MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20155B0331998-10-22022 October 1998 Proposed Tech Specs Changing TS 3.3.2.1, Instrumentation - ESFAS Instrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program ML20154G5311998-10-0707 October 1998 Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review ML20154G5391998-10-0606 October 1998 Rev 6 to Project Procedure PP-07, Discrepancy Repts ML20154G5351998-10-0606 October 1998 Rev 3 to Project Procedure PP-04, Regulatory Review Procedure ML20154G5521998-10-0606 October 1998 Rev 5 to Project Instruction PI-01, Svsr Implementation Checklists & Workbook ML20154G5251998-10-0505 October 1998 Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan ML20236Q9341998-06-30030 June 1998 Rev 4 to PI-01, Sys Vertical Slice Review Implementation Checklists & Workbook ML20236Q9321998-06-25025 June 1998 Rev 4 to PP-01, Sys Vertical Slice Review ML20153C6171998-06-18018 June 1998 Rev 2 to CP 3804K, PASS Rcs/Rss Sample ML20153C6221998-06-18018 June 1998 Rev 1 to CP 3804L, PASS Containment Air Sample ML20153C6291998-05-31031 May 1998 Rev 0,Change 1 to CP 3804M, PASS Ventilation Samples ML20247R7851998-05-20020 May 1998 Rev 1 to Epop 4455C, Technical Assistant ML20247Q7011998-05-20020 May 1998 Rev 1 to Epop 4490, Implementation of Recovery Operations ML20247R8081998-05-20020 May 1998 Rev 1 to Epop 4455F, Rumor & Inquiry Control ML20247Q6671998-05-20020 May 1998 Rev 1 to Epop 4422A, Thermal Hydraulic Evaluation Methods ML20247Q6901998-05-20020 May 1998 Rev 1 to Epop 4475A, External Resources Coordinator ML20247R7921998-05-20020 May 1998 Rev 1 to Epop 4455D, News Releases ML20247Q6771998-05-20020 May 1998 Rev 1 to Epop 4428I, Direction of Posl Field Sampling ML20247R7541998-05-20020 May 1998 Rev 1 to Epop 4455A, Nuclear News Manager ML20247R7491998-05-20020 May 1998 Rev 1 to Epop 4455, Manager of Public Info ML20216B1791998-05-0808 May 1998 Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary ML20247H4581998-04-0909 April 1998 Rev 19 to EOP 35 E-0, Reactor Trip or Safety Injection B17159, Backlog Mgt Plan for Unit 31998-03-31031 March 1998 Backlog Mgt Plan for Unit 3 ML20216K0641998-03-20020 March 1998 Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program ML20216H7101998-03-13013 March 1998 Independent Corrective Action Verification Program Status Rept ML20216H7191998-03-0303 March 1998 Independent Corrective Action Verification Program Status Rept ML20203F6931998-02-20020 February 1998 Rev 6 to PI-MP3-11, Discrepancy Rept Submittal & Closure ML20203E2131998-02-19019 February 1998 Cancelled Rev 26 to 1-OPS-10.11, Locked Valve List ML20203D4111998-02-18018 February 1998 Revised 1-OM-index Unit 1 Operations Dept OM Index & Rev 2 to OM 3.8, Millstone Unit 1 Operations Manual ML20203F6751998-02-16016 February 1998 Rev 2 to PI-MP3-07, Review of Accident Mitigation Systems ML20203F6601998-02-16016 February 1998 Rev 5 to Audit Plan for Independent Corrective Action Verification Program ML20216H7351998-02-11011 February 1998 Independent Corrective Action Verification Program Status Rept 1999-05-10
[Table view] |
Text
-
I i
MILLSTONE NUCLEAR POWER STATION EMERGENCY PLAN OPERATING PROCEDURE cy .m k_ (3 -s
,a vqc , nrmy m;y ml::.
33 vm,~& ,y , ,
p.
OP' N: HINK'7p- N 3' CT EVIEW ns y
,, e mr .
<y z;
- yr; ,
v:c;. 'a :,'
c-. r y
- .g?m e; ms.
r
,; e %
External Resources Coordinator EPOP 4475A Rev.1 O l 1
l I
l i
/,_ -
Approval: d,W y SORC Mtg. No: h@e9(a Date: heQS8 ~
Effective Date: <5 @ 4 9 l l
1 O' Level of Use SME: T. Dembek Information 4
~
9805200316 960520 PDR ADOCK 05000245 F PDR i
. - Millstone All Units O Emergency Plan Operating Procedure C
External Resources Coordinator TABLE OF CONTENTS
- 1. PURPOSE...................................................9
- 2. P R E R E Q U I S ITES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 2
- 3. P R ECAUTI O N S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
- 4. I N ST R U CFI O N S . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 4.1 I ni t ia l Act io n s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 4.2 Subseque nt Act ions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
- 5. R E V I EW AN D S I G NO FF . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
- 6. R E FE R EN CES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
- 7. S U M M ARY O F CH AN G ES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
.(vY l
l l
[h C'I Level of Use EPOP 4475A STOP ThlNK ACT REVIEW Rev.1 Information 1of7 l _- - _ - - _ _ _ - _ - - _ _ - _
. 1. PURPOSE
~O V 1.1 Objective Provide instructions to the External Resources Coordinator during an l
event which activates the Station Emergency Response Organization.
