ML20210L201

From kanterella
Jump to navigation Jump to search
Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh
ML20210L201
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/28/1999
From: Von Suskil J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 9908090061
Download: ML20210L201 (2)


Text

O . von W g vca Pmedent Lrnerck Generating Station

.. l PECO NUCLEAR n eo m ,g,c - n, A Unit of PECO Energy PO Box 2300

' sus 11 Sanatoga. PA 19464 0920 610 718 3000 / Fax 610 718 3008 Pager 1800 672 2285 *0271 internet adoms:jvonsuskdepeco-energy 10 CFR 55.35 l Mr. Hubert J. Miller, Regional Administrator July 28,1990 {

i U. S. Nuclear Regulatory Commission Docket Nos. 50-352 l' Region 1 50-3'i3 475 Allendale Road License Nos. NPF 39 King of Prussia, PA 19406 NPN85

{

l

SUBJECT:

Limerick Generating Station, Units 1 and 2 Preliminary Replacement Operator Program Qualification Statement Dear Mr. Miller-

ased is the final (i.e., signed) Personal Qualifica+ ion Statement (NRC Form 398) for the Reactor upcrator (RO) license candidate identified below. The candidate failed the Category B portion of the operating examination given at the Limerick Generating Station during the week of March 15,1999.

Details of the waiver request for 'he portions of the examination the candidate passed are contained on the attachment sheet for NRC Form 398.

l A re-examination date has been set for August 12,1999.  !

l Name Current Position License Anchcatbn McHugh, Lane B. Eq'uipment Operator RO This final application is being sent to satisfy the specifications of NUREG 1021, ES-202, Part C.1. and ES-204 Part D.

If you have any questions please contact Mr. Jeffrey Klenk at the Limenck Generstmg Station, (610)718-4010.

Sin rely,

\

closure O xc: R. J. Conte, Chief, Human Performance and Emergency Preparedness Branch, Division of Reactor Safety, USNRC, Region 1 J. H. Williams, USNRC, Region 1 j C. E. Sisco, USNRC, Region i y

A. L. Bumtt, USNRC Senior Resident inspector, LGS Document Control Desk, USNRC, Washington, DC jf'

/

9908090061 990728 PDR ADOCK 05000352 V PDR

s Mr. Hubert J. Miller x

e Enclosure 1 NRC Form 398 Block 17 Comments (Continued)

Lane B. McHugh 4.f Waiver Reauested Waiver from re-examination is requested for the following:

4.f.1 Wntten Examination Candidate passed the wntten examination on March 12,1999 4.f.2 Operating Category A Candidate passed the Category A and C sections of the Operating Category C examination dunng the week of March 15,1999 13.7 Training Since Last Candidate has received in-depth re-training and evaluation for Application JPM and Category B question performance including:

e 122 hours0.00141 days <br />0.0339 hours <br />2.017196e-4 weeks <br />4.6421e-5 months <br /> guided self-study

  • 44 hours5.092593e-4 days <br />0.0122 hours <br />7.275132e-5 weeks <br />1.6742e-5 months <br /> JPM practice in-plant e 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br /> JPM prachce in the simulator e 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> system tneckouts e

4 evaluated Category B sessions (16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> total) and oral board (4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />).

9