_____ __ _ ____ _ _ _ _ _ _ _ _ _ _
i JUN 0 31988 NUMBER mu ECA 2.1 UNCONTROLLED DEPRESSURIZATION key' OF ALL STEAM GENERATORS A.
PURPOSE This procedure provides actions for a loss of secondary coolant which affects all steam generators.
B.
SYMPTOMS OR ENTRY CONDITIONS
'nds procedure is entered fnxn E 2, FAULTED STEAM GENERATOR ISOLATION, Step 2, when an uncontrolled depressurization of all steam genentors occurs.
I 1
i i
i 1
h l
l i
I 8810250266 081007 Page 1 of 18 PDQ ADOCK 05000213 PDR p
JUN 0 31988 o
NUMBER TTT1R REV. ISSUE /DATE j
EC A 2.1 UNCONTROLLED DEPRESSURl7 ATION Rev.4 l
OF ALL STEAM GENERATORS l
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 1
r IF Ah7 SG PRESSURE INCREASES AT ANY TibfE DURING CAUTION:
o
\\
THIS PROCEDURE, E 2, FAULTED STEAbf GENERATOR ISOLATION, SHOULD BE PERFORhfED.
I FR H.1, RESPONSE TO LOSS OF SECONDARY HEAT SINK, l
o SHOULD BE lbfPLLhfEhTED ONLY IF A TOTAL AUX FEED %'ATER FLO%' CAPACITY OF 320 GPhi IS NOT l
AVAllABLE AT AhY Tlh!E DURING THIS PROCEDURE.
i IF THE TURBINE DRIVEN AFH' pub!P IS THE ONLY o
AVAllABLE SOURCE OF AUX FEED %'ATER FLO%',
STEAh! SUPPLY TO THE AF%' PUh!P AfUST BE AfAlhTAINED FROh! AT LEAST ONE SG.
L J
l THE ELECTRIC AUX /UARY FEED %'ATER PUhfP CAN BE NOTE:
o USED IF TURBINE DRIVEN PUSIPS ARE INOPERABl.E.
o FOLDOUT PAGE SHOULD BE OPEN.
l l
1 CIIECK SECONDARY PRESSURE MANUALLY CLOSE VALVES.
t BOUNDRY:
IE VALVES CAN EQI BE CLOSED, j
o Check main steamlir.e is,olation and
'IllEN DISPATCH OPERATOR TO i
bypass valves CLOSED LOCALLY CLOSE VALVES,ONE I
1 LOOP AT A TIME.
I o Check feedwater flow control valves -
CLOSED I
o Check main feedline motor operated isolation valves CLOSED j
o Check SG blowdown isolation valves -
l CLOSED o Check turbine driven AUX feedwater
)
pump steam flow control valves -
CLOSED l
Check atmospheric vent valve -
l o
CLOSED Page 2 of 18
JUN031c88 NUMBER TTTLE REY. ISSUE /DATE EC A 2.1 UNCONTROLLED DEPRESSURIZATION Rev.4 OF ALL STEAh! GENERATORS STEP ACTION / EXPECTED RESPONSE RESPONSE NOT UBTAINED
~
r l
CAUTIONt A SilNISfUAf FEEDWATER FLOW OF 23 GPbf AfUST BE AfAlhTAINED TO EACH SG WITH A WIDE RANGE LEVEL l
LESS THAN 63 % ( 67 % FOR ADVERSE CONTAINhfEhT ).
l L
J j
2 CONTROL FEEDWATER FLOW TO I
htIN15tlZE RCS COOLDOWN:
I i
- a. Check cooldown rate in RCS cold
- b. Check wide range levelin all SGs -
- b. Control feedwater flow to maintain LESS DIAN 69 %
wide range levelless than 69 % in all SGs.
- c. Check RCS cold leg temperatu2es -
- c. Control feedwater flow STABLE OR DECREASING QR dump steam to stabilize RCS cold leg temperatures.
l NOTEt SEAL INJECTION FLOW SHOULD BE AfAINTAINED TO ALL RCPS.
t 3
Cl{ECK IF RCPs SHOULD BE STOPPED:
- a. Check HPSI QR charpg pumps-
- a. QQ IQ Step 4.
l AT LEAST ONE RUNNING
- b. Check RCS pressure-
- b. QQIQ Step 4.
