| Site | Start date | Title | Description |
---|
IR 05000461/2024003 | Clinton | 5 November 2024 | Integrated Inspection Report 05000461/2024003 | |
IR 05000298/2024003 | Cooper | 5 November 2024 | Integrated Inspection Report 05000298/2024003 | |
IR 05000277/2024003 | Peach Bottom | 4 November 2024 | Integrated Inspection Report 05000277/2024003 and 05000278/2024003 | |
IR 05000259/2024003 | Browns Ferry | 4 November 2024 | Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 | |
ML24306A191 | 07109374 | 1 November 2024 | Enclosure 2: Holtec Proposed CoC 71-9374 Revision 3 for the HI-STAR 80 Package | |
ML24151A384 | Limerick | 31 October 2024 | – Issuance of Amendment Nos. 264 and 226 Support to Digital Modernization Project Installation (EPID L-2023-LLA-0025) and Exemption from the Requirements of 10 CFR 50.62 | |
IR 05000321/2024003 | Hatch | 30 October 2024 | Edwin I Hatch, Units 1 and 2 - Integrated Inspection Report 05000321/2024003 and 05000366/2024003 | |
IR 05000440/2024003 | Perry 07200069 | 30 October 2024 | Integrated Inspection Report 05000440/2024003 and 07200069/2024001 | |
IR 05000237/2024003 | Dresden | 29 October 2024 | Integrated Inspection Report 05000237/2024003 and 05000249/2024003 | |
ML23335A013 | | 25 October 2024 | IMC 0308 Attachment 3 Appendix K, Technical Basis for Maintenance Risk Assessment and Risk Management Significance Determination Process | |