Text
y
-
-
j
c
.
,
,
March 26,1999
Mr. G. Rainey, President
PECO Nuclear
Nuclear Group Headquarters
Correspondence Control Desk
P. O. Box 195
Wayne, PA 19087-0195
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-352/99-01,50-353/99-01
Dear Mr. Rainey:
On March 1,1999, the NRC completed a 7-week inspection at Limerick Generating Station. The
enclosed report contains the details of that inspec' ion.
l
Limerick Units 1 and 2 were operated safely during the period. Your staffs conduct of activities
during this period was characterized by safe and conservative decision making. In particular
your staffs actions to perform an internal valve inspection to confirm operability of HV-087-1208,
a primary containment isolation valve, demonstrated conservative decision making and a focus
on early identification and resolution of equipment problems. Also, your staff continued to
j
implement effective Radiological Environmental Monitoring and Meteorological Monitoring
Programs.
Based on the results of this inspection, the NRC has determined that one violation of NRC
requirements occurred. This violation is being treated as Non-Cited Violation (NCV), consistent
with Appendix C of the Enforcement Policy. The NCV is described in the subject inspection
report. If you contest the violation or severity level of the NCV, you should provide a response
within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear
Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with a
copies to the Regional Admiristrator, Region I, and the Director, Office of Enforcement, United
States Nuclear Regulatory Commission, Washington, DC 20555-0001.
I
90\\
\\
9
$g401013599k052
-
ADOCK 05
k
.-
r
fo
.
Mr. G. R. Rainey
2
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure (s), and your response will be placed in the NRC Public Document Room (PDR).
Sincerely,
Original Signed By:
Curtis J. Cowgill, Chief
Project Branch No. 4
Division of Reactor Projects
l
Docket Nos.: 50-352,50-353
Eaciosures:
NRC Inspection Report 50-352/99-01, 50-353/99-01
cc w/enci:
J. J. Hagan, Vice President, Nuclear Station Support
G. Edwards, Chairman, Nuclear Review Board and Director - Licensing
J. von Suskil, Vice President - Limerick Generating Station
M. P. Gallagner, Plant Mansger, Limerick Generating Station
T. Moore, Manager, Experience Assessment
l
Secretary, Nuclear Committee of the Board
l
R. A. Calvan, Regional Director, FEMA, Region ill
Commonwealth of Pennsylvania
j
,
l
l
.-
-
Mr. G. R. Rainey
3
Distribution w/ encl:
Region i Docket Room (with concurrences)
NRC Resident inspector
' Nuclear Safety Information Center (NSIC)
. PUBLIC
H. Miller, RA/J. Wiggins, DRA (1) (irs)
C. Cowgill, DRP
D. Florek, DRP
D. Cullison, DRP
C. O'Daniell, DRP
Distribution w/ encl: (Via E-Mail)
,
M. Tschiltz, OEDO
E. Adensam, PDl-2, NRR
R. Correia, NRR
DOCDESK
. Inspection Program Branch, NRR (IPAS)
l
DOCUMENT NAME: G:\\ BRANCH 4\\ LIM \\ LIM 99-01.WPD
- Ta receive a copy of this document, Indicate !n the box: "C" * Copy without attachment / enclosure 'E" = Copy with attachment / enclosure "N" = No copy
OFFICE
Rl/DRP
l
Rl/DRP ()L. l
/
l
NAME
ABurritt \\
CCowgill' '
DATE
@ 2499 , M .
033ff99
03/ /99
03/ /99
03/ /99
'
OFFICIAL RECORD COPY