These actions include coordinating and obtaining off-site resources (personnel, equipment, housing, food, purchasing, and financial and legal l services) needed to support the site as requested by the Director of Station Emergency Operations.
1.2 Discussion l
The ERC assists the MOR in obtaining off-site resources. The ERC is stationed in the EOF and reports directly to the MOR.
- 2. PREREQUISITES 2.1 General N/A l
2.2 Documents p -
i
-Q 2.2.1 EPUG 08B," Millstone Emergency Plan Resource Book" {
i I
I b"l Level of Use EPOP 4475A STOP THINK ACT REVIEW Rev.1 Information 2 of 7
1 2.3 Dennitions
.C r 2.3.1 DSEO - Director of Station Emergency Operations 2.3.2 EOF - Emergency Operations Facility 2.3.3 MOR - Manager of Resources 2.3.4 MRDA - Manager of Radiological Dose Assessment 2.3.5 SERO - Station Emergency Response Organization .
- 3. PRECAUTIONS N/A U,A l
1 l
b) v Level of Use EPOP 4475A STOP THINK ACT REVIEW Rev.1 lnformation 3 of 7
r r .
- 4. ] INSTRUCTIONS lO C 4.1 Initial Actions t
4.1.1 INDICATE presence in EOF on SERO Status Board.
4.1.2 NOTIFY MO.R of arrivalin EOE 4.1.3 RECORD date and time of arrivalin MOR logbook.
4.1.4 MAINTAIN a record of significant communications and events in MOR logbook. .
4.1.5 DISCUSS the need for additional personnel and equipment with the MOR.
4.1.6 REQUEST the MOR call in one additional ERC, as necessary. {
4.1.7 Refer To EPUG 088," Millstone Emergency Plan Resource j Book," and ADVISE INPO the SERO has been activated. !
4.2 Subsequent Actions p 4.2.1 lEno requests exist for offa ite s resources, Refer to EPUG 08B 1
{
.V and NOTIFY the following of emergency: j I
NUSCo Purchasing Department
=
Maintenance Services Department Nuclear Records personnel 4.2.2 REQUEST Maintenance Services Department obtain the following to supplement on-site resources, as necessary:
Craft labor l
=
Supplies
..n .
Heavy machinery (v) EPOP 4475A i
Level of Use STOP THINK ACT REVIEW Rev.1 lnformation 4 of 7
I I
. 4.2.3 E the cost of requested equipment or services exceeds '
D $100,000.00, OBTAIN prior approval from the DSEO.
%A 4.2.4 REQUEST NUSCo Purchasing Department obtain the following, as necessary:
)
Consulting services l
- Expense account services j Temporary housing
- Food 4.2.5 E transportation assistance is needed, REQUEST NUSCo Transportation Department deliver the following to the site:
Equipment i a Supplies
)
p a Personnel C 4.2.6 CONSULT with the MRDA to determine safe access routes to :
the site and NOTIFY off-site senices of routes.
1 4.2.7 INFORM MOR of response to requests.
4.2.8 OBTAIN additional support for services from INPO, as necessary.
4.2.9 OBTAIN the following, as necessary:
- Insurance services Financial services j i
4.2.10 PROVIDE assistance to the MOR in preparing and updating a !
rotating schedule for duration of emergency, as necessary. !
O Level of Use EPOP 4475A l STOP THINK ACT REVIEW Rev.1 lnfOrination 5 of 7
.r.
4.2.11 1E directed to terminate SERO by the DSEO, PERFORM the following:
NOTIFY departments and agencies supporting the site with resources of termination.
=
IE resources have been ordered, CANCEL the order.
I s
d l
l Level of Use EPOP 4475A lnformation SW NM AU REWEw Rew 1 L 6 of 7
- 5. REVIEW AND SIGNOFE 5.1 N/A
- 6. REEERENCES 6.1 EPOP 4475," Manager of Resources' 6.2 " Millstone Station Emergency Plan" 7 SUMM ARY OF CIIANGES 7.1 Changed the level of use from General to Information.
7.2 Changed procedure from an NU common procedure (NUC EPOP) to a Millstone Nuclear Power Station Emergency Plan Operating Procedure (EPOP).
7.3 Deleted references to CY in all applicable locations.
7.4 Deleted information in Section 1.2 that stated the MOR shall arrive within 60 minutes of notification and obtain personnel and material resources as needed to support the SERO.
7.5 Changed the ERC position from an on-call position to a subject to call position.
7.6 Deleted information in the applicability section that stated the ERC is required to report to the EOF when requested by the MOR.
7.7 Deleted ERC from the definitions section.
7.8 Deleted note prior to step 4.2.1 that stated telephone numbers are available in EPUG 08B," Millstone Emergency Plan Resource Book," and added references to EPUG 08B in steps 4.1.7 and 4.2.1.
O Level of Use EPOP 4475A Information STOP THINK ACT REVIEW Rev.I 7 of 7