ML20211P389

From kanterella
Jump to navigation Jump to search
Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018
ML20211P389
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/03/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9909130211
Download: ML20211P389 (3)


Text

p.:

S

[.

P September 3, 1999 Mr. G. Rainey, President

- PECO Nuclear.

Nuclear Group Headquarters Correspondence Control Desk P, O. Box 195 -

Wayne, PA 19087-0195

SUBJECT:

~ REQUALIFICATION PROG' RAM INSPECTION - LIMERICK

Dear Mr. Rainey:

~

- In a telephone conversation on September 2,1999, Mr. J. Williams, Examiner / Inspector, and

- Mr. B. Tracey, Requalification Training, made arrangements for the NRC to inspect the licensed operator requalification program at the Limerick Generating Station. The inspection is planned for the week of October 18,1999, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification l examinations in accordance with your NRC-approved requalification program.

' In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for -

this inspection, please fumish the operating tests scheduled for the week of the inspection to the NRC by October 11,1999. Also, please provide the exam schedule and a copy of your requalification program procedure. Mr. Tracey has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number .3150-0101, which expires on April 30, 2000.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

' Washington, DC 20555-0001, or by Intemet electronic mail atBJSi@NRC GOV: and to the h

/

Desk Officer, Office of information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of f Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. g

? 7 00

^

M N/

9909130211 990903 i PDR ADOCK 05000352 0 ,

PDR g

r v.

3 Mr. G. Rainey . -2 Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact J. Williams at (610) 337-5124.

Sincerely, ORIGINAL SIGNED BY:

Richard J. Conte, Chief Human Performance and  :

Emergency Preparedness Branch I Division of Reactor Safety Docket Nos. 50-352,50-353 l

1 cc.

i J. J. Hagan, Senior Vice President, Nuclear Operations Station Support i G. Edwards, Chairman, Nuclear Review Board J. A. Hutton, Director- Licensing, PECO Nuclear J. von Suskil, Vice President - Limerick Generating Station M. P. Gallagher, Plant Manager, Limerick Generating Station K. P. Bersticker, Manager, Experience Assessment Secretary, Nuclear Committee of the Board  !

Commonwealth of Pennsylvania .

R. A. Calvan, Regional Director, FEMA, Region lli (EP Exercise /lRs Only)

J. Stankiewicz, Director Training J. Klenk - Manager, Operator Training

m.

? ::

-e Mr. G.' Rainey #

Distribution:

Region i Docket Room (with concurrences) .

NRC Resident inspector

' Nuclear Safety information Center (NSIC) .

PUBLIC H. Miller, RA/J. Wggins, DRA C. Cowgill, DRP ' j D. Florek, DRP D. Cullison, DRP W. Lanning, DRS B. Holian, DRS R. Conte, DRS J. Williams, DRS I

. OL Facility File (V. Curley, DRS)

~ DRS File Distnbution:(Via E-Mail)

M. Tschiltz, OEDO E. Adensam, NRR J. Cli#ord, NRR B. Buckley, NRR R. Correia, NRR

.DOCDESK

. Inspection Program Branch, NRR (IPAS) l I

' DOCUMENT NAME: G:\HPEPB\ WILLIAMS \ LIM 60DAYRPl.WPD To receive a copy of this document, Indicate in the box: "C" = Ce g without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRS l Rl/DRS - / l l l l NAME JWilliams (#W RC_onte //V 8

DATE 09/03/99 09d /9F 09/ /99 09/ /99 09/ /99 OFFICIAL RECORD COPY l

J

g

^e y *:

/*.

. Mr. G. Rainey ' Disptribution'

,"~

  • Region l Docket Room (with concurrences)

_- NRC Resident inspector Nuclear Safety information Center (NSIC)

PUBLIC

: H. Miller, RA/J. Wiggins, DRAL C. Cowgill, DRP D. Florek, DRP --

D. Cullison, DRP W. Lanning, DRS .

'B Holian, DRS

,- R. Conte, DRS _ . ,

~

J. Williams, DRS . . .

OL Facility File (V. Curley, DRS)

DRS File Distnbution:(Via E-Mail)

M. Tschiltz, OEDO E. Adensam, NRR j J. Cli#ord, NRR l B. Buckley, NRR

- R. Correia, NRR l DOCDESK

' Inspection Program Branch, NRR (IPAS) s

~

l 1

DOCUMENT NAME
G:\HPEPB\ WILLIAMS \ LIM 60DAYRPl.WPD l

Ta seceive a copy of this document. Indicate in the box: "C" = CA 4 without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/DRS l Rl/DRS / l .l l  ;

NAME JWilliams (#W RConte //V  !

DATE 09/0$/99 09d /97 09/ /99 09/ /99 09/ /99 OFFICIAL RECORD COPY j j

I i

l

.a w ,..

e.

t .