LESS THAN 1150 PSIG (1380 PSIG FOR ADVERSE CONTAINhtENT)
I
- c. Stop all RCPs l
l
- d. Close all four seal water retum 510Vs
- e. IE containment pressure is l
greater tt an 5 PSIG, BlEN perform the foUwing:
l
(r,eal water return trip valves).
l 2 Clow CC TV 1411 (CCW retum from RCP oil coolers)
Page 3 of 18
JUN 0 31988 NUMBER TmE REY.lS W ES ATE ECA 2.1 UNCONTROLLED DEPRESSURIZATION Rev.4 OF ALL STEAM GENERATORS STEP ACT10N/ EXPECTED RESPONSE RESPONSE NOT OBTAINTD l
4 CIECK DWST LEV ~L -
START MAKEUP TO DWST.
I GREATER THAN 54,u)0 GALLONS l
i r
7 CAUTION:
IF A VY PRZR PORY OPENS BECAUSE OF HIGH PRZR PRESSURE,57EP 5 b SHOULD BE REPEATED AFTER PRESSURE DECREASES TO LESS THAN 2350 PSIG.
L J
l 5
CIECK PRZR PORVs AND BLOCK VALVES:
- a. Check power to block valves -
- a. Restore power to block valves.
AVAILABLE
- b. Check PORVs CLOSED
IE any PORY can NQIbe closed, TIEN close its block valve,
- c. Check PORY block valves CLOSED
block valves, j
.i f
l i
t I
d l
2 1
Page 4 of 18
JUN 0 31988 NUMBER TTRI REY. ISSUE /DATE l
E C A 2.1 UNCONTROLLED DEPRESSURIZATION Rev.4 i
OF ALL STEAM GENERATORS l
STEP ACT10N/ EXPECTED RESPONSE RESPONSE NOT OBTMNED F
7 CAUTION:
o Af0NITOR RCS PRESSURE. IF RCS PRESSURE DECREASES TO LESS THAN 405 PSIG (635 PSIG FOR ADVERSE COhTAINhfEhT), THE 12SI PUbfPS AfUST BE AfANUALLY STARTED TO SUPPLY %'ATER TO THE RCS.
I o
IF OFF SITE PO%'ER IS LOST AFTER RESETTING Si, AfANUAL ACTION AfAY BE REQUIRED TO RESTART i
SAFEGUARDS EQUIPEhfEhT.
l o
IF COhTROL 5%' ITCH FOR ANY SHUTDOn'N CHARGING PUAfP H'AS TAKEN TO THE TRIP POSITION, THE PUh!P(S)
SfAY AUTO START n' HEN BOTH SI H'L RELAYS ARE RESET.
6 CilECK IF 1. PSI PUMPS SHOULD BE STOPPED:
- a. Check RCS pressure -
- a. GQ IQ E 1, GREATER THAN 405 PSIG LOSS OF REAL70R OR (635 PSIG FOR ADVERSE SECONDARY COOLAST, Step 1.
CONTAINMENT) i
- b. Check RCS pressure -
- b. GQIQ Step 7.
STABLE Q1 INCREASING I
- c. Reset Si and containment isolation:
j
- 1. Check containment pressure -
- 1. Perform the following:
LESS THAN 5 PSIG
- a. Open CKTs A13 and B13 in l
DC panels A and B.
l
- b. Reset St WL Relays, j
- c. IE charging pump control switch (es) are EQIin TPO, I
'HIEN restore low discharge pressure auto start for shutdown charging pump (s) by taking pump contml switch (es) to the Trip" position then releasing I
switch (es) to the "Auto" position. j
- d. QQ IQ Step 6 d.
l
- 2. Reset Si and containment isolation (SEE OPPOSITE PAGE)
- d. Stop LPSI pumps and place in standby l
Page 5 of 18
JUN 0 31988 NUMBER EU REV. ISSUESAE E C A.2.1 UNCONTROLLED DEPRESSURIZATION Rev, 4 OF ALL STEAM GENERATORS SEP ACTION / EXPECTED RESPONSE l
RESPONSE NOT OBTAINED 7
VERIFY CONTAINMENT SPRAY NOT REQUIRED:
l
- a. Check containment pressure -
- a. Manually initiate containment spray.
l LESS THAN 40 PSIO W11ENcontainment mssure I
decreases to 35 PSIC TIEN close containment spray valves.
- rable, IEont one LPSI open RH h5 T1E (fire main to containment spray).
