MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20211G1341999-08-24024 August 1999 Proposed Tech Specs Replacement Pages,Incorporating Addl Info for Pending TS Change ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210D4331999-07-31031 July 1999 Material Recovery Plan, for Haddam Neck Plant ML20210F5121999-07-28028 July 1999 Rev 0 to CY-HP-0031,Haddam Neck Plant Health Physics Dept Technical Support Document, Bounding Dose Assessment for Offsite Radioactive Matls ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20195C8591999-06-0303 June 1999 Proposed Tech Specs Incorporating Changes Which Reflect Limitations & Requirements Appropriate to Present Configuration of Plant ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199K4861999-01-18018 January 1999 Proposed Tech Specs to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TSs to TRM ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20210D4331999-07-31031 July 1999 Material Recovery Plan, for Haddam Neck Plant ML20210F5121999-07-28028 July 1999 Rev 0 to CY-HP-0031,Haddam Neck Plant Health Physics Dept Technical Support Document, Bounding Dose Assessment for Offsite Radioactive Matls ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20154G5311998-10-0707 October 1998 Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review ML20154G5521998-10-0606 October 1998 Rev 5 to Project Instruction PI-01, Svsr Implementation Checklists & Workbook ML20154G5391998-10-0606 October 1998 Rev 6 to Project Procedure PP-07, Discrepancy Repts ML20154G5351998-10-0606 October 1998 Rev 3 to Project Procedure PP-04, Regulatory Review Procedure ML20154G5251998-10-0505 October 1998 Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan ML20154A7401998-09-24024 September 1998 Spent Fuel Pool Cooling & Makeup Monitoring Program ML20236Q9341998-06-30030 June 1998 Rev 4 to PI-01, Sys Vertical Slice Review Implementation Checklists & Workbook ML20236Q9321998-06-25025 June 1998 Rev 4 to PP-01, Sys Vertical Slice Review ML20153C6221998-06-18018 June 1998 Rev 1 to CP 3804L, PASS Containment Air Sample ML20153C6171998-06-18018 June 1998 Rev 2 to CP 3804K, PASS Rcs/Rss Sample ML20249B7841998-06-12012 June 1998 Rev 1 to CY-HP-0025,HNP Health Physics Dept Technical Support Document, Background Cs-137 Concentration in Soil ML20153C6291998-05-31031 May 1998 Rev 0,Change 1 to CP 3804M, PASS Ventilation Samples ML20247Q6901998-05-20020 May 1998 Rev 1 to Epop 4475A, External Resources Coordinator ML20247Q6771998-05-20020 May 1998 Rev 1 to Epop 4428I, Direction of Posl Field Sampling ML20247Q6671998-05-20020 May 1998 Rev 1 to Epop 4422A, Thermal Hydraulic Evaluation Methods ML20247R8081998-05-20020 May 1998 Rev 1 to Epop 4455F, Rumor & Inquiry Control ML20247R7921998-05-20020 May 1998 Rev 1 to Epop 4455D, News Releases ML20247Q7011998-05-20020 May 1998 Rev 1 to Epop 4490, Implementation of Recovery Operations ML20247R7491998-05-20020 May 1998 Rev 1 to Epop 4455, Manager of Public Info ML20247R7541998-05-20020 May 1998 Rev 1 to Epop 4455A, Nuclear News Manager ML20247R7851998-05-20020 May 1998 Rev 1 to Epop 4455C, Technical Assistant ML20216B1791998-05-0808 May 1998 Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary ML20247Q6491998-05-0707 May 1998 Revised Nuclear Emergency Planning Operating Procedure Index ML20217Q9101998-04-30030 April 1998 Matl Recovery Plan ML20247H4581998-04-0909 April 1998 Rev 19 to EOP 35 E-0, Reactor Trip or Safety Injection B17159, Backlog Mgt Plan for Unit 31998-03-31031 March 1998 Backlog Mgt Plan for Unit 3 ML20216K0641998-03-20020 March 1998 Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program ML20216H7101998-03-13013 March 1998 Independent Corrective Action Verification Program Status Rept ML20216H7191998-03-0303 March 1998 Independent Corrective Action Verification Program Status Rept 1999-07-31
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ .
- RPV Spray Cooling 50P 573 Page 1 .
Rev. 2 i
Unit 1 i
i RPV Spray Cooling Emergency Pro'cedure PAGE NO. EFF. REV.
1-2 .
