Text
. .
-
-
-
-
.
.
_
-
.-
.
.
.
- .
.
,
4
. -
- 007 1 2 1990-
!
Docket Nos. 50-352
50-353
,
A
Philadelphia Electric Company
ATTN:
Mr. D. M. Smith
Scnior Vice President-Nuclear
i
Nuclear Group Headquarters
.
Correspondence Control Desk
P.O. Box 195
.
Wayne, Pennsylvania 19087-0195
Gentlemen:
Subject:
Inspection No. 50-352/90-20 and 50-353/90-19
This letter transmits the results of the routine resident safety inspection by Messrs. T. Kenny,
L. Scholl, and Ms. M. Evans from August 13 - September 16,1990, at the Limerick Generating
Station, Limerick, Pennsylvania. The inspection consisted of document reviews, interviews, and
observations of activities. The results have been discussed with Mr. John W ' Spencer of your
staff.
P
No violations were identified by the NRC during this inspection. .We noted that the control room
.
staff response to the Unit 2 scram, including the supervision and direction provided by the shift
manager and shift supervisor, was excellent. Also, we found the decision to shutdown Unit 2-
_
l
to address the electro-hydraulic control problems;was positive and oriented towards safety.
_
However, we also noted several personnel errors resulting in' safety system actuations indicating
continued management attention in this area is warranted.
.
We appreciate your cooperation.
Sincerely,
i
A. Randolph Blough, Chief
Projects Branch No. 2
Division of Reactor Projects
'
Enclosure: NRC Region 1 Inspection Report 50-352/90-20 & 50-353/90-19
h01bE60144 9010.12
DR
ADOCK 0500
g2
['
llt
.-
.. .
-
.-
.
_
_
-
-
- .
.
,
,
.'
,
,
4
.
Philadelphia Electric Company
2
'
cc w/encls:
R. J. Lees, Chairman, Nuclear Review Board-
G. M. Leitch, Vice President - Limerick Generating Station ~
D. R. Helwig, Vice President of Nuclear Engineering and Services
,
J. W. Durham, Sr. Vice President and General Council
M. J. McCormick, Jr., Manager - Limerick Generating Station
G. A. Hunger, Jr., Director - Licensing Section
J. Doering, Project Manager - Limerick Generating Station
J. F. O'Rourke, Manager - Limerick Quality Division
i
G. J. Madsen, Regulatory Engineer - Limerick Generating Station
T. B. Conner, Jr. Esquire
Secretary, Nuclear Committee of the Board
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
,
l
)
,
l
.
l
u
+
.7,._.
,
. _ .
..c
..
.
,
-
. ..
.
.
-
y
,
'
"
,
.
,
.
.
9
Philadelphia Electric Company
3
'
bec w/encls:
,
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
R. Blough, DRP
L. Doerflein, Section Chief, DRP
i
P. Kaufman, DRP
M. Conner (SALP Reports only)
K. Abraham, PAO (20) SALP Report
M. Miller, SLO
J. Caldwell, NRR
-
-
R. Clark, NRR
R. Bellamy, DRSS
,
bec w/ letter and Executive Summary only:
W. Hehl, DRP
J. Wiggins, DRP
W. Hodges, DRS
J. Durr, DRS
R. Gallo, DRS
M. Knapp, DRSS
.
J. Lyash, SRI-Peach Bottom
B. Norris, PI-Shoreham
W. Butler, NRR
!
D'
Wh
RI:DRP
RI:DRP
RI:DRP
-hKenny
Doerflein
Blough-
'
,
10/iU90
10/1490
10/490
-!
I
OFFICIAL RECORD COPY
4
1
l
.