| Site | Start date | Title | Description |
---|
05000263/LER-2024-002-01, Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure | Monticello | 30 May 2025 | Low Pressure Coolant Injection Inoperable Due to Motor Valve Failure | |
ML25148A291 | Callaway | 28 May 2025 | Enclosure 1: Callaway Plant, Unit 1 - Revision (Supplement) to Request to ASME Code Relief Regarding 48-Hr Hold Time When Performing Repairs Using Ambient Temperature GTAW Temper Bead Method Per ASME Code Case N-638-11 (Relief Request 15R-0 | |
IR 05000220/2025001 | Nine Mile Point | 28 May 2025 | Reissued Integrated Inspection Report 05000220/2025001 and 05000410/2025001 | |
ML25142A387 | Callaway | 22 May 2025 | Relief Request I5R-01 | |
ML25140A461 | Callaway | 21 May 2025 | Draft Relief Request for a Teleconference on 5/21/25 | |
ML25098A179 | Dresden | 20 May 2025 | Audit Summary Report for LARs to Adopt TSTF-505, TSTF-591 and 10 CFR 50.69 | |
NL-25-0175, Response to Request for Additional Information Regarding Submittal of the Inservice Testing Program Alternative Requests and Relief Requests for Pumps and Valves - Sixth Ten-Year Interval | Hatch | 15 May 2025 | Response to Request for Additional Information Regarding Submittal of the Inservice Testing Program Alternative Requests and Relief Requests for Pumps and Valves - Sixth Ten-Year Interval | |
ML25129A077 | Grand Gulf | 13 May 2025 | Integrated Inspection Report 05000416.2025001 | |
IR 05000321/2025001 | Hatch | 13 May 2025 | Integrated Inspection Report 05000321/2025001 and 05000366/2025001 | |
IR 05000333/2025001 | FitzPatrick | 13 May 2025 | Integrated Inspection Report 05000333/2025001 | |