WlENcontainment nssure decreases to 35 PSIC',
TIEN close RH MOV.31, 8
CIECK RWST LEVEL GD 10 ES.I.3, GREATER THAN 130,000 OALLONS TRANSFER TO RHR RECIRCULATION, STEP 1.
9 CHECK IF SI FLOW SliOULD BE REDUCED:
- a. Check RCS subcooling based on
- a. DO NOT STOP St PUMPS.
RETURNIQ Step 2.
GREATliR1RAN 32
- F (SEE OPPOSTI11 PAGE FOR ADVERSE CONTAINMENT)
- b. Check RCS pressure -
- b. DO NOT STOP St PUMPS, STABLE DE INCREASING RETURNIQ Step 2.
- c. Check PRZRlevel.
- c. DO NOT STOP St PUMPS.
)
GRENiliR1 MAN 10 %
(24 % FOR ADVERSE Try to stabilize RCS pressure with CONTAINMENT) normal PRZR spray, RETURN IQ Step 9 a.
l l
1 i
Page 6 of 18
JUN 0 31988 NUMBER TTTLE REY. ISSUESATE E C A.2.1 UNCONTROLLED DEPRESSURIZATION Rev.4 OF ALL STEAM GENERATORS STEP ACTIONEXIfCTED RESPONSE RESPONSE NOT OBTAINED
~
l r
7 CAUTION:
o IF OFF $1TE POH'ER IS LOST AFTER RESETTING SI, SfANUAL ACTION AfAY BE REQUIRED TO RESTART SAFEGUARDS EQUIPEhfENT.
o IF CONTROL SWITCH FOR ANY SHUTDOH'N CHARGING l
PUAIP %'AS TAKEN TO THE TRIP POSITION, THE PUSfP(S) l AfAY AUTO START %' HEN BOTH Si %'L RELAYS ARE RESET.
L J
i 10 RESET SI > NO CONTAINMENT ISOLATION:
)
- a. Check containment pressure -
- a. Perform the following:
LESS TilAN 5 PSIO
- 2. Reset SI WL Relays.
- 3. E charging p:.mp control switch (es) are b'QIin TPO, I
DIEN restore low dhcharge pressure auto start for shutdown charging pump (s) by taking yump control switch (es) to the awitch(position then releasing
' Trip" es) to the "Auto" position.
4
- 4. GQ IQ Step 11.
t
- b. Reset SI and containment isolation (SEE OPPOSITE PAGE) 11 CliECK CONTAINMEhT START ONECONTAINMEST INSTRUMEST AIR PRESSURE lhmlUMENT AIR COMPRESSOR GREATER DIAN 118 PSIG TO ESTABLISil INSTRUMEST AIR PRESSURE.
i 12 STOP AND PLACEIN STANDBY ALL BUT ONE Cl{ARGING PUMP 13 CitECK RCS PRESSURE DO NOT STOP ADDIBONAL STABLE OR INCREASING St PUMPS.
RETURN IQ Snip 2.
14 COSTROL CIIARGING F1.OW E PRZR LEVEL CONTLNUES TO 7 0 MAlhTAIN PRZR LEVEL
- DECREASE, l
RETURN IQ Snip 2.
i, t
Page 7 of 18
JUN 0 31988 NUMBER Tm2 REY. ISSUESATE EC A.2.1 UNCONTROLLED DEPRESSURIZATION Rev.4 OF ALL STEAM GENERATORS STEP ACT10N/EXPEC1TD RESPONSE RESPONSE NOT OBTAINED 15 CIIECK IF IIPSI PUMPS SHOULD BE STOPPED:
- a. Check RCS pressure:
- a. DO NOT STOP ADDirlONAL St PUMPS.
o GREATER TilAN 1475 PSIG RETURN IQ Step 2.
j (1700 PSIG FOR ADVERSE CONTAINMEST) o STABLE OR INCREASING I
- b. Stop ilPSI pumps AND place in standby 16 STOP LPSI PUMPS AND PLACE IN STANDBY 17 VERIFY SI FLOW MOT REQUIRED:
- a. Check RCS subcooling based on
- a. Manually operate SI pumps core exit thermocouples.
as necessary.
GREATER DIAN 32
- F RETURN I.Q Step 2.
(SEE OPPOSITE PAGE FOR ADVERSE CONTAINMENT)
- b. Check PRZR level.
