Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217D5211999-09-30030 September 1999 Informs That Remediating 3D Monicore Sys at Pbaps,Units 2 & 3 & 3D Monicore/Plant Monitoring Sys at Lgs,Unit 2 Has Been Completed Ahead of Schedule ML20216J3981999-09-29029 September 1999 Submits Comments for Lgs,Unit 1 & Pbaps,Units 2 & 3 Rvid,Rev 2,based on Review as Requested in GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity ML20212J6561999-09-29029 September 1999 Informs of Completion of mid-cycle PPR of Limerick Generating Station on 990913.Identified No Areas in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Historical Listing of Plant Issues Encl ML20212H6401999-09-24024 September 1999 Forwards Revised Epips,Including Rev 11 to ERP-101 & Rev 18 to ERP-800.Copy of Computer Generated Rept Index Identifying Latest Revs of LGS Erps,Encl ML20212E7941999-09-22022 September 1999 Requests Authorization for Listed Licensed Operators to Temporarily Suspend Participation in Licensed Operator Requalification Program at LGS ML20212E8081999-09-22022 September 1999 Provides Notification That Listed Operators Have Been Permanently Reassigned to Duties That Do Not Require Maintaining Licensed Operator Status,Per 10CFR50.74 ML20212F5481999-09-20020 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2 ML20212F8991999-09-17017 September 1999 Provides Written Confirmation That Thermo-Lag 330-1 Fire Barrier Corrective Actions at Lgs,Units 1 & 2 Have Been Completed 05000353/LER-1999-010, Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl1999-09-16016 September 1999 Forwards LER 99-010-00,re Manual Actuation of Esf.Main CR Ventilation Sys Was Placed in Chlorine Isolation Mode Due to Rept of Faint Odor of Chlorine in Unit 2 Reactor Encl ML20216F7821999-09-16016 September 1999 Forwards Insp Repts 50-352/99-05 & 50-353/99-05 on 990713-0816.One Violation Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Inoperability of Automatic Depression Sys During Maint ML20212A8751999-09-13013 September 1999 Forwards Safety Evaluation of First & Second 10-year Interval Inservice Insp Plan Request for Relief ML20211N5061999-09-0909 September 1999 Forwards TSs Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS, Units 1 & 2,being Issued to Assure Distribution of Revised Bases Pages to All Holders of TSs ML20212A0091999-09-0909 September 1999 Provides Notification That Licenses SOP-11172 & SOP-11321, for SO Muntzenberger & Rh Wright,Respectively,Are No Longer Necessary as Result of Permanent Reassignment ML20211P8571999-09-0808 September 1999 Forwards Reactor Operator Retake Exams 50-352/99-303OL & 50-353/99-303OL Conducted on 990812 ML20211P3891999-09-0303 September 1999 Informs That During 990902 Telcon Between J Williams & B Tracy,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant.Insp Planned for Wk of 991018 05000352/LER-1999-009, Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed1999-09-0101 September 1999 Forwards LER 99-009-00,providing 30-day Written follow-up Rept Re Performance of Maint That Affected Safeguard Sys for Which Compensatory Measures Had Not Been Employed ML20211H2571999-08-26026 August 1999 Informs of Individual Exam Result on Initial Retake Exam on 990812.One Individual Was Administered Exam & Passed ML20211E9191999-08-24024 August 1999 Forwards fitness-for-duty Program Performance Data for Jan-June 1999 for PBAPS & LGS IAW 10CFR26.71(d).Data Includes Listed Info ML20211E9731999-08-23023 August 1999 Forwards LGS Unit 2 Summary Rept for 970228 to 990525 Periodic ISI Rept Number 5, Per TS SRs 4.0.5 & 