2 i 2a,2b 2 E1*J osJtcTivts Enter few E0P 576 "Level testeration' stee 3.8.2 .
o Open All APR Velves Ensure ?.he RPV is enerossweized u
opereu con serey Free The Estenlish the serey sees of core IWppreslion Peel' SeeIIR$
O . v see sto 'aPv L.,e1 centret" wnen level resurge
References:
- 1) Emergency Procedure Guidelines, Millstone Unit One
- 2) Emergency Procedure Guidelines Appendix B
- 3) Emergency Procedure Guidelines, Appendix C
- 4) ACP-QA-3.02, Attachment A O
y P d; iPV . pray .co t ing h
P
i i
RPV Spo y Cooling E0P 573 PU;e 2b '
Rev. 2 4
Figure lc
_.-2 + 2 : i: _= = m = = w a_ :;1 n .= -
- _ _[ = = _=== . - ;- 5-- .
250 w 4=_1+=n==## .-==-r-
= I S P S I G = === =r_. =-= =- ==- =- _ - r -
= # = =*== CO R E=*===~======-
.-_.= = - _ = = = = - - - - - , 1 c _. _=
= = - -
0 =_ -
- . . . _ = = = _ - .- --===:.=._=---..
.=. - = =t._:. -
- .- = =- .
,a E10 E. SJG _=; . . - .--;
_ - _ _ _ = * - - - - __.- =.--
- = M1_tOO~4 ~=
y 200 !E
=_EES .
$5~--- =- "~=Ei4G3 "" - 5R=~= ,=""=_._ + -C6Mi1CM.-d--
= = = . = - = . . . _ _ - ---.:=_.
-- - = = . - _ = - - - -u-= -==-=
r == r :- == = _ = = = = -
h M P_SIG i - " 7 ~21 = i _.2- M r # =i " -Z J F _ M =_ a = =:
2;E a z= T;; _ x = t ==s = ====_=im; t=a :: = us=== - =;
~
.g
~
.- ~~
.-.2=_-______.___..___.____:,.=e_._=_.______
o _ _._ _____. .
_ _ _ _ _ . . _ . _ .t-_.__ . _ . _ , = _ _ _ , _ _ .
=:- r= ______-:_=.:____._.
o : = = -: = =_ 2_ u - _.u___-_=___-__
. _ _=_t _ _ _ . _
a E===r-~rs=
=.7_=--_.__=-- .r_- 17== :==:== _=, E- z=1 ==r= . =r1_ .n __ =_1. - _n _ _=: _.. . . _
c ============:----===-__.=\.=_.J___._=.__- w .__ -._=_._-
O 100 = ---- 3== - - n --- :
~ --------~-------E======:
imE=n =:;=-- \ .=m2 = == = = = - _-
-I m
m "E 5= ===F === == =: ==== =_: =-- -- == _1 == =_==~__- - - - _=.
g_ _ _.= =3 ___3y:5= := = = == w.- - ; = = : = =_ _= ._t _ === = == - --_._----:
o -
u ~=-r=-=-==_
==__....__--_.:=__--2=_==----==-=-------- ==-:=. -- -_ = = - . _ _ a ---_.__
z = +-
n___=___..:_n_==--=-m=----==:=-----_._==_==____=_-- ===.=_.=---;-----------. -
v--===-
p a : .___
50 r= = = 2 - = +; - - =L=- - : =.-
--t_= - - = = - - - - - -
m -r - .___ _ :- - = = :===.
---*------~----b-----r===---
1050 20b0 3000 4000 SbOO 6000 Flow Rate (GPM)
NPSH Requirements for Core Spray Pumps F i_g ure ld
_; _:== = --+.=r==.==__.___-,--_~
_ _ ___ r===,.r- _ - ___t_c3_. =--= ==_=__ - .t=___. _. _ -' _
= =:__=__2___:
30 3_ ---._-r-_-____r_,.-_.-_-._-._--___..._ -
._m___g__,.___ _ . _ - _q_- ---
g
=y p_=..__-___.
. _ q3 _ --
z__
__w_.___
______4_
_a__.;___
o_ LJ - 1
__ .-.___ 4 h- -._ m p g g g _7_ ;
a ~.y'1.
E
=_- 10. .$_1G.__ ___ . _ _ -_ -
p --
e 200 - ; ;$ P.S tGr---2n _ _ ._ % _ ___:__
r 2 = =1 - == =- I :!'=--:=C. C. _h.Db. ION _a_-
u - -
- -=
==3- --_;__==;=.= m-g .=_ ,: : :.;c_ =_ =_1t----
- ==_;_p---- i_ -*=---i-- ____ __ ._ ;= :: c_
a :_:-- =:=. . _ _-i: =_. . - - - - - -- : ===
m . =c t .- *E=. == =u==:-:=3===
._=_O^ _
- g
,n =_ _f. SW-- m- 1_;_;. yp.-.__. _-. = . +__t _ _ ._._ _dp = ___
- - - -2__,___g_ =__ _;_1_
7 r=
g ,1 J w =rrtm=-- +- -+---- - ;__ i__.__.. _s - - tn
. . _;=_=_.-*=-
n ==},=._=._.-..