- b. Contml charging flow to maintain GREATER TilAN 10 %
PRZR !cvel.
(24 % FOR ADVERSE IE PRZR level can liQIbe nuintained, CONTAINMEST) 11{EN manually operate SI pumps as necessary.
RETURN IQ Siep 2.
18 CliECK RCS COLD LEG CON ~IROL AUX FEEDWATER F1.OW TEMPERATURES OR DUMP STEAM TO STABILIZE P.CS STABLE OR DECREASLNG COLD LEO TEMPERATURES.
19 Cl{ECK WIDE RANGE LEVEL CONTROL AUX FEEDWATER FLOW IN ALL SGs LESS THAN 69 %
TO MAINTAIN WIDE RASGE LEVEL LESS THAN 69 % IN ALL SGs.
20 CIIECK PRZR LEVEL CONTROL CIIARGING FLOW AS GREATER 'IllAN 15 %
NECESSARY TO MAISTAIN LEVEL (35 % FOR ADVERSE COSTAINMENT)
Page 8 of 18
JUN 0 31988 butBER TTlu REY. lSSI.1RDATE I
ECA 2,1 UNCONTROLLED DEPRESSURIZATION Rev.4 OF ALL STEAM GENERATORS l
l STYP ACT10N/ EXPECTED RE3PON$h RESPONSE NOT OBTAINED 21 ESTABLISH LEIDOWN IE CONTAINMENT PRESSURE IS f
(SEE OPPOSITE PAGE)
LESS THAN 5 PSIO, i
IIIES ESTABLISH ALTERNATE LETDOWN BY PERFORMING T1IE i
l FOLLOWING i
- 1. Reset Containment HCP WL Relays.
- 2. Open DH.TV 1841, drain header trip l
valve.
i
- 3. Reset solenoid in blowdown room for !
drain header trip valve, DH TV 1847. !
- 4. Line up drain header to VCT:
l I
l
- a. Cose DH V 408, drain header i
to PDT.
to V C r.
i
- 5. Cose breaker for DH MOV 310.
- 6. Open one loop drain MOV.
- 7. "Ihrottle DH MOV-310 to maintain PR2R level.
22 CHECK VCT MAKEUP COh'IROL SYSTEM:
- a. Check blender ratio set at -
a.
S'. blender ratio for greater GREATER TIIAN RCS RCS boron concentration.
i BORON CONCEN'IRATION
- b. Check controls set for-AUTOMATIC
- b. Set ca trols for automatic, i
- c. Ensure RCS baron concentration
- c. Berate RCS as necessary to nuintian
~
is maintained greater than required required baron corcentration.
IN ACCORDANCE WTITI SUR 5.3 '9, BORAT10N REQUIREMENTS FOR REACTOR SHUTDOWN.
)
o Sample RCS i
23 ALIGN CHARGING PUMP SUCTION TO VG 1
- b. Cose BA MOV 373
- c. Check BA MOV-32 CLOSED
- c. Cose BA MOV 32.
Page 9 of 18
JUN 0 31988 NUME'ER Tm.E REY. ISSUE /DAll E.CA 2.1 UNCONTROLLED DEPRESSURIZATION Rey,4 OF ALL STEAM GENERATORS
$TEP ACT10NEXPEC'TED RESPONSE RESM)NSE NOT OBTAINED 24 CliECK RCP SEAL RETURN STOP AFFECIID RCP(s).
i FLOWS GREATER T11AN O.2 GPM f
25 COSTROL PRZR PRESSURE:
- a. Turn on PRZR heaters
- a. E normal spray is SQIavailable AEQ operate rormal PRZR Mletdown ts in senice, spray as necessary to maintain DIEN use auxiliary spray.
PRZR pressure stable E eatillary spray is b'QIavallable.
IFES use one PRZR PORV.
26 CIIECK RCP COOLING SYSTEMS:
E.'YABLISH NORMAL COOLING f
FLOW TO RCPs o RCP CCW System flow. NORMAL IN ACCORDANCE WTTH, i
o RCP sealin}:ction flow NORMAL l
NOP 2.81, OPERAT10N OF COMPONEST COOLING SYSTEM, ASD NOP 2.61.
SEAL WA*IER STARTUP NORMAL OPERATION.