10CFR50.55a(g) ML20211D6761999-08-20020 August 1999 Forwards non-proprietary Revised Emergency Response Procedures (Erps),Including Rev 29 to ERP-110, Emergency Notification & Rev 17 to ERP-800, Maint Team & Proprietary App ERP-110-1.App Withheld Per 10CFR2.790(a)(6) ML20210T4271999-08-13013 August 1999 Informs That NRC Revised Info in Rvid & Releasing Rvid Version 2 as Result of Review of 980830 Responses to GL 92-01 Rev 1,GL 92-01 Rev 1 Suppl 1 & Suppl Rai.Tacs MA1197 & MA1198 Closed ML20210U2211999-08-10010 August 1999 Forwards Insp Repts 50-352/99-04 & 50-353/99-04 on 990525-0712.One Violation Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy.Violation Re Late Performance of off-gas Grab Sample Surveillance 05000353/LER-1999-005, Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint1999-08-10010 August 1999 Forwards LER 99-005-00,re Actuation of Primary Containment & Reactor Vessel Isolation Control Sys,Esf.Fuse Failed Due to Mechanical Failure of Cold Solder Joint ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210M7571999-08-0404 August 1999 Forwards Response to Requesting Addl Info Re Status of Decommissioning Funding for Lgs,Pbaps & Sngs. Attachment Provides Restatement of Questions Followed by Response ML20210P4191999-08-0404 August 1999 Forwards Initial Exam Repts 50-352/99-302 & 50-353/99-302 on 990702-04 (Administration) & 990715-22 (Grading).Six of Limited SRO Applicants Passed All Portion of Exam NUREG-1092, Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls1999-08-0303 August 1999 Informs J Armstrong of Individual Exam Results for Applicants on Initial Exam Conducted on 990702 & 990712-14 at Facility.All Six Individuals Who Were Administered Exam, Passed Exam.Without Encls ML20210L2011999-07-28028 July 1999 Forwards Final Personal Qualification Statement (NRC Form 398) for Reactor Operator License Candidate LB Mchugh ML20211F2641999-07-27027 July 1999 Forwards Three Copies of Rev 12 to LGS Physical Security Plan, Rev 4 to LGS Training & Qualification Plan & Rev 2 to LGS Safeguards Contingency Plan. Without Encls 05000352/LER-1999-008, Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator1999-07-23023 July 1999 Forwards LER 99-008-00 Re 990623 Failure of Plant HPCI Sys to Start Due to Failure of HPCI Turbine,Hydraulic Actuator 05000353/LER-1999-004, Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs1999-07-23023 July 1999 Forwards LER 99-004-00 Re 990701 Discovery of Pressure Setpoint Drift of Thirteen Mss SRV Due to Corrosion Induced Bonding within SRVs ML20210E6211999-07-22022 July 1999 Submits Rev to non-limiting Licensing Basis LOCA Peak Clad Temps (Pcts) for Limerick Generating Station (Lgs),Units 1 & 2 & Pbaps,Units 2 & 3 ML20216D3081999-07-19019 July 1999 Requests Renewal of OLs for Listed Individuals,Iaw 10CFR55.57.NRC Forms 398 & 396,encl for Applicants.Without Encl ML20216D8041999-07-19019 July 1999 Submits Summary of Final PECO Nuclear Actions Taken to Resolve Scram Solenoid Pilot Valve Issues Identified in Info Notice 96-007 05000352/LER-1999-006, Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error1999-07-12012 July 1999 Forwards LER 99-006-00 Re 990614 Discovery That Grab Sample of Plant Offgas Sys Was Not Obtained within Time Limit Required by TS 3.3.7.12,Action 110 Due to Personnel Error ML20209F6341999-07-0909 July 1999 Submits Supplemental Response to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs, for Unit 2.Rev 0 to 1H61R & GE-NE-B13-02010-33NP Repts & Revised Pages to Summary Rept Previously Submitted,Encl ML20209G9121999-07-0909 July 1999 Informs That