Text
f a
JUN 0 31980 NUMBER TTTIE REV. ISSUE /DATE FR S.1 RESPONSE TO NUCLEAR POWER Rev. 3 GENERATION / ATWS i
A.
PURPOSE This procedure provides actions to add negative reactivity to a core which is observed to be critical when expected to be shutdown.
B.
SYMPTOMS OR ENTRY CONDITIONS This procedure is entered from:
1.
E 0, REACTOR TRIP OR SAFETY INJECITON, Step 1, when reactor trip is not veriDed and manual trip is not effective.
2.
F 0.1, SUBCRITICALITY Critical Safety Function Status Tree,
on either a RED or ORANGE condition.
i l
Page 1 of 7 8010250203 ongoo7 DR ADock 0500021a p
a JUN 0 31986 NUMBER TIT U REV. ISSUE /DATE FR S.1 RESPONSE TO NUCLEAR POWER Rev.3 GENERATION / ATWS i
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED NOTE:
STEPS ONE THROUGH FIVE ARE IMMEDIATE ACTION STEPS.
1 VERIFY REACFOR TRIP:
- a. Push reactor trip button
- b. Check the following:
- b. Perform the following:
o Reactor trip breakers OPEN o Manually insert control rods.
o Neutron Dux - DECREASING o
All rod bottom lights - LIT o De-energize 480 V buses 4 and 7, by performing the following:
- 1. Open 480 V bus supply breakers 4841 and 4971.
- 2. Check open 480 V tie breakers 4T5 and 671.
2 VERIFY TURBINE TRIP:
- a. Push turbine tria button
- b. Check both tur sine trip valves -
- b. Manually run back turbine.
CLOSED IE turbine can b'QIbe run back.
THEN close all four main steam line trip valves.
3 VERIFY FW PUMP RUNNING:
- a. Check at least one main feedwater
- a. Check AUTO AUX feedwater pump - RUNNING actuated.
IE b'QI actuated.
THEN manually stan auxiliary feedwater pumps.
- b. Open all four feedwater bypass valves
- c. Establish total auxiliary feedwater flow greater than 640 GPM Page 2 of 7
JUN 0 31986 NUMBER TTTIE REV. ISSUE /DATE FR S.1 RESPONSE TO NUCLEAR POWER Rev.3 GENERATION / ATWS STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 4
VERIFY REACTOR SUBCRmCAL:
- a. Check power range channels -
- a. QQIQ Step 5.
LESS THAN 5 %
- b. Check intermediate range
- b. QQIQ Step 5.
start up rate -
NEGATIVE
- c. Restore 480 V buses 4 and 7 by perform the following:
- 1. Close 480 V supply breakers:
o 4841 and 4971 QR o 4T5 and 6T7
- 2. Reset 480 V lockout relays:
o 27Y-4 and 27Y-4B for bus 4 o 27Y-7 and 27Y-7B for bus 7
- 3. Close MCC supply breakers as necessary
- 4. Stan service water and component cooling water pumps as necessary
- d. RERJRNIQ procedure and step in effect Page 3 of 7 l
JUN 0 31988 NUMBER Tnu REV. ISSUE /DATE F R.S.1 RESPONSE TO NUCLEAR POWER Rev. 3 GENERATION / ATWS STEP ACTION /EXPECED RESPONSE RESPONSE NOT OBTAINED 5
INITIATE EMERGENCY BORATION OF RCS:
- a. Emergency borate using charging pump:
- 1. Align boration flow path:
- 1. E boration flow path EQI aligned.
TEEN Q. IQ Step 5 b.
Q
- a. Open BA MOV-366, boric acid to charging pump suction
- 2. Check running QR st.ut a charging
- 2. E no charging pum available, pump by"taking control switch to THEN QQIQ Ste 5 b.
the "Trip then to the "Stan" position
- 3. Stan one boric acid pump
- 3. E no boric acid pump available.
THEN QQIQ Step 5 b.
