Text
-
.
c, 0 ,,
i
.e
- ..
-l
'
.
i
'
AUG 0 31990
r
%
Docket Nos. 50-352
,
50-353
i
-
Philadelphia Electric Company
A'ITN:
Mr. D. M. Smith
Senior Vice President-Nuclear
,
Nuclear Group Headquarters
.i
Correspondence Control Desk
i
P.O. Box 195
Wayne, Pennsylvania 19087-0195
Gentlemen:
-
,
Subject:
Inspection No. 50 352/90-17 and 50-353/90-16
This letter transmits the results of routine resident safety inspection by Messrs. T. Kenny, L.
Scholl, and Ms. M. Evans from May 22 - July 1,1990 at the Limerick Generating Station,
Limerick, Pennsylvania. The inspection consisted of document reviews, interviews, and
i
observations of activities. The results have been discussed with Mr. Graham leitch and Mr.
Martin McCormick, Jr. of your staff.
a
Based on our inspection, two violations of Plant Technical Specifications were identified.
The first violation involves failure to properly implement the provisions of the ASME Boiler
and Pressure Vessel Code,Section XI, Inservice Test Program. This violation has been
categorized by Severity Level according to 10 CFR Part 2, Appendix C (Enforcement
Policy). You are required to respond to this violation and in preparing your response you
,
should follow the instructions in Appendix A.
>
. An additional violation of Technical Specifications was identified in that plant shutdown
procedures were not properly implemented during a transient. Based on our review of your
l
root cause analysis and the corrective actions already taken, no written response to this
l-
violation is required.
L'i
The inspectors continued to note problems with procedure compliance and in the technical
'
adequacy and implementation of procedures. Another recurring problem was the approval of
an inadequate technical justification by NED. Additional management attention is warranted
to ensure that these weaknesses are evaluated and resolved.
,
anockosoog2
0FFICI AL RECORD COPY
[
a
--
1
4
..
,
4
4
l
. ..
. .
.
-
p
.
,
AUG 0 31990
2
,
' Your cooperation is appreciated.
'
.
Sincerely,
,
'
,
.
-
t
ORIGidL SIGNED BY:
'
i
i.
A. Randolph Blough, Chief
Projects Branch No. 2
Division of Reactor Projects
. t
!
.
F
Enclosure:
NRC Region I Inspection Report 50-352/90-17 & 50-353/90-16
Appendix A, Notice of Violation
,
,
cc w/encls:
R. J. Lees, Chairman, Nuclear Review Board
G. M. Leitch, Vice President - Limerick Generating Station
D. R. Helwig, Vice President of Nuclear Engineering and Services
'
J. W. Durham, Sr. Vice President and General Council
M. J. McCormick, Jr., Manager - Limerick Generating Station
G. A. Hunger, Jr., Director - Licensing Section
J. Doering, Project Manager - Limerick Generating Station
J. F. O'Rourke, Manager - Limerick Quality Division
T. B. Conner, Jr., Esquire
!
G. J. Madsen, Regulatory Ent,ineer - Limerick Generating Station
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
Commonwealth of Pennsylvania
'
L
l'
___
CIAL RECORD CCPy
<
- . m
m .
..
-
.
-
a.
' ' , ' , - ' ', ?
'
-
.
,
3
AUG 0 3 m
'
bec w/encls
-
Region I Docket Room (with concurrences)
-Management Assistant, DRMA (w/o encl)
)
R.- Blough,' DRP
i
L. Doerflein, Section Chief, DRP
i
P. Kaufman, DRP
'
M. Conner (SALP Reports only)
K. Abraham, PAO (20) SALP Report
3
o
M. Miller, SLO
-
J. Caldwell, NRR
!
R. Clark, NRR
T. Kenny, SRI-Limerick
l
bec w/ letter and Executive Summary only:
.
W. Hehl, DRP
.,
J. Wiggins, DRP
i
W. Hodges, DRS .
J. Durr, DRS
R. Gallo, DRS
M. Knapp, DRSS -
J. Lyash, SRI-Peach Bottom
B. Norris, PI Shoreham
'
W. Butler, NRR
.
V
i
h
!
!
l
1
i,
/4L
'
<j I:DRP
RI:DRP
LDoerficin
RBlough
29C$1%
dNih
o m e m ucon c
- - . - .