I JD N N DOTIO U T YANKOO ATOMIC POWOR COMPANY Temporary Procedure Change

(

CHANGE NUhBER 1

INTE.VT CHANGE 2

DUE DATE 3

h h 5~C y NOSMTCHMGE

/,,

,g gfg PROCEDURE NUhGER 4

N 6

f~C fftl CTet2 721f 02 [AffTY znyfs7 eH REVISION INITIATED BY 7

DEPARD1EST 8

DATE 9

kAnfi.~

Ch

'2~

DESCRFTION OF CHANGE 10 e$.t,v..;k C]up

// C.3

(?NO TC 0.8

' $0 '70.C Yr P / 2

REASON FOR CHANGE 11 T ri o The r/.7 nu.m kv, d (L. nedr 9, If.cJ 6 s_ r 4y /2, d

j DEPARB1EST HEAD REVIEW 12 S AFETY EVALUATION YES

,; NO thTEGRATED S AFETY U YES X NO REQUIRED?

EVALUATION REQUIRED?

ENVIRONh1 ENTAL YES [

NO UNREVIEWID S AFETY YES [

NO QUEST 10N7 REVIEW REQLTRED7 RESPON3!BLETEP. RB1EST HEAD APPROVAL 13 DATE 14 S_cu 1 0

~

OPER.)110NS SH]FT SUPERVISOR APPROVAL (N/A FOR LVTEST CHANGE) 13 DATE 16

.- l Y ?/7 4.<

r-4,

h ~ 5 $h V) 4 17 DATE 13 PORC h1EETLNO NUhG ER 19 APPROVED (PORC CHdAIRh1 /4,'

G/7/e6 60-/s2 B7,4?F/

n 1

ONET151E CHANGE 7 YES IJCENSED OPERATUR RENTEW7 iTS NO FOLLOW UP ASSIGNEDTO CR NUhGER 23 DUE DATE -

4 OPS

"'^

ST-9H 9/7/F2' ACP l.2 6.4 REV, 21

QoMC, FlGURE 7.2 4/38 8010240548 001007 PDR ADOCK 05000213 P

PDR

JW U e 1988

\\

NUMBER TITLE REV. ISSUE /DATE E.0 REACTOR TRIP OR SAFETY INJECTION Rev.~4

(~~

(

STEP ACHON/ EXPECTED RESPONSE RESPONSE NOT OBTAINED 9

VERIFY EMERGENCY DESEL MANUALLY STARTEhERGENCY GENERATORS RUNNING DESEL GENERATORS.

10 VERIFY SERVICE WATER PUMPS MANTIALLY START SERVICE RUNