4
,
September 16,1999
Mr. G. Rainey, President
PECO Nuclear
Nuclear Group Headquarters
Correspondence Control Desk
P. O. Box 195
Wayne, PA 19087-0195
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-352/99-05,50-353/99-05
Dear Mr. Rainey:
On August 16,1999, the NRC completed an inspection at your Limerick Generating Station,
Units 1 and 2. Resident inspectors reviewed routine activities and regionalinspectors reviewed
aspects of your maintenance and emergency preparedness programs. The enclosed report
presents the results of this inspection.
We concluded that your staff continued to ooerate both units safely. Your operators responded
well to plant challenges caused by the extei.
t weather conditions.
Based on the results of this inspection, the NRC has determined that one violation of NRC
requirements occurred. The violation related to inoperability of the automatic depressurization
system during maintenance. This violation is being treated as a Non-Cited Violation (NCV),
l
consistent with Appendix C of the Enforcement Policy. The NCV are described in the subject
inspection report. If you contest the violation or severity level of the NCV, you should provide a
response within 30 days of the date of this inspection report, with the basis for your denial, to the
Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001,
with a copies to the Regional Administrator, Region I, and the Director, Office of Enforcement,
United States Nuclear Regulatory Commission, Washington, DC 20555-0001 and the NRC
resident at the Limerick Generating Station.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure (s), and your response will be placed in the NRC Public Document Room (PDR).
Sincerely,
9909240107 990916
U"
ADOCK 05000352
0
Curtis Cowgill, Chief
Project Branch 4
Division of Reactor Projects
,
\\)
Docket Nos.: 50-352,50-353
i
'
Enclosures:
NRC Inspection Report 50-352/99-05,50-353/99-05
l}b . O I
'
i
.
,
1
l
'
.
i
<
i
l
. Mr. G. R. Rainey
2
'
cc w/ encl:
J. J. Hagan, Senior Vice President, Nuclear Operations
G. Edwards, Chairman, Nuclear Review Board and Director - Licensing
J. von Suskil, Vice President - Limerick Generating Station
M. P. Gallagher, Plant Manager, Limerick Generating Station
K. P. Bersticker, Manager, Experience Assessment
Secretary, Nuclear Committee of the Board
Commonwealth of Pennsylvania
l
l
l
l
!
l
l
)
L
_
.
.
Mr. G. R. Rainey
3
Distribution w/ encl:
Region I Docket Room (with concurrences)
NRC Resident inspector
Nuclear Safety Information Center (NSIC)
PUBLIC
H. Miller, RA/J. Wiggins, DRA
C. Cowgill, DRP
D. Florek, DRP
D. Cullison, DRP
C. O'Daniell, DRP
W. Lanning, DRS
B. Holian, DRS
Distribution w/ encl: (Via E-Mail)
M. Tschiltz, OEDO
E. Adensam, PDI-2, NRR
J. Clifford, NRR
B. Buckley, NRR
M. Thadani, NRR
- R. Correia, NRR
DOCDESK
Inspection Program Branch, NRR (IPAS)
Tysceive a copy of thP,gG:\\ BRANCH 4\\ Limerick \\ Lim 99-05 Rev4.wpd
DOCUMENT NAME
_,m;./., Indicate in the box: "C" = Cozy without attachment / enclosure
- E" = Copy with attachrnent/ enclosure
"N" = No copy
OFFICE Rl/DF])@
l
Rl/DRP
/
l
l
l
NAME
ABudW l'
CCowgi!!
I
DATE
09@l99
09/ /99
09/ /99
09/ /99
09/ /99
V
OFFICIAL RECORD COPY
!
. !I