-~~------$ , _ . _ _ .
- . + n - _ . - . - . , _y- - _ _ _ . _ _
~.
g -y_-
O ___2____ ___..______- -
=-t - _
A cz~ i=_=r ;
- = :-E- J---_T- i=== - N_ _ ~. .___ -==_ _ :-- =__- c:=: - ==E c =- _= -- : - : 3 _==t :_- __=__:= ._ w=a_=_=_.__2_=_=_ =_.=._=. __ :- _
=:_ _-- = tr(=q=_;;:=.__:
. _;_ -_ _:.==_=::.==,_ : = =_.-
C - . . - f- . _. g +._.-- - -_- _..__=-. ---._ w 1 100 _. ._.
== CZ =3=3
_ =r:== ;=== f r===u =Ei== ~52Z ~ E = EM" "-~~M .--_-- _ . : --- -- - .- . . .=_ . . ~
==E==~=====~=;
~
=: - -_:
m t-- m --- .=.m=.=== ! ==== ::_=_=_ c:. =. =a _-=, ==. =_ u. =: = r t
c u, , -
r---
....__.___._c_m=_____==.=..-
=._ ,.. _=_ =_ y _.____._ t _ _ . . __ _. . _.= t__ __ __ . _ _ . . __:_ _=_:=___=_u _ _ =_ _ _ ._
" =
a =- :w=: : == =-t=-_=:= q =_ =.==_=.= :==-..===-...--==
= =r = . .= _ = :z - - - -- a -; _ z.-====;=. .=-= = _ t. : ==t==_.- v )
2 . _ _ r=---.. a _ =_=._.=..-
-- - .=. _r .: -- t _.=_ _.,. . -_=- 5 =- . -
m r., 0 - = : ==r.--- L _ -
v, -----v =. :==-===== - -
- - - - ~ - - -
====-:=---
1000 2000 3000 4dOO 5000 6'000 Flow Rate (GPM)
NPSH Requirements for LPCI Pumps E0P 573 RPV Sorcy Cooling
RPV Spray Cooling E0P 573 Page 2a I 1
Rev. 2
k ricure la m--- - -.n- __-f__ -- _ _ _ :2-_- =. :.?. : . r: :-:- .*.i: t ..n.-- -. n. un n _: .- ; : _: -- - -+ =. .i= t=__=-
. a. - - v. - . =_ : =:- , .c -; _.2._=:.--.___.
r -- i _
4 250 ._,______d__,_-:
== x :_
r ~0:E~' =T ~ =WE== +=: :: -t -
& = =3
- O
~ --c--_=x---
- -_--._-._==--.
- _"g.... --
.-a-.,_=.-- :: =.g_
_ _r-- - _ _ _ .
___,._; : m -
'---- I-_ _ _ _. - - - .-
. :Easco e,Tt:- T- - - r- n.-
c, g _ _- e- #_.._,._
. -- .d+ g -
g(ggg PSTs 1r 7 y -
._- _ __ g 200 p , - _.. ~ _ __
i
_a v_- =t - , ~_ _._.: --
w =_- -
,_a -
s ___ .=2.___.
--.. m r_ ___
y =. __ - .
_w. _ e_ y g .
g _
z______,_.___ _ ___. _
3 ____.
_ ___ _m __ _-____ \___4, _
T__ ___-
-4 - m
^
.4_.. ._%
__~
-W g wa --*-
-t w - . _ _ - j a, - ===. --- :
- .,. _r _ .___ _ .
~
e *E91--_ 2 - _ :-~ ~ ~ J._-_6
,0 i00 _e -- _.
__=
- , _ _ _ _ _ ~
_ . - =.___._ g__ . _ _ = -.__._-.___y__
o __. _ _ _ . . .
U --- ;_ - - - -
w _ _ _ _ . ___--.- _: - --
c, _
Q.
D n-+ -
n 50 - =* - .
. a i 6 1000 2000 3000 4000 5000 6000 Flow Rate (GPM)
NPSH Requirements for Core Spray Pumps Fiougq_lb ; -
" "-_ . . ~ ==:
250 o,'_, _ __n _. --
- . = .=-o _ _
_ _ -.. ._ :=
EE >tiri , =-- -_
_wwrs_m awmm=-
wKwf. :
- g. -- =-
w g*.__
i
~
o != g yp__ _ _ _ __
_w . _ - -
F 200 ..- ..-
- -- -- x== ne --
t w m' '
3 tp3p_5)UT -- __
__ m
+:-s=.
g =-g -4h -.--. -- , -. -
_ -+-_.
._- ~,,- , - - .
150 _
- - -+ _-
. . . ~. . - -----.-- __.
g c, .
-_ . = . -
___2=__
--- r w c .
