Text
Si
4
n
,gy
-
.
,
,
,
F
22 SEP.1989
, -
IDocket Nos. 50-352 ~
'
50-353
'
sPh'iladelphia Electric Company
,1
-
ATTN: Mr.7 C. A. McNeill, Jr.
~
Executive Vice President-Nuclear
'
Correspondence Control Desk :
,
P.O. - Box 7520 '
J
[ ,.
Philadelphia, Pennsylvania' 19101
- Gentlemeni
E
Subjecti
Inspection No. 50-352/89-15 and 50-353/89-24
'This. letter transmits the routine resident safety inspection by Messrs.
~
'
.T. Kenny, L. Scholl,- R. Fuhrmeister and Ms. M. Evans from June 26, 1989 - July.
130,l1989 at.the Limerick Generating. Station, Limerick, . Pennsylvania. The-
inspection consisted of documentireviews, . interviews, and observations of'
>
. activities. The results have been ' discussed with Mr. Martin McCormick, Jr. lof-
.your, staff;
- ThisL reportLdelinates NR'C~ concerns identified during the mid cycle Systematic
'AssessmentTof Licensee' Performance (SALP) review, and the. licensee's self
assessment of-.their conduct of operations, which was discussed at a meeting in.
<
. Region I'on July 24, 1989. The concerns and your self, analysis', were for. the
mostipart in agreement. An exception was the. lack of self assessment presented?
-by the engineering department relative to support for unit operations. Your
, self analysis in this functional area was the subject of subsequent discussions
with the Senior Resident Inspector and will be discussed further in future
~
meetings.with Region I managers.
No violations of NRC Requirements were identified and no response to this
Lletter is required.
Your cooperatiori with us is appreciated.
'
Sincerely,
Original Signed g
James C. Linville
James C. Linville, Chief
Projects Branch No. 2
Division of Reactor Projects
Enclosure:
1.
NRC Region I Inspection Report 50-352/89-15 and 50-353/89-24
4
OFFICIAL RECORD COPY
CIR LIM 89-15/24 - 0001.0.0
09/22/89
$.h00g y h [$$! 2gf
j
g
-
gj
G-
.
_ _ .
,
'G
,
Philadelphia Electric Company
2
22 SEP 1989
cc w/ encl:
J. S. Kemper, Sr., Senior Vice President - Nuclear Construction
G. M. Leitch, Vice President - Limerick Generating Station
S. J. Kowalski, Vice President - Nuclear Engineering
D. R. Helwig, General Manager - Nuclear Services
M. J. McCormick,. Jr. , Manager - Limerick Generating Station
W. T. Ullrich, Manager - Limerick Unit 2 Startup
A. S. MacAinsh, Manager - Limerick Quality Division
G. A. Hunger, Jr. , Director - Licensing Section
T. B. Conner, Jr. , Esquire
E. J. Bradley, Esquire, Assistant General Counsel
H. D. Honan, Branch Head
Nuclear Engineering Licensing
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/ enc 1:
Region I Docket Room (with concurrences)
-
Management Assistant, DRMA (w/o encl)
L. Doerflein, Section Chief, DRP
J. Dyer, EDO Office
R. Clark, NRR Project Manager
T. Johnson, SRI, Peach Bottom
T. Kenny, SRI, Limerick
P. Kaufman, Project Engineer
E. Conner, Reactor Licensing / Risk Engineer
h
Y
RI:DRP
RI:DRP[
R
pKenny/rh1
pDoerflein
Li ville
9Af/89
9/z489
9/g/89