Ja Hutton Has Been Appointed Director,Licensing for PECO Nuclear,Effective 990715.Previous Correspondence Addressed to Gd Edwards Should Now Be Sent to Ja Hutton ML20209C9041999-07-0808 July 1999 Forwards Monthly Operating Repts for June 1999 for Limerick Generating Station,Units 1 & 2 & Revised Monthly Repts for May 1999 ML20210B4441999-07-0808 July 1999 Forwards Preliminary NRC Form 398 & NRC Form 396 for Reactor Operator for License Candidate LB Mchugh.Candidate Failed Category B Portion of Operating Exam Given at LGS During Week of 990315.Tentative re-exam Has Been Scheduled 990812 05000353/LER-1999-003, Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure1999-07-0707 July 1999 Forwards LER 99-003-00,re Bypass of RW Cleanup Leak Detection Sys Isolation Function on Three Separate Occasions.Bypass of Safety Function Was Caused by Inadequate Review & Approval of Change to Procedure ML20209D8821999-07-0707 July 1999 Submits Estimate of Number of Licensing Actions Expected to Be Submitted in Years 2000 & 2001,as Requested by Administrative Ltr 99-02.Renewal Applications for PBAPS, Units 2 & 3,will Be Submitted in Second Half of 2001 ML20209D2671999-07-0202 July 1999 Responds to NRC 990322 & 0420 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20196J6301999-07-0101 July 1999 Requests Addl Info Re Status of Decommissioning Funding for Limerick Generating Station,Units 1 & 2,Peach Bottom Atomic Power Station,Units 1,2 & 3 & Salem Nuclear Generating Station,Units 1 & 2 05000352/LER-1999-004, Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys1999-07-0101 July 1999 Forwards LER 99-004-00,re Inoperability of Automatic Depressurization Sys Portion of Eccs.Condition Resulted from Incomplete Impact Review of Isolating Portion of ADS Nitrogen Backup Supply on Operability of ECCS Sys ML20209B7001999-06-30030 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants ML20212J5401999-06-28028 June 1999 Discusses Completion of Licensing Action for NRC Bulletin 96-003, Potential Plugging of ECC Suction Strainers by Debris in Bwrs. Bulletin Closed for Unit 2 by NRC ML20207H8271999-06-24024 June 1999 Informs NRC That Util Has Completed Core Shroud Insps for LGS Unit 2.Proprietary Rept GE-NE-B13-02010-33P & non-proprietary Rev 0 to 1H61R,encl.Proprietary Rept Withheld,Per 10CFR2.790(a)(4) ML20196G7041999-06-24024 June 1999 Forwards Insp Repts 50-352/99-03 & 50-353/99-03 on 990413- 0524.No Violations Noted.Nrc Concluded That Licensee Staff Continued to Operate Both Units Safely ML20196A5641999-06-15015 June 1999 Provides Info Re Util Use of Four Previously Irradiated LGS, Unit 1,GE11 Assemblies in Unit 2 Cycle 6.Encl 990518 GE Ltr Provides Objective of Lead Use Assemblies Program & Outlines Kinds of Measurements That Will Be Made on Assemblies ML20195J6831999-06-11011 June 1999 Provides Proprietary Objectives for Lgs,Units 1 & 2,1999 Emergency Preparedness Exercise Scheduled to Be Conducted on 990914.Licensee Identifies Which Individuals Should Receive Copies of Info.Proprietary Info Withheld 1999-09-09