27 VERIFY ALL ACBUSES ENERO! ZED TRY TO RESTORE OIT SITE POWTR BY OFF SITE POWER TO AC BUSES.
(SEE OPPOSITE PAGE)
E OFF STTE POWER CAN SQI BE
- RESTORED, f
ILES LOAD T1IE FOU.OWING EQUIPMEST ON AC FMERGENCY BUSES:
- 1. MCC 5,
- 2. Control air compressors.
- 3. Semi vital 120 volt buses.
- 4. Closed cooling system pumps.
- 5. Banery charger I A.
- 6. One component cooling water pump.
- 7. One semcc water pump for each diesel.
- 8. E senice water is used for RIIR ILX, DIEN use two senice water pumps.
- 9. Stan CARFANs as required tolirmt containment pressure and temperature.
l l
Page 10 of 18
JUN 0 31988 FUMBER TME REY ISSLTAATE E C A.2.1 UNCONTROLLED DEPRESSURIZATION Rev. 4 OF ALL STEAM GENERATORS STEP ACT10N/EXPECIID RESPONSE RESPONSE NOT OBTA!5TD lr CAUT10N:
IF RCP SEAL C00UNG FLOW HAD PREVIOUSLY BEEN LOST, THE AFFECTED RCPls) SHOUlD NOT BE STARTED PRIOR TO AN ENGINEERING STATUS EVALUATION.
L J
NOTEt RCPs SHOULD BE RUN IN ORDER OF PRIORITY TO PROVIDE NORMAL PRZR SPRAY, 28 CHECK RCP STATUS:
- a. Check RCPs -
- a. Try to st.vt one RCP:
AT LEAST ONE RUNNING
- 1. Establish condidons for staning an RCP:
- a. Close too Tc isolation valve.
- b. Open loo
> pass valve,
- c. Stan oilI pump.
- d. Insure seal water and component ecoling water supplied to RCP.
- e. Insure lower bearing temperature j
is less than 170' F.
- f. Check RCS pressure greater than 300 PSIO.
(sem water return tnp valves) h Open CC TV 1411 (oil cooler CCW rerum trip valve)
- 1. Open seal water return MOV.
- 2. Start selected RCP, 11EN perform the following:
l
- a. Open 100 Te isolation valve,
- b. Close it bypass valve.
11EN perform the fo!!owing:
i
- a. Oxn loop Tc holation valve.
- b. C ose loop b> Tass valve.
- c. Verify narural ein:ulation (SEE ATTACHMENT A).
IE natural circulation EQI verified.
HIES increase dumping steam.
l i
Page 11 of 18
JUN 03 W88 NUMBER TTil.E REY ISSUE /DATE l
ECA 2,1 UNCONTROLLED DEPRESSURIZATION Rev.4 OF ALL STEAM GENERATORS l
STEP ACTIONEXPECTED RESPONSE RESPONSE NOT OBTAINED i
29 CIIECK SOURCF. RANGE l
DE1ECTORS ENcRGIZED:
I I
- a. Check intermediate range flux -
- a. Contir ue with step 30, t
4 LESS T11AN 5 x 1010 AMPS M1IEN less than 5 x 10'30 AMPS, I
l TilEN do steps 29 b, e and d.
t l
b Verify source range detectors -
- b. Manually energize source tsnge I
j ENERGlZED detectors.
t il
- c. Transfer nuclear flux recorders l
to source range scale l
l l
i
- d. Transfer SUR meters to source t
i range l
30 CHECK IF DIESEL GENERATORS l
J SHOULD BE STOPPED:
j
- a. Verify ae emergency buses energized -
- a. Try to restore off site power to l
1 BOTH TRAINS BY OFF STm both trains.
t i
POWER (SEE OPPOSTE PAGE)
)
)
BUSES 8,4 and 5 IE NOIrestored, s
i ASD 311ES load the following equipment i
j BUSES 9,6 and 7 on the ac emergency buses:
i l
I l.MCC 5.
1
- 2. Control air compressors.
l 4
i
- 3. Semi. vital 120 V buses.
- 4. Closed cooling system pumps.
- 5. Battery charger I A.
l
- 6. One component cooling water l
[
)
- 7. One service water pump fur each f
]
diesel generatcr.
t
- 8. IE service water is supplied to j
t 1
1 RilR heat exchangers, i
11IEN use at least two senic I
water pumps.
