krasopoulas- J.-Williams, D. Moy, R. Loesch, and J. Gadzala also participated
,
in this inspection. The inspection consisted of document reviews, interviews,
and observation'of activities. =The results have been discussed with
- Mr. Martin McCormick, Jr. of your staf f.
Based on our inspection, apparent violations involving inadequate surveil'1ance
'
testing and recurrent failures to follow procedures occurred during the
performance of several activities. These apparent violations-have been
categorized by severity. level according to 10 CFR Part 2, Appendix C
-
L(Enforcement Policy). You are required to respond to these violations and in
preparing ~your response.you should follow the instructions.in Appendix A.
Certain fire protection. issues discussed.in section 3.1 may represent. potential
enforcement issues. We will: contact you in the future, after we have completed
our review of these items.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures
will be placed in the Public Document Room. The response directed by this
letter and the accompanying notice are' not subject to the clearance procedures
of the Office'of Management and Budget as required by the Paperwork Reduction
Act of 1980, PL 96-511.
Your cooperation'is appreciated.
Sincerely,
kIfMEDgy
8900110162 890728 ?"I
James C. Linville, Chief
ADOCK 0500
O
Projects Branch No. 2
G
Division of Reactor Projects
0FFICIAL RECORD COPY
CIR LIM 89-12/19 - 0001.0.0
07/28/89
\\'
-
t
. _ _ _ -
.
,
o
-
Philadelphia Electric Company
2
28 JUL 1989
Enclosures:
1
1.
Appendix A, Notice of Violation
'
2.
NRC Region I Inspection Report 50-352/89-12 and 50-353/89-19
cc w/encis:
l
J. S. Kemper, Sr. , Senior Vice President - Nuclear Construction
G. M. Leitch, Vice President - Limerick Generating Station
S. J. Kowalski, Vice President - Nuclear Engineering
D. R. Helwig, General Manager - Nuclear Services
M. J. McCormick, Jr., Manager - Limerick Generating Station
l
W. T. Ullrich, Manager - Limerick Unit 2 Startup
{
A. S. MacAinsh, Manager - Limerick Quality Division
G. A. Hunger, Jr., Director - Licensing Section
r
'
T. B. Conner, Jr. , Esquire
E. J. Bradley, Esquire, Assistant General Counsel
H. D. Honan, Branch Head - Nuclear Engineering Licensing
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encis:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
L. Doerflein, Section Chief, DRP
J. Durr, Branch Chief, DRS
J. Dyer, EDO Office
R. Clark, NRR Project Manager
T. Johnson, SRI, Peach Bottom
T. Kenny, SRI, t.imerick
Project Engineer
E. Conner, Reactor Licensing / Risk Engineer
C. Anderson, DRS
Q-
/
RI:DRP
MI:
'
er lein/rb1
inville
7/28/89
7/f/89
0FFICIAL RECORD COPY
CIR LIM 89-12/19 - 0002.0.0
07/27/89
1