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062G4531990-11-20020 November 1990 Forwards SE Supporting Util Actions to Address Indication in Reactor Vessel Recirculation Riser nozzle-to-safe End Weld ML20062G4021990-11-19019 November 1990 Forwards Safety Insp Repts 50-352/90-21 & 50-353/90-20 on 900827-31.No Violations Noted ML20062F1771990-11-13013 November 1990 Confirms Dates of 901126-30 for NRC Equipment Qualification Insp of Facility ML20058F1981990-11-0505 November 1990 Advises That 901002 Response to Generic Ltr (GL) 90-03, Relaxation of Staff Position in GL 83-28,Item 2.2 Part 2, 'Vendor Interface for Safety-Related Components,' Acceptable ML20058E6121990-10-29029 October 1990 Forwards Radiological Safety Insp Repts 50-352/90-24 & 50-353/90-23 on 901001-05.No Violations Noted ML20058D2371990-10-26026 October 1990 Informs of Impending fitness-for-duty Program Insp & Requests 10CFR26.20 Required Policies & Procedures ML20058C1331990-10-23023 October 1990 Advises That Reactor Operator & Senior Reactor Operator Licensing Exams Scheduled for Wk of 910121 & Requalification Program Evaluation Scheduled for Wks of 910114 & 21.Ref Matl Listed on Encl Should Be Provided by 901029 ML20058A6241990-10-18018 October 1990 Forwards Insp Repts 50-352/90-22 &50-353/90-21 on 900912-19. No Violations Noted ML20062B7891990-10-12012 October 1990 Forwards Safety Insp Repts 50-352/90-20 & 50-353/90-19 on 900813-0916.No Violations Noted ML20059N5841990-10-0303 October 1990 Informs That Issuance of Senior Reactor Operator Licenses, for Fuel Handling Only,For More than One Facility Conditionally Acceptable IR 05000352/19900801990-09-28028 September 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-352/90-80 & 50-353/90-80.Requests Status of Planned Revs to Procedures & Expected Completion Dates in 910130 Response ML20059F6561990-08-29029 August 1990 Forwards Notice of Withdrawal of 900516 Application for Amend to License NPF-39,revising Tech Specs to Allow one- Time Extension of Visual Insp Period for Three Small Inaccessible Snubbers in Drywell ML20058N0531990-08-0606 August 1990 Discusses Licensee Engineering Initiatives.Encourages Initiation of Initiative Similar to Region V Licensees Establishment of Engineering Managers Forum ML20058M5981990-08-0303 August 1990 Forwards Safety Insp Repts 50-352/90-17 & 50-353/90-16 on 900522-0701 & Notice of Violation.Inspectors Continued to Note Problems W/Procedure Compliance & in Technical Adequacy & Implementation of Procedures ML20058M3311990-08-0303 August 1990 Forwards Radiological Safety Insp Repts 50-352/90-19 & 50-353/90-18 on 900709-13.No Violations Noted.Weakness Observed in Maint of Station Health Physics Procedures ML20055E8641990-07-10010 July 1990 Comments on Util 891228 Response to Generic Ltr (GL) 89-10, Safety-Related Motor-Operated Valve (MOV) Testing & Surveillance. Requests Proposed Schedule for Completion of GL Program Along W/Justification for Alternative Schedule ML20055F5591990-07-0303 July 1990 Forwards Safety Insp Repts 50-352/90-80 & 50-353/90-80 on 900521-25.Plant Transient Response Implementing Plan (Trip) Technically Acceptable.Unresolved Items Noted.Impact of Insp Findings on Peach Bottom Trip Procedures Should Be Reviewed ML20059M8671990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20058K1961990-05-31031 May 1990 Forwards Results & Conclusions of Regulatory Effectiveness Review on 900507-11.Encl Withheld (Ref 10CFR73.21) ML20055C3091990-02-14014 February 1990 Forwards Safety Insp Repts 50-352/90-03 & 50-353/90-03 on 900116-19.No Violations Noted ML20248E7421989-09-27027 September 1989 Forwards Exam Repts 50-352/89-13OL & 50-353/89-22OL Administered on 890612-16 & 19.NRC Concerned About Effectiveness of Util Candidate Screening & Evaluation Process That Permitted Marginal Individual for NRC Exam ML20248G6601989-09-27027 September 1989 Forwards Operational Readiness Insp Rept 50-353/89-81 on 890730-0804 & Notice of Violation ML20248E5181989-09-22022 September 1989 Forwards Safety Insp Repts 50-352/89-15 & 50-353/89-24 on 890626-0730.No Violations Noted.Repts Delineate