| Site | Start date | Title | Description |
---|
ML24319A056 | | 20 November 2024 | NRC Presentation for ACRS Meeting November 20, 2024, Artificial Intelligence Project Plan | |
IR 05000456/2024003 | Braidwood | 12 November 2024 | Integrated Inspection Report 05000456/2024003 and 05000457/2024003 | |
IR 05000400/2024003 | Harris | 7 November 2024 | Integrated Inspection Report 05000400/2024003 | |
CNL-24-014, License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22) | Watts Bar Sequoyah | 4 November 2024 | License Amendment Request to Revise the Sequoyah Nuclear Plant, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2 Technical Specifications to Use Online Monitoring Methodology (SQN-TS-24-02 and WBN-TS-23-22) | |
LG-24-109, CFR 50.59 and 10 CFR 72.48 Evaluation 24-Month Summary Report for the Period July 1, 2022 Through June 30, 2024 | Limerick | 1 November 2024 | CFR 50.59 and 10 CFR 72.48 Evaluation 24-Month Summary Report for the Period July 1, 2022 Through June 30, 2024 | |
ML24254A463 | | 31 October 2024 | Sdaa FSER Chapter 14 - ITAAC | |
ML24311A020 | Columbia | 24 October 2024 | Energy Northwest, Emergency Preparedness Procedure 13.14.11, Revision 018, EP Equipment | |
ML24276A133 | FitzPatrick | 17 October 2024 | Issuance of Amendment No. 357 Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision-4, and Administrative Changes | |
IR 05000416/2024011 | Grand Gulf | 16 October 2024 | – Fire Protection Team Inspection Report 05000416/2024011 | |
05000445/LER-2024-002-01, Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions | Comanche Peak | 3 October 2024 | Condition Prohibited by Technical Specifications Due to Inoperable Remote Shutdown System Functions | |