ML20248E518

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-352/89-15 & 50-353/89-24 on 890626-0730.No Violations Noted.Repts Delineate NRC Concerns Identified During mid-cycle SALP Review & Licensee self-assessment of Conduct of Operations
ML20248E518
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 09/22/1989
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20248E519 List:
References
NUDOCS 8910050267
Download: ML20248E518 (2)


See also: IR 05000352/1989015

Text

Si n 4

,gy

,

,

,

.

-

F

'

22 SEP.1989

, -

IDocket Nos. 50-352 ~

50-353

sPh'iladelphia Electric Company

'

,1 -

ATTN: Mr.7 C. A. McNeill, Jr. ~

'

Executive Vice President-Nuclear

Correspondence Control Desk :

J

, P.O. - Box 7520 '

[ ,. Philadelphia, Pennsylvania' 19101

Gentlemeni

E

Subjecti Inspection No. 50-352/89-15 and 50-353/89-24

~

'This. letter transmits the routine resident safety inspection by Messrs.

'

.T. Kenny, L. Scholl,- R. Fuhrmeister and Ms. M. Evans from June 26, 1989 - July.

130,l1989 at.the Limerick Generating. Station, Limerick, . Pennsylvania. The-

>

inspection consisted of documentireviews, . interviews, and observations of'

. activities. The results have been ' discussed with Mr. Martin McCormick, Jr. lof-

.your, staff;

- ThisL reportLdelinates NR'C~ concerns identified during the mid cycle Systematic

'AssessmentTof Licensee' Performance (SALP) review, and the. licensee's self

assessment of-.their conduct of operations, which was discussed at a meeting in.

<

. Region I'on July 24, 1989. The concerns and your self, analysis', were for. the

mostipart in agreement. An exception was the. lack of self assessment presented?

-by the engineering department relative to support for unit operations. Your

, self analysis in this functional area was the subject of subsequent discussions

with the Senior Resident Inspector and will be discussed further in future

~

meetings.with Region I managers.

No violations of NRC Requirements were identified and no response to this

Lletter is required.

Your cooperatiori with us is appreciated.

'

Sincerely,

Original Signed g

James C. Linville

James C. Linville, Chief

Projects Branch No. 2

Division of Reactor Projects

Enclosure:

1. NRC Region I Inspection Report 50-352/89-15 and 50-353/89-24

4

OFFICIAL RECORD COPY CIR LIM 89-15/24 - 0001.0.0

09/22/89

-

$.h00g y h [$$! 2gf gj

j g

G-

.

_ _ .

,

'G

,

Philadelphia Electric Company 2

22 SEP 1989

cc w/ encl:

J. S. Kemper, Sr., Senior Vice President - Nuclear Construction

G. M. Leitch, Vice President - Limerick Generating Station

S. J. Kowalski, Vice President - Nuclear Engineering

D. R. Helwig, General Manager - Nuclear Services

M. J. McCormick,. Jr. , Manager - Limerick Generating Station

W. T. Ullrich, Manager - Limerick Unit 2 Startup

A. S. MacAinsh, Manager - Limerick Quality Division

G. A. Hunger, Jr. , Director - Licensing Section

T. B. Conner, Jr. , Esquire

E. J. Bradley, Esquire, Assistant General Counsel

H. D. Honan, Branch Head Nuclear Engineering Licensing

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1:

Region I Docket Room (with concurrences) -

Management Assistant, DRMA (w/o encl)

L. Doerflein, Section Chief, DRP

SLO

J. Dyer, EDO Office

R. Clark, NRR Project Manager

T. Johnson, SRI, Peach Bottom

T. Kenny, SRI, Limerick

P. Kaufman, Project Engineer

E. Conner, Reactor Licensing / Risk Engineer

h Y

RI:DRP RI:DRP[ R DRP

pKenny/rh1 pDoerflein Li ville

9Af/89 9/z489 9/g/89

0FFICIAL RECORD COPY CIR LIM 89-15/24 - 0002.0.0

09/22/89