h n uto
'f, C
- UNITED STATES E
NUCLEAH REGULATORY COMMISSION WASHINGTON, D.C. ensam wi
/
March 10, 1999 Mr. David J. Robare Technical Account Manager 1l General Electric Nuclear Energy M/C 747 175 Curtner Avenue San Jose, CA 95125
SUBJECT:
REQUEST FOR WITHHOLDING INFORMATION FROM PUB'LIC DISCLOSURE, LIMERICK GENERATING STATION, UNITS 1 AND 2 (TAC NOS. MA4561 AND MA4562)
Dear Mr. Robare:
In PECO Energy Company's January 12,1999, application and your affidavit datLJ December 17,1998, the following document was submitted as Enclosure 1 and it was requested that it be withheld from public disclosure pursuant to 10 CFR 2.790:
j NEDC-32645P, Limerick Generating Station, Units 1 and 2, SRV Setpoint Tolerance Relaxation Licensing Report," Revision 2, dated December 1998.
{
You indicated that the submitted proprietary information should be considered exempt from mandatory public disclosure for the following reasons:
1
- 1. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies; l
- 2. Information which, if used by a competitor, would reduce his expenditure of f
resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, orlicensing of a similar product; 1
i
analysis computer codes used in this analysis was achieved at a significant cost, on i.
the order of several million dollars to GE.
- 4. The development of tne evaluation process along with the interpretation and application of the analytical results is derived from the extensive experience database that constitutes a major GE asset.
We have reviewed your application and the materbi in accordance with the requirements of 10 CFR 2.790 and, on the basis of your stateme ".s, have determined that de submitted information sought to be withheld contains prope t ry commercialinformation.
9903290168 990310 i
j PDR ADOCK 05000352 O' ( (g P
PDR 290 W ggg gg ggggg gy
)
k D. Robare,
Therefore, Enclosure 1 (listed above) submitted with PECO Energy Company's January 12, 1999, letter to the NRC, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons prcperly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information, if the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. - You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any pubHc disclosure.
Sincerely, 4
original signed by:
Bartholomew C. Buckley, Senior Project f& aager Project Directorate 1-2 Division of Licensing Project Management Office of Nuclear Resctor Regulation Docket Nos. 50-352 and 50-353 cc: See next page plSTRIBUTION Docket File MSiemien, OGC PUBLIC CCowgill, RGN 1 PDl-2 Reading KManoly JZwolinski JWermiel EAdensam MPSiemien BBuckley
- MO'Brien
- Previously Concurred i
OFF PDIJJPM PDl-2/lA EMEB*
SRXB/BC*
OGC*
P91 W NAME BSuNy:rb hah KManoly JWermiel MPSiemien EA nsam l
DATE 3/9/99 b/h/99 02f23/99 02/25/99 03/02/99
"$ /l0/98 OFFICIAL RECORD COPY l
DOCUMENT NAME: Ll4561. PRO 1
1
3 D. Robare Therefore, Enclosure 1 (listed above) submitted with PECO Energy Company's January 12, 1999, letter to the NRC, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the q
consultants have signed the appropriate agreements for handling proprietary information.
l If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, M
tfa)O E
Bartholomew C. Buckley, Senior Project Manager Project Directorate 1-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50 352 and 50-353 i
cc: See next page l
l l
l i
I i
J
t D. Robare Therefore, Enclosure 1 (listed above) submitted with PECO Energy Company's January 12, 1999, letter to the NRC, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concemed to inspect the documents. If the need arises, we may send copies of this information to our consultante working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information, in all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Sincerely, original signed by:
Bartholomew C. Buckley, Senior Project Manager Project Directorate 1-2 1
Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-352 and 50-353 cc: See next page t
DISTRIBUTION Docket File MSiemien, OGC PUBLIC CCowgill, RGN-l i
PDl-2 Reading KManoly JZwolinski JWermiel EAdensam '
MPSiemien i
BBuckley
~
i MO'Brien
- Previously Concurred j
i OFF-PDl-2/PM PDl2/lA EMEG*
SRXB/BC*
OGC*
P 9I-WIP I
NAME BB y:rb' I
2 K,Aanoly Jif emiel MPSiemien EA nsam DATE 3 ' /7/9S h/h/99 02/23/99 '
02/25/99 03/02/99 3 /l0/98 OFFICIAL RECORD COPV l
DOCUMENT NAME: Ll4561. PRO a
.a, Mr. Garrett D. Edwards Limerick Gene 'ing Station, Units 1 & 2 PECO Energy Company cc:
J. W. Durtiam, Sr., Esquirs Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of Environmental Resources PECO Energv Company P.O. Box 8469 2301 Market Strat Harrisburg, PA 17105-8469 Philadelphia, PA 19101 Manager-Limerick Licensing,62A-1 Director-Site Engineering PECO Energy Company Umerick Generating Station 965 Chesterbrook Boulevard P.O. Box A Wayne, PA 19087-5691 Sanatoga, PA 19464 Mr. James D. von Suskil, Vice President Limerick Generating Station Manager-Experience Assessment Post Office Boy A Limerick Generating Station Sanatoga, PA 19464 P.O. Box A Sanatoga, PA 19464 Plant Manager Limerick Generating Station Library P.O. Box A U.S. Nuclear Regulatory Commission Sanatoga, PA 19464 Region I 475 Allendale Road Regional Administrator, Region i King of Prussia, PA 19406 U.S. Nuclear Regulatory Commission 475 Allendale Road Senlar Manager Operations King of Prussia, PA 19406 Limerick Generating Station P.O. Box A Senior Resident inspector Sanatoga, PA 19464 U.S. Nuclear Regulatory Commission Limerick Generating Station Dr. Judith Johnsrud P.O. Box 596 National Energy Committee Pottstown, PA 19464 Sierra Club 433 Orlando Avenue Directo -Site Support Services State College, PA 16803 Limerick Generating Station P.O. Box A Sanatoga, PA 19464 Chairman
- Board of Supervisors of Limerick Township 646 West Ridge Pike Linfield, PA 19468
~~
-- -