ML20247Q649
| ML20247Q649 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 05/07/1998 |
| From: | CONNECTICUT YANKEE ATOMIC POWER CO. |
| To: | |
| References | |
| PROC-980507, NUDOCS 9805280307 | |
| Download: ML20247Q649 (3) | |
Text
___ ___ -____ _ _ __
1
,i Connecticut Yankee Atomic Power Company Date,of Distribution: 05-07-98 Notice of Receipt of Plant Procedure NUC EPOP l
Change No.: 98-5 To:
Mort Fairtile NRC (code Z)
Copy No.:
COPY # 89 s
Please revise your controlled copy per instructions below:
INSERT:
Index pages 1-2, dated 05-07-98 O
ATTACH:
i
/
I REMOVE:
- f o
REPLACE
... : u v 8 'J l have read and am aware of the provisions of the above listed documents. This acknowledges receipt of the revisions listed above. In addition, all superseded pages have been removed and destroyed.
Signature:
Date:
Please Return This Sheet to the Administration Office, Connecticut Yankee Within Thirty (30) Days.
Reference:
(Emergency Plan Procedures)
ACP 1.2-6.1 10CrR50 4 (a)(5)
Rev.18 9005280307 980507 PDR ADOCK 05000213 F
05-07-98 Nuclear Emergency Planning Operating Procedure Index Biennial Eff.
- ~
Number Revision Title Review Date NUC EPOP 4411 A 3
Assistant Director Technical Support 05-29-97 06-09-97 General -
. NUC EPOP 4411B 3
Assistant Director, Emergency Operations Facility 05-29-97 08-31-97
' General NUC EPOP 4422A 0
Thermal Hydraulic Evaluation Methods 02-12-98 07-01-96 General NUC EPOP 4428A 3
Radiological Dose Assessment Team 06-05-97 08-31-97 General '
NUC EPOP 4428D 1
Meteorological Team 04-29-98 08-08-96 General NUC EPOP 4428E 3
Post Accident Release Rates 01-13-98 01-16-98 General NUC EPOP 4428F 1
Refined Dose Assessment 09-26-97 10-13-97 General NUC EPOP 4428G 2
Protective Action Recommendations 06-05-97 06-09-97 General NUC EPOP 4428H Cancelled Radionuclides Deposition and Dose Calculation PORC 98-18. EP-98-032,02-29-98.
NUC EPOP 44281 0
Direction of POSL Field Sampling 02-12-98 07-01-96 General NUC EPOP 4428J 0
Health Physics Network Communications 02-12 98 07-01-96 General NUC EPOP 4455 0
Manager of Public Information 02-12-98 07-01-96 General NUC EPOP 4455A 0
Nuclear News Manager 02-12-98 07-01-96 General NUC EPOP 4455B 1
Executive Spokesperson 03-04-97 05-19-97 General NUC EPOP 4455C 0
Technical Assistant 02-12-98 07-01-96 General NUC EPOP 4455D 0
News Releases 02-12-98 07-01-96 i
General i
lof2
. -__-__- _-____ m
Nuclear Emergency Planning Operating Procedure IndeX 05-07-98 Biennial Eff.
Number Revision Title Review Date n
(
NUC EPOP 4455E O
News Conferences 02-12-98 07-01-96 General NUC EPOP 4455F 0
Rumor and Inquiry Control 02-12-98 07-01-96 General NUC EPOP 4460A Cancelled IRG Representative PORC 98-8. EP-98-12, OI 21-98.
Replaced by EPIP 1.5-69.
NUC EPOP 4475A 1
External Resources Coordinator 02-12-98 12-09-97 General NUC EPOP 4490 0
Implementation of Recovery Operations 02-12-98 07-01-96 General Iv O
2 of 2
-