4
- 9. Start CARFANS as required to l
limit containment pressure ud
[
l temperature.
l l'
- b. Stop any unloaded diesel t
generatoe and place it in standby l
1 (SEE OPPOSITE PAGE) l l
I i
I f
i l
Page 12 of 18 i
i I
1
~
Juli1L1388 NUMBER TTTU REY. !SSUE/DATE i
E C A.2.1 UNCONTROLLED DEPRESSURIZATION Rev 4 l
OF ALL STEAM GENERATORS J
$TEP Act ON/ EXPECTED RESPONSE RESPONSE NOT OBTAINED 31 SMUT DOWN UNNECESSARY PLAST EQUIPMENT I
- a. Stop one main feedwater pump I
- b. Stop one condensate pump t
- c. Place standby heater drain pump inTTO
- d. Place running heater drain pump l
l
]
in1TO j
4 32 MAISTAIN STABLE PLAST CONDmONS:
o PRZR pressure o PRZRlcvel o RCS average temperature i
33 VERIFt St FLOW NOT REQUIRED:
I I
- a. Check RCS subcooling based on
- a. Manually operate SI pumps i
a necessary.
GREATER *nIAN 32
- F RrTURN I_Q Step 2.
i (SEE OPPOSTE PAGE FOR ADVERSECOSTAINMENT)
I
- b. Check PR~G level.
- b. Contml charging flow to maintain GREATER DIAN 10 %
PRZR level.
(24 % FOR ADVERSE lE PRZR levelcan b'QIN maintained.
COSTAINMENT)
TiiEN manually operate Si pumps as necessary.
RETURN I.Q Step 2, 34 CHECK IF SOLID PLAST CONDITIONS SHOULD BE ESTABLISlIED:
- a. Check PRZR steam phase temperature -
- a. Continue RCS cooldown and LESS TilAN 450' F depre.surization.
WHEN PRZR steam phase temperature is less than 450' F.
TifdN do step 34 b.
- b. Increase PRZR ineI to 100 %
Page 13 of 18
JUN 0 31988 NUMBER TTRE REY. lSSLT/DATE E C A.2.1 UNCONTROLLED DEPRESSURIZATION Rev. 4 OF ALL STEAM GENERATORS STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAISID q
I CAUTlON:
THE SI SYSTEM MUST BE DISABLED BEFORE RCS r
TEMPERATURE IS LESS THAN 315
- F.
l I
I 35 PERFORM COLD SillTTDOWN ALIGNMENT:
- a. Check core exit thermocouples -
- a. Continue RCS cooldown.
LESS TIIAN 350' F WifEN eore exit thermocouples are less than 350' F.,
- b. Align core cooling equ_ipment IN ACCORDANCE wTTil NOP 2.3-4 IlOT STANDBY MODE 3 TO COLD SIRTIDO%W MODE 5 ASD NOP 2.121, CORE COOL 2iG SYSTEM LINEUP 1
FOR S}RTIDOWW AND ATPOWER l
OPERATION j
- c. Check iflow temprature over
- c. WHEN all conditioas are satisfied, pressure protection relief valves 111EN do step 35 d.
should be placed in fervice:
- 1. Check PRZR level SOLID l
l
- 2. Check RCS temperature -
LESS MAN 325' F
- 3. Check PR2R wmperature -
LESS WAN 430' F
- 4. Check RCS pressure -
LESS ' IRAN 325 PSIO
- d. Place low tempenture over i
7ttssure protecuon relief valves un semce IN ACCORDANCd %TTH NOP 2.3-4 IlOT STANDBY MODE 3 TO COLD SIIU1DOWW MODE S i
Page 14 of 18
i JUN 0 31988 i
NUMBER EU REY. ISSUE /DAR i
EC A.2.1 UNCONTROLLED DEPRESSURIZATION Rey, 4 j
j OF ALL STEAM GENERATORS l
1
$EP ACTION / EXPECTED RESPONSE RESPONSE NOT 08TALGD I
1 i
36 CllECK RCS COLD LEO COS"IltOL AUX FEEDWARR FLOW j
1EMPERATURES AND DUMP STEAM TO ESTABLISi{
LESS 1HAN 30C* F A COOLDOWN RATE OF 100' F / HR (277' F FOR ADVERSE IN THE RCS COLD LEGS.
j COSTAINMENT) l 37 CHECK RCS PRESSURE E PRZR IS SOLID, i
LESS 1hAN 300 PSIO THEN CON 11tOL CHARGING l
(t 310 PSIO FOR ADVERSE NSD LEIDOWN FLOWTO j
COSTAINMEhT)
MAlhTAIN RCS PRESSURE.
