ML20210U221
| ML20210U221 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 08/10/1999 |
| From: | Cowgill C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rainey G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20210U226 | List: |
| References | |
| 50-352-99-04, 50-353-99-04, NUDOCS 9908200039 | |
| Download: ML20210U221 (3) | |
See also: IR 05000352/1999004
Text
F
t .,i
.u
p
l
l
August 10,1999
i
.
Mr. G. Rainey, President
!
PECO Nuclear
Nuclear Group Headquarters
Correspondence Control Desk
P. O. Box 195
Wayne, PA 19087-0195
L
i
SUBJECT:
NRC INTEGRATED INSPbCTION REPORT 50-352/99-04, 50-353/99-04
Dear Mr. Rainey:
l
On July 12,1999, the NRC completed an inspection of routine activities at your Limerick
~
Generating Station, Units 1 and 2. The enclosed report presents the results of this inspection.
We concluded that your staff continued to operate both units safely. Nevertheless, we note that
several personnel errors are documented in this inspection report. In particular, one personnel
!
error caused an unintended automatic reactor shutdown. Two other personnel errors resulted in
j
technical specification surveillance activities not being performed when required, one of which
resulted in a violation as described below.
Based on the results of this inspection, the NRC has determined that one violation of NRC
requirements occurred. The violation involved the late performance of an off-gas grab sample
surveillance and was the result of a personnel erretr. This violation is being treated as a Non-
Cited Violation (NCV), consistent'with Appendix C of the Enforcement Policy. -This NCV is
described in the enclosed inspection report. If you contest the violation or severity level of this
NCV, you should provide a response within 30 days of the date of this inspection report, with the
basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington DC 20555-0001, with a copies to the Regional Administrator, Region I, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
DC 20555-0001 and the NRC Resident inspector at the Limerick Generating Station.
1
'
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
i
enclosure (s), and your response will be placed in the NRC Public Document Room (PDR).
1
Sincerely,
Original Signed By: -
Curtis Cowgill, Chief
Project Branch 4
'
Division of Reactor Projects
[
200005
l
9908200039 990810
R
ADOCK 05000352
G
L
"
l
e
a
.i-
,.
,
'~
l
,.
- :
Mr. G. R. Rainey
2
l
' Docket Nos.: 50-352,50-353
l
Enclosure:
NRC Inspection Report 50-352/99-04, 50-353/99-04
l
cc w/ encl:
l
J. J. Hagan, Senior Vice President, Nuclear Operations
G. Edwards, Chairman, Nuclear Review Board and Director - Licensing
J. ~ von Suskil, Vice President - Limerick Generating Station
M. P. Gallagher, Plant Manager, Limerick Generating Station
K. P. Bersticker, Manager, Experience Assessment
.
I
Secretary, Nuclear Committee of the Board
l
Commonwealth of Pennsylvania
i
1
-
,
l
i
J
., s -
i
.
Mr. G. R. Rainey
3
Distribution w/ encl:
Region i Docket Room (with concurrences)
NRC Resident inspector
Nuclear Safety Information Center (NSIC)
PUBLIC
H. Miller, RA/J. Wiggins, DRA
C. Cowgill, DRP
D. Florek, DRP
D. Cullison, DRP
C. O'Daniell, DRP
Distribution w/ encl:(Via E-Mail)
M. Tschiltz, OEDO
E. Adensam, NRR
M. Thadani, NRR
B. Buckley, NRR
R. Correia, NRR
DOCDESK
Inspection Program Branch, NRR (IPAS)
a
. DOCUMENT NAME: G:\\ BRANCH 4\\ Limerick \\ LIM 99-04 Revision 8.wpd
Tt receive a copy of this document. Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure
- N" = No copy
OFFICE
Rl/j6 %
l
Rl/DRP(/M
/
l
l
NAME
A@ \\) -
CCowgill
DATE
08/10/99
08//0/99
08/ /99
08/ /99
08/ /99
OFFICIAL RECORD COPY
,
J