ML20062B789

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-352/90-20 & 50-353/90-19 on 900813-0916.No Violations Noted
ML20062B789
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/12/1990
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20062B790 List:
References
NUDOCS 9010260144
Download: ML20062B789 (3)


See also: IR 05000352/1990020

Text

. . - - - - . . _ - .-

  • * .

.

.

. ,  ;.

4

.-

- 007 1 2 1990-  ;

!

Docket Nos. 50-352

50-353 ,

A

Philadelphia Electric Company

ATTN: Mr. D. M. Smith

Scnior Vice President-Nuclear i

Nuclear Group Headquarters .

Correspondence Control Desk

P.O. Box 195 .

Wayne, Pennsylvania 19087-0195

Gentlemen:

Subject: Inspection No. 50-352/90-20 and 50-353/90-19

This letter transmits the results of the routine resident safety inspection by Messrs. T. Kenny,

L. Scholl, and Ms. M. Evans from August 13 - September 16,1990, at the Limerick Generating

Station, Limerick, Pennsylvania. The inspection consisted of document reviews, interviews, and

observations of activities. The results have been discussed with Mr. John W ' Spencer of your

staff.

P

No violations were identified by the NRC during this inspection. .We noted that the control room

.

staff response to the Unit 2 scram, including the supervision and direction provided by the shift

manager and shift supervisor, was excellent. Also, we found the decision to shutdown Unit 2-

_

l to address the electro-hydraulic control problems;was positive and oriented towards safety.

_

However, we also noted several personnel errors resulting in' safety system actuations indicating

continued management attention in this area is warranted.

.

We appreciate your cooperation.

Sincerely,  ;

i

A. Randolph Blough, Chief

Projects Branch No. 2

Division of Reactor Projects

'

Enclosure: NRC Region 1 Inspection Report 50-352/90-20 & 50-353/90-19

h01bE60144 9010.12

DR ADOCK 0500 g2 ['

llt

.- .. . - .- . _ _ - - - .

. ,

,

.' ,

,

. 4

Philadelphia Electric Company 2

'

cc w/encls:

R. J. Lees, Chairman, Nuclear Review Board-

G. M. Leitch, Vice President - Limerick Generating Station ~

D. R. Helwig, Vice President of Nuclear Engineering and Services ,

J. W. Durham, Sr. Vice President and General Council

M. J. McCormick, Jr., Manager - Limerick Generating Station

G. A. Hunger, Jr., Director - Licensing Section  !

J. Doering, Project Manager - Limerick Generating Station

J. F. O'Rourke, Manager - Limerick Quality Division i

G. J. Madsen, Regulatory Engineer - Limerick Generating Station

T. B. Conner, Jr. Esquire

Secretary, Nuclear Committee of the Board

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

,

l

)

,

l .

l

u

I

+ .. . ,

- . .. . .

-

, y

' "

,

, .

. .

9

Philadelphia Electric Company 3

'

bec w/encls: ,

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

R. Blough, DRP

L. Doerflein, Section Chief, DRP

i

P. Kaufman, DRP

M. Conner (SALP Reports only)

K. Abraham, PAO (20) SALP Report

M. Miller, SLO

J. Caldwell, NRR

-

-

R. Clark, NRR

R. Bellamy, DRSS ,

bec w/ letter and Executive Summary only:

W. Hehl, DRP

J. Wiggins, DRP

W. Hodges, DRS

J. Durr, DRS

R. Gallo, DRS

M. Knapp, DRSS .

J. Lyash, SRI-Peach Bottom

B. Norris, PI-Shoreham

W. Butler, NRR

!

D'

RI:DRP

Wh

RI:DRP RI:DRP

-hKenny Doerflein Blough-

'

,

10/iU90 10/1490 10/490 -!

l

I

OFFICIAL RECORD COPY

l

4

1 l

l .