NRC Concerns Identified During mid-cycle SALP Review & Licensee self-assessment of Conduct of Operations ML20248G9611989-09-21021 September 1989 Forwards Amend 7 to Indemnity Agreement B-101,reflecting Increase in Primary Layer of Liability Insurance.Amends Conform to Changes Made to Price-Anderson Act Enacted on 880820 NUREG-1376, Forwards Tech Specs,NUREG-1376 & Sser 9 Re Application for OL for Facility.W/O Encls1989-09-11011 September 1989 Forwards Tech Specs,NUREG-1376 & Sser 9 Re Application for OL for Facility.W/O Encls ML20247N2331989-09-0808 September 1989 Forwards Insp Repts 50-352/89-17 & 50-353/89-25 on 890724-27.No Violations Noted.Corrective Actions Re Failure of Operators to Properly Classify Events Effective ML20247E7991989-09-0606 September 1989 Forwards Safety Insp Rept 50-352/89-16 on 890807-11.No Violations Noted ML20246D5641989-08-23023 August 1989 Forwards Corrective Action Insp Rept 50-353/89-201 During Wk of 890424 Re Independent Design Assessment.Assessment Provided Needed Addl Assurance That Plant Design Met Licensing Commitments ML20246N4111989-08-15015 August 1989 Forwards FEMA Rept on 890614 Plant Remedial Exercise.Rept Indicates That Deficiency Identified in Lower Pottsgrove Township During 880405 full-participation Exercise.Offsite Preparedness Adequate ML20245K0161989-08-11011 August 1989 Advises That 890403 Response to Generic Ltr 83-28,Item 2.1 Parts 1 & 2 Acceptable ML20245G1511989-08-10010 August 1989 Discusses Emergency Preparedness Insp Repts 50-352/89-11 & 50-353/89-17 on 890522-26 & 0607 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of 75,000 ML20245J8171989-08-0909 August 1989 Advises That Listed Schedule Should Be Used for All Emergency Exercises,Including Submittal & Review of Objectives & Scenario Packages Prior to Exercise ML20245H7151989-08-0909 August 1989 Discusses Insp Rept 50-352/89-14 on 890629 & Forwards Notice of Violation.Insp Reviewed Circumstances Involving Transport of Contaminated Waste from Unit to Quadrex Recycle Ctr in Oak Ridge,Tn on 890620 ML20245G6721989-08-0808 August 1989 Forwards Environ Assessment & Finding of No Significant Impact Re Request for Exemption from 10CFR50.44(c)(3)(i) to Extend Permitted Time of Operation W/Noninerted Containment Until Completion of 100 H Warranty Run ML20248C3571989-07-31031 July 1989 Forwards Request for Addl Info Re Consideration of Severe Accident Mitigation Design Alternatives.Response Requested within 30 Days of Ltr Receipt ML20248D8901989-07-28028 July 1989 Forwards Safety Insp Repts 50-352/89-12 & 50-353/89-19 on 890529-0625 & Notice of Violation.Fire Protection Issues, Discussed in Section 3.1,may Represent Potential Enforcement Issues NUREG-1371, Forwards Tech Specs,NUREG-1371,issued by NRR Re Application for Ol.W/O Stated Encl1989-07-25025 July 1989 Forwards Tech Specs,NUREG-1371,issued by NRR Re Application for Ol.W/O Stated Encl ML20247N4761989-07-25025 July 1989 Forwards Enforcement Conference Rept 50-352/89-14 on 890717. Apparent Violation Noted in Insp Rept 50-352/89-14 Re Area of Transportation of Radioactive Matl Discussed ML20246N1801989-07-13013 July 1989 Forwards Preoperational Insp Rept 50-353/89-20 on 890530- 0621.Programs Adequate to Support Testing & Startup ML20246N4171989-07-12012 July 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-352/89-80 & 50-353/89-80 ML20246K5461989-07-11011 July 1989 Forwards Reactive Safety Insp Rept 50-352/89-14 on 890629. Violations Noted.Concern Expressed Re Lack of Control in Area of Properly Packaging Matl to Ensure External Radiation Levels