E PRZR IS EQISOLID, j
11IEN USE NORMAL PRZR SPRAY 4
TO MAlhTAIN RCS PRESSURE.
E NORMAL SPRAY i
hg AVAILABLE i
LE1DOWN IS IN SERVICE, USE AUXILIARY SPRAY.
L E AUXILIARY SPRAY i
EQI AVAILABLE, i
ItiEN USE ONE PRZR PORV.
l 38 CHECK IF RHR SYSTEM CAN BE PLACED IN SERVICE:
- a. Check the following:
- a. REIIIRN IQ Step 36, o RCS tem wature -
LESS 11 AN 300' F (277' F FOR A') VERSE COSTAINMENT) o RCS pressure.
LESS THAN 300 PS10
(* 310 PSIO FOR ADVERSE CONTAIhWEST) l
Page 15 of 18
JUN 0 31988 i.
PLUMBER TITLE REY.15SLT/DATE EC A.2.1 UNCONTROLLED DEPRESSURIZATION Rev. 4 OF ALL STEAM GENERATORS f
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTALNED 39 CONTINUE COOLDLWN TO COLD t
SilUTDOWN:
- a. Maintain cooldown nie in RCS l
cold legs LESS 1RAN 100' F / HR.
i
- b. Check wide range levelis all SGs -
- b. Control AUX feedwater flow to LESS THAN 69 %
maintain wide range levelin all SGs
(
less than 69 %.
40 CIIECK RCS TEMPERATURES RETURNIQ SEP 39.
LESS THAN 200' F 41 EVALUATE LONG TERM PLAhT STATUS:
i
- a. Maintain cold shutdown conditions j
- b. Consult with plant engineering staff 4
i I
b) l I
j i
a f
l r
i l
t i
l l
I i
i l
i 1
(
i l
i Page 16 of 18 l
JUN 0 31988 NUMBER Till.E REY lSSUE/DA1E EC A 2.1 UNCONTROLLED DEPRESSURIZATION Rev. 4 OF ALL STEAM GENERATORS
]
P i
ATTACINENT A
{
I
'!he following condidons support or indicate natural circulation flow:
i o
RCS subcooling based on core exit thermocouples is greater than 32' F.
1 o
SG pressures are stable or decnasing.
i l
4 o
RCS temperature based on core exit thermocouples and average temperature indications is stable or decnasing, i
4 o
RCS cold leg temperatures are at saturation temperature for 50 pressures.
l l
l i
I t
)
t i
I l
l l
l l
I f
f 1
I i
L i
i i
l 1
i l
Page 17 of 18 1
1
JUN 0 31986 REY. lSStlE/DATE Rev,4 FOLDOUT EQR ECA 11 PROCEDLtRE 1.
SJ REINTTIATION CRTERIA i
Manually operate charging OR SIpumps as necessary, E either condition listed below occurs:
o RCS subcooling based on core esit thermocouples LESS TIIAN 32' F.
o PRZR level CANNOT BE MAINTAINED GREATER 'I1'.AN 10%
4 (24% FOR ADVERSE CONTAINMENT).
i 1
2.
RED PA111 StNMARY s.
SUBCRITICALLY Nuclear power greater than 5%.
J b.
CORE COOLING -
Core exit thermocouples greater than 1200* F.
j c.
IIEAT SINK -
Total AVAILABII feedwater flow capability
~
less than 320 GPM.
d.
INTEGRTIY -
Co'.d leg temperatua decreases greater than 100* F i
i in last 60 minutes AER RC'S cold leg temperature less than 231' F.
c.
CONTAINhENT-Containment pressure greater than 40 PSIO.
3.
E 2 TRANSITION CRITERION j
GQ IQ E 2, FAULT 1iD STEAM OENERATOR ISOLATION, Step 1, E any 50 pressure increases at any time.
4 RHR RECIRCULATION SWTTCHOVER CRTERION i
GQ IQ ES 1.3.'illANSFER TO RHR RECIRCULAT10N, Step 1, E RWST level decreases to less than 130.000 gallons.
l
( LPSI pumps may cavitate E RWST level is less than 70,000 gallons. )
t 5.
ADE SUPPLY MAKEUR CRTTERION Start rdeup to DWST before Icvel decreases to 54,000 gallons.