- 4. QQIQ Step 5 e
- b. Emergency borate using metering pump:
- 1. Open BA MOV 349, metering pump suction from BAMT
- 3. Stan metering pump
- 4. Increase pump speed to maximum
- c. Align charging flow path:
JUN 0 31988 NUhGER TTT12 REV. ISSUE /DATE FR S.1 RESPONSE TO NUCLEAR POWER Rev.3 GENERATION / ATWS I
STEP ACTION / EXPECTED RESPONSE RESPONbh NOT OBTAINED 5
- d. Check PRZR pressure -
IE E0Iopen.
THEN manually open PORVs and block valves.
WHEN PRZR pressure is less than 2150 PSIG, THEN close PORVs and block valves.
- c. Adjust letdown flow as necessary to maintain PRZR !cvel 6
CHECK THE FOLLOWING TRIPS HAVE OCCURRED:
- a. Reactor trip
- a. Dispatch an operator to locally trip reactor trip breake s.
- b. Turbine trip
- b. Dispatch an operator to locally trip turbine.
7 VERIFY FEEDWATER FLOW MANUALLY START PUMPS AND GREATER THAN 640 GPM ALIGN VALVES AS NECESSARY.
8 VERIFY ALL DILUTION PATHS ISOLA 17.D:
- a. Check primary water to blender-
- a. Isolate prinury water to blender.
ISOLATED
- b. Check primary water to charging
- b. Lxally close BA V-367.
suction, BA V 367 -
ED i
l Page $ of 7
JUN 0 31988 NUMBER TTT12 REV. ISSUE /DATE FR S.1 RESPONSE TO NUCLEAR POWER Rev.3 GENERATION / ATWS
(
STEP ACT10N/EXPECIED RESPONSE RESPONSE NOT OBTAINED 9
CHECK FOR REACTIVITY IE UNCOVrROLLED COOLDOWN INSERTION FROM UNCONTROLLED NQIIN PROGRESS, RCS COOLDOWN:
THEN QQIQ STEP 13.
o Check RCS temperature -
DECREASING IN AN UNCONTROLLED MANhTR 2
o Check SG pressures-ANY DECREASING IN AN UNCONTROLLED MANbTR 10 CHECK MAIN STEAM LINE TRIP MANUALLY CLOSE MALN STEAM VALVES CLOSED LINE TRIP VALVES.
11 IDENTIFY FAULTED SG(s):
- a. Check pressures in all SGs:
- a. GQIQ Step 12.
o Any SG pn:ssure decreasing in an uncontrolled manner 2
o Any SG completely depressurized 12 ISOLATE FAULTED SG(s):
MANUALLY DE LOCALLYCLOSE VALVES AS NECESSARY.
o Isolate main feedline o Isolate AFW flow o isolate steam sup sly to atmospheric vent and terry turame Page 6 of 7
JUN 0 31985 NUMBER TITLE REV. ISSUE /DATE FR.S.1 RESPONSE TO NUCLEAR POWER Rev.3 GENERATION / ATWS STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAlhTD 13 VERIFY REACTOR SUBCRITICAL:
CONTINUE TO BORATE.
o Check power range channels -
IE BORATION EQI AVAILABLE, LESS THAN 5 %
THEN ALLOW THE RCS TO HEAT UP.
o Check intennediate range PERFORM ACTIONS OF ORIER start up rate -
FUNCTION RESTORATION NEGATIVE PROCEDURES IN EFFECT WHTCH DO NOT COOLDOWN OR OT11ERWISE ADD POSITIVE REACITVITY TO THE CORE.
RETURN I.Q STEP 4.
14 RESTORE 480 V BUSES 4 AND 7, PERFORM THE FOLLOWING:
- a. Close 480 V supply breakers 4841 and 4971
- b. Reset 480 V lockout relays:
o 27Y-4 and 27Y-4B for bus 4 o 27Y-7 and 27Y-7B for bus 7
- c. Close MCC supply breaken as necessary
- d. Start service water and component cooling water pumps as necessary NOTE:
BORATION SHOULD CONTINUE TO OBTAIN ADEQUATE SilUTDOWN ofARGIN DURING SUBSEQUENT ACTIONS.
15 RETURNIQ PROCEDURE AND STEP IN EFFECT END Page 7 of 7