Mantained.Enforcement Conference Scheduled ML20246G2921989-07-0707 July 1989 Forwards Safety Insp Rept 50-353/89-21 on 890530-0602.No Violations Noted ML20246F5911989-07-0606 July 1989 Forwards to Ecology Ctr of Southern California Re Petition to Fix or Close All Nuclear Power Reactors Designed by Ge.Ltr Ack Receipt of Petition Filed by Ecology Ctr & States Petition Filed Under 10CFR2.206 NUREG-1360, Forwards Tech Specs,NUREG-1360 & Sser 8 Re Application for OL for Unit 2.W/o Encl1989-07-0303 July 1989 Forwards Tech Specs,NUREG-1360 & Sser 8 Re Application for OL for Unit 2.W/o Encl ML20246B6061989-06-27027 June 1989 Ack Receipt of Re Alleged Discrimination Against Employee for Engaging in Protected Activities.Nrc Considers Matter Closed by Review of Info ML20245F0401989-06-22022 June 1989 Forwards License NPF-83 Authorizing Fuel Loading & Precriticality Testing of Util & Fr Notice.Amend 4 to Indemnity Agreement B-101 Also Encl ML20245H6901989-06-21021 June 1989 Forwards Safety Insp Repts 50-352/89-11 & 50-353/89-17 on 890522-26 & 0607.Violations Noted.Enforcement Conference Will Be Held on 890705 to Discuss Operators Inability to Properly Classify Certain Events During walk-through Exams ML20245F2941989-06-20020 June 1989 Approves Util 880621 Power Ascension Test Program for Facility,Per Reg Guide 1.68,for Execution ML20245E6141989-06-20020 June 1989 Forwards SER Accepting Util 890331 & 0602 Responses to NRC Bulletin 88-005, Nonconforming Matls Supplied by Piping Supplies,Inc at Folsom,Nj & West Jersey Mfg Co at Williamstown,Nj ML20245F2991989-06-16016 June 1989 Forwards Safety Insp Rept 50-353/89-23 on 890605-07.No Violations or Deviations Noted 1990-09-28
[Table view]Some use of "" in your query was not closed by a matching "". Category:OUTGOING CORRESPONDENCE
Some use of "" in your query was not closed by a matching "".
[Table view]Some use of "" in your query was not closed by a matching "". |
See also: IR 05000352/1990080
Text
yC
f 1., C *
h
,
'
, l
a m/" m 0 3 1990-
,
s
l Docket Nos. 50-352
SC-353
'
Phil'adelphia> Electric Company
ATTH: :Mr. D..M; Smith
- .
Senior Vice President -
N Nuclear-
o Nuclear Group Headquarters
Correspondence Control Desk
-
..
P. 0.. Box 195
>
.
' Gentlemen:-
1
- SUBJECT: TRANSIENT RESPONSE IMPLEMENTING PLAN (TRIP) PROCEDURES. INSPECTION-
REPORT-NOS. 50-352/90-80 and 50-353/90-80
'
'This refers to the special safety inspection ~ conducted by an NRC Inspection
~
p Team on May 21-- 25,-1990,'of activities at the Limerick Generating Station
-
. Units 1 and:2,'and to-the discussion of our finoings with Mr. G. Leitch and'
' Ji - other = members of, your staff at the conclusion of the inspection.
l , 1The' purposes'of;th'e: ins tion were to verify that the Transient Response -
.<.
>
Implementing Plan (TRIP; procedures are technically: correct, that the TRIP.
,
, procedures can be -physically carried out in'the plant, and that the TRIP proce-
-
'dures can'be-implemanted by the plant staff.
n
j ,
- The inspectioniconcluded the-Limerick. Generating Station TRIP procedures were-
% technically acceptable, that the TRIP procedures:can be physically. carried out-
?b lin the-plant and the operators can implement the TRIP _ procedures. 'However
'
1some findings were identified,
w.
- Your staff provided short term and long actions regarding the findings-.identifie'd
.darjng the course of the inspection. Within 30: days of receipt of this' letter,-
- :we request that you respond in writing with your short and long . term' actions
o relative' to the- unresolved items identified in- the' Executive Summary.