---=2
- =rE==r --*- --= :---
-r- =
o 2--
- 7. _ - _ " , _ . .:=c_. - -r =_=._=__j :sH_:= _2_: =..
a 100 P~ ~ ~ " .. _ - _ _ ' , ~ _.-._ ~~_ ~_ V _'_2=r= ==
..__-g_-~r_--_.
n
__________ _ _ . _=
==-L Er- ~~ ~ ~ ====%. A._ _ --*
,==== - -
t==
n . _ _ - _
-.r e=. =q=__ q__
u e, ._.- a:=ffr - _- . _
$_.__- f_ Q_ __- - =_i:__ = :=3 = =_ _. = 'E . .
a.
~~
2.'=~ : =_ E.EE- = =2Q. :~==T:-s k.,3E={= _-5.++-- = === L __ =;= i==
3
=
n 50 E==s-E
~~-
=,=_I==. _2:=__:_. r. *t=_ _~. 2 -EE~m"_ =_2= r- . <=2.-.t: -E=_==-- -4 r i i i i i l 1000 2000 3000 4000 5000 6000 Plow Rate (GPM)
NPSH Requirements for LPCI Pumps E0P 572 RPV Spray Cooling
~ .
. RPV Spray Cooling E0P 573 Page 2 Rev. 2 r
" I
- 1. PURPOSE t
The purpose of this procedure is to provide core cooling if RPV t, water level drops below -127" (TAF) when the vessel is !
depressurized. ;
- 2. ENTRY CONDITIONS [
t 2.1 Enter this procedure from E0P $76 "RPV Level Restoration", '
(stap 3.8.2), ,
- 3. OPERATOR ACTION CAUTION Observe NPSH requirements for pumps takino a suction from the s I
Suppression Pool. If it can be determ8.ied ;W i.:ywell pressure !
(CRP 925 PR 1602-9) did not exceed 10 r -;, at anytime, then use ;
the NPSH requirement curves for non '.0CA condition (see Figures i Ic ana Id, Page 2b), otherwise use che curves for LOCA conditien l (see Figures la and Ib, Page 2a) i t
CAUTION j O Cooldown rates greater than 100'F/hr may be required to accomplish the following step.
j
......................................c............................ !
[
3.1 Open all 4 APR valves, t
- 3. 2 IF not all of the APR valves can be opened, {
THEN ocen other SRV's until a total of 4 valves are open. !
3.3 Operate Core Spray subsystems with suction from the f Suppressico Pool. l 3.4 WHEN at least one Core Spray subsystem is operating with suction from the Suppression Pool AND RPV pressure is less than 90 psig, THEN terminate injection into the RPV from sources external to the Primary Containment. !
l 3.5 IF RPV water level is restored to -127" (TAF), l l
THEN GO TO E0P 570 "RPV Level Control" to monitor and control !
s RPV water level. !
RK:1fg !
FIN Al, !
ECP $72 2PV Soray Cocling [
l
STATION PROCEDURE COVE 2 SHEET A. IDENT^FICATION Number: E0P 573 Rev. 2
Title:
RPV SPRAY COOLING EMERGENCY PROCEDURE Prepared By: R. KRAEMER
- 8. REVIEW I have reviewed the above procedure and have found it to be satisfactory.
TITLE SIGNATURE DATE DEPARTMENT HEAD d.).h U hjo/gg
_ . h.%$ms 4 - --
$YA1 s
-- bu/Nh- ~
r f C. SPECIFIC UNREVIEWED SAFETY QUESTION EVALUATION REQUIRED:
Modifies intent of procedure and changes operation of systems as described in design dacuments. YES ( ) N3M_ j (If yes, perform written USQ determination and Safety Evaluation, and contact Manager, Safety Analysis Branch to determine need for Integrated Safety Evaluation.)
ENVIRONMENTAL REVIEV REQUIRED (Adverse environmental impact) YES ( ) NO ( #
- 0. SPECIFIC SAFETY EVALUATION REQUIRED A7)ects response of safety systecs, performance of systems which .nay have been credited in the safetv analysis or non-credited systems which may indirectly affact safety system response. YES [ NO ( )
(If yes, perform written Safety Evaluation and contact Manager, Safety Analysis Branch to determine need for Integrated Safety Evaluation.)
E. !NTEGRATED SAFETY EVALUATION REQUIRED YES d NO ( )
F. PROCEDURE REQUIRES PORC/50RC REVIEV (In addition to review, items with a YES response must be documented i: the PORC/SORC meeting minutes.) YES ( g NO ( )
G. P0h/50RCAPPROVAL GRC Meeting Number /"N-W H. APPROVAL AND IMPLEMENTATION Ine cttached procedure is hereby approved, and effective on the date below:
d/ M StatJtm/iervice A) nit Superintendent rk hs Effdetive'0 ate SF301/9/s/SES/87-12/lof1