Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint
ML20216F782
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/16/1999
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20216F785 List:
References
50-352-99-05, 50-353-99-05, NUDOCS 9909240107
Download: ML20216F782 (3)


See also: IR 05000352/1999005

Text

4

,

September 16,1999

Mr. G. Rainey, President

PECO Nuclear

Nuclear Group Headquarters

Correspondence Control Desk

P. O. Box 195

Wayne, PA 19087-0195

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-352/99-05,50-353/99-05

Dear Mr. Rainey:

On August 16,1999, the NRC completed an inspection at your Limerick Generating Station,

Units 1 and 2. Resident inspectors reviewed routine activities and regionalinspectors reviewed

aspects of your maintenance and emergency preparedness programs. The enclosed report

presents the results of this inspection.

We concluded that your staff continued to ooerate both units safely. Your operators responded

well to plant challenges caused by the extei.

t weather conditions.

Based on the results of this inspection, the NRC has determined that one violation of NRC

requirements occurred. The violation related to inoperability of the automatic depressurization

system during maintenance. This violation is being treated as a Non-Cited Violation (NCV),

l

consistent with Appendix C of the Enforcement Policy. The NCV are described in the subject

inspection report. If you contest the violation or severity level of the NCV, you should provide a

response within 30 days of the date of this inspection report, with the basis for your denial, to the

Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001,

with a copies to the Regional Administrator, Region I, and the Director, Office of Enforcement,

United States Nuclear Regulatory Commission, Washington, DC 20555-0001 and the NRC

resident at the Limerick Generating Station.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure (s), and your response will be placed in the NRC Public Document Room (PDR).

Sincerely,

9909240107 990916

U"

PDR

ADOCK 05000352

0

PDR

Curtis Cowgill, Chief

Project Branch 4

Division of Reactor Projects

,

\\)

Docket Nos.: 50-352,50-353

i

License Nos: NPF-39, NPF-85

'

Enclosures:

NRC Inspection Report 50-352/99-05,50-353/99-05

l}b . O I

'

i

.

,

1

l

'

.

i

<

i

l

. Mr. G. R. Rainey

2

'

cc w/ encl:

J. J. Hagan, Senior Vice President, Nuclear Operations

G. Edwards, Chairman, Nuclear Review Board and Director - Licensing

J. von Suskil, Vice President - Limerick Generating Station

M. P. Gallagher, Plant Manager, Limerick Generating Station

K. P. Bersticker, Manager, Experience Assessment

Secretary, Nuclear Committee of the Board

Commonwealth of Pennsylvania

l

l

l

l

!

l

l

)

L

_

.

.

Mr. G. R. Rainey

3

Distribution w/ encl:

Region I Docket Room (with concurrences)

NRC Resident inspector

Nuclear Safety Information Center (NSIC)

PUBLIC

H. Miller, RA/J. Wiggins, DRA

C. Cowgill, DRP

D. Florek, DRP

D. Cullison, DRP

C. O'Daniell, DRP

W. Lanning, DRS

B. Holian, DRS

Distribution w/ encl: (Via E-Mail)

M. Tschiltz, OEDO

E. Adensam, PDI-2, NRR

J. Clifford, NRR

B. Buckley, NRR

M. Thadani, NRR

R. Correia, NRR

DOCDESK

Inspection Program Branch, NRR (IPAS)

Tysceive a copy of thP,gG:\\ BRANCH 4\\ Limerick \\ Lim 99-05 Rev4.wpd

DOCUMENT NAME

_,m;./., Indicate in the box: "C" = Cozy without attachment / enclosure

  • E" = Copy with attachrnent/ enclosure

"N" = No copy

OFFICE Rl/DF])@

l

Rl/DRP

/

l

l

l

NAME

ABudW l'

CCowgi!!

I

DATE

09@l99

09/ /99

09/ /99

09/ /99

09/ /99

V

OFFICIAL RECORD COPY

!

. !I