4
tWe. understand that PECo has an initiative to standardize the-Peach Bottom and-
Limerick TRIP procedure development process and writers guic't. As a result, we
'
,
'
request that you review the findings of this inspection to determine if. they
o l affect the Peach Bottom TRIP procedures,
m
In.accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
g . letter'and the enclosures will be placed in the NRC Public Document Room.
,
'
9007180027. 900703
- ' PDR ADOCK 05000352
Q PDC
.
'l
y. . /
4 ,
.
..
p7
-
y _
n;
8
.
.[ %, . . x ,
64 .
'
'
y ,LPhiladelphia Electric Co,-- 2'
g ,
,
.The response requested'by this letter is not subject to the clearance proce-
K
'
- dures of the Office of Management and Budget as required by_the paperwork
', reduction act of 1980, Public Law No.96-511.
Should you'have-any questions,- please contact Mr. R. Conte, Chief, BWR-Section,-
at (215) 337-5210. ,
't
,
Sii.cerely,
,
q
'
. Original Signed BY)
t
..J
,
'
, Robert M.:Gallo, Chief y
, Operations Branch
..'"
Division of Reactor Safety- t
f Enclosure: -Combined Report No. 50-352/90-80 and 50-353/90-80
- cc w/ enc 1: :
's. 'R'.LJ. Lees, Chairman, Nuclear' Review Board '
,
G. M. -Leitch, Vice President - Limerick Generating Staticii
D. R..Helwig, Vice President of Nuclear Engineering and Services
J. W.; Durham,'- Sr. , Vice President and General Council - ,j
M. J. McCormick, Jr., Manager . Limerick Generating Station j
> G.( A.f Hunger,. Jr. , Director - Licensing Section 1
LJ. Doering, Project. Manager - Limerick Generating Station
4J. : F.: 0'Rourke,- Manager - Limerick Quality Division -
t T. B. : Conner,LJr. .. Esquire -
G.'. J. Madsen, Regulatory Engineer - Limerick Generating Station :>
- G. ' Bethke i.. COMEX ~
, B.' Paramore.,. SAIC :
. ' ' 1Public;Dccument Room (PDR)
. Local Public-Document Room (LPDR)
- Nuclear Safety. Information Center (NSIC) 3
, .NRC' Resident Inspector. o
Commonwealth of Pennsylvania l .;
~bec:w/ Executive Summary Only:
W. Kane,:DRP
- J.-Wiggins~, DRP
W.- Hodges, DRS
.* EJ.-Durr, DRS
'
P. Gallo, DRS.
.
-
M.:Knapp, DRSS
-J.LLyash,' SRI-Peach Bottom
4
, T.~ Kenny,fSRI-Limerick
B.:Norris, PI.- Shoreham
W. Butler; NRR '
0FFICIAL RECORD COPY FLOREK6/14/90 - 0001.1.0
07/02/90
>
>
.]
.!
p, -
y~
p, ;_ .v,
,
- -
!;j;
y ..
' , , ;4.-c ..-l
,
-
'
,
-
t : * c '* - . . .
ye !' . Philadelphia Electric Co. 3:
G. 1,
. , .
bec w/ enc 1:-
.
Region I: Docket Room.(with concurrences)
p Manageme~ntAssistant',DRMA(w/o' enc 1)
R. Blough, DRP i
. . P; Kaufman'-DRP , !
. L. Doerflein, DRP- $
, ~ M.'. Miller, SLO. '
l
-
.
'
--J. Caldwell, EDO- -;
R. Clark,'NRR ,
- , ; R. Bellamy,=DRSS
.
!
- -0. Florek,~ DRS. ,
- .
t
DRS Files-(5)- ,
'
.-
e
l
- ]
t
,
, \
l
- .;
- a
!
.
.,
-i
1
1
>;
') I b
l
>
/ ,
i- DR ;Ri DRS:RI RI-
. F1r6k/ p}jk.
-
Con / Ga lo t
'-
/p/90 07/'[,fE0 07h90 (
,
,
,
0FFICIAL RECORD COPY FLOREK6/14/90 - 0003.0.0 '
-
07/02/90 '
\ f
'
..