Confirms Dates of 901126-30 for NRC Equipment Qualification Insp of Facility
ML20062F177
Person / Time
Site: Limerick Constellation icon.png
Issue date: 11/13/1990
From: Hodges M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9011270130
Download: ML20062F177 (3)


Text

, :Dc%.

i ,

NOV131990 Docket Nos. 50-353 Philadelphia Electric Company ATTN: Mr. D. Smith Senior Vice President'-

Nuclear Nuclear Group Headquarters Correspondence Control Desk P. O. Box 195 Wayne, PA 19087-0195 Gentlemen:

Subject:

EQUIPMENi QUALIFICATION (EQ)-INSPECTION OF LIMERICK GENERATING STATION, UNIT 2 (INSPECTION NO. 50-353/90-26)

This letter confirms the dates of November 26-30, 1990 for the NRC equipment qualification (EQ) inspection-of Limerick- Generating Station, -These dates -

were established during.a previous telephone conversation-between your Mr. D. J. Thompson and Mr. Leonard Cheung-of this office on November 5; 1990.

The inspection will take place at your corporate office and at'the. plant site.

A management entrance meeting is scheduled for'9:00 a.m. on November 26, 1990 with a management exit meeting tentatively scheduled for 3:00 p.m. on November 30, 1990 at the corporate office. A plant'walkdown'_ inspection of specific EQ equipment is planned for Wednesday, November 28, 1990.

The inspection will include the following:

1. Review of your implementation of the 10 CFR 50:49 EQ program, including the preservation of qualified status of equipment;
2. Review of your, implementation :of Safety; Evaluation Report EQ corrective action commitments, if any,
3. -Review of EQ-documentation files.
4. Physical inspection of equipment from the EQ' Master List.

About two weeks prior to the inspection we will require one copy o_f each document ' identified in Attachment :1' with a plus (+) mark to be provided to the Regional Office (send to USNRC, 475 Allendale Road, King.of' Prussia, Pennsylvania 19406, c/o L. Cheung).

C b . 31. 0 '

0FFICIAL RECORD COPY LIM EQ - OCL .0.0 11/07/90 9011270130 901113 gDR ADOCK0500pg.53

_ h 16 '.O l :

NOV 131990 Philadelphia Electric Company 2 Your cooperation with us during this inspection will be appreciated. Should you have any questions regarding this inspection, please contact either .

Mr. Leonard Cheung (215) 337-5296 or Mr. C. Anderson at (215) 337-5376 of this office.

Sincerely, ,

.4A64. -

a Hodges, Director Division of Reactor Safet cc w/ encl:

R, Lees, Chairman, Nuclear Review Board G. Leitch, Vice President - Limerick Generating: Station D. Helwig, Vice President of Nuclear Engineering and Services J. Durham, Sr., Vice President and General-Council M. McCormick, Jr., Manager -' Limerick Generating Station G. Hunger, Jr., Director - Licensing Section J. Doering, Project Manager - Limerick Generating Station J. O'Rourke, Manager - Limerick Quality Division G. Madsen, Regulatory Engineer - Limerick Generating Station Secretary, Nuclear Committee of the Board Public Document Room (PDR)

Local Public Document Room (LPDR) .

Nuclear Safety Information Center (NSIC)

K. Abraham, PA0 (24) SALP Reports and (2) All Inspection Reports _-

NRC Resident Inspector Commonwealth of Pennsylvania i bec w/ encl: '

Region I Docket Room (with concurrences)

R. Bellamy, DRSS R. Blough, DRP P. Kaufman, DRP L. Doerflein, DRP M. Conner, DRP (SALP Reports Only)'  !

M. Mille , SLO J. Cald., ell, EDO  !

l R. Clark, NRR RI:DR LSC RI:[tY RI:DRS :D S:

Cheung Anderson Durr Ho es i 11/[/90 11/(f/90 11//J/90 1/ /90 0FFICIAL RECORD CDP LIM EQ.-_0002.0.0 11/06/90

-i

f. .-

o .

Attachment l' l

1 i l

EQ DOCUMENTS FOR REVIEW

1. + Licensee's overall EQ Program, j
2. + NRC Safety Evaluation Reports concerning environmental qualification of safety related electri al. equipment.
3. + EQ Master List, version'in. ef fect at' time of inspection.
4. + a. Generic letter 84-24, D._ G. Eisenhut to Licensee's and _ Applications,: -

dated December 27, 1984, '

Subject:

Certification tof Compliance to 10CFR 50.49. <

+ b. Licensee's response-to Generic Letter,84-24.

5.
  • Licensee's current System Component Evaluation;Worksheets-(SCEW sheets) or equivalent.
6. + SCEW sheets for-a sample of five_ components.

l 7. + Licensee's procedures applicable to equipment qualification (EQ) program,  ;

l procurement of qualified: equipment, maintenance lof qualified equipment;-

EQ documentation, modifications to EQ equipment, EQ personnel training.

(site and ' corporate personnel), -QA/EQ interface including corporate-QA','

Site QA/QC audits,~EQ spare-parts procu'rement.and licensee-program for- ,

EQ related NRC Information Notices / Bulletins. 1

8.
  • Licensee's qualification documentation'and/or EQ files, l
  • These documents must be available for the. inspectors use_throughout the ..

inspection.  !

+ These-documents are requested for review about two weeks before.the inspection. A duplicate set must be available for-the-inspectors' use' t L .throughout the inspection. j i

-OFFICIAL RECORD COPY LIM EQ - 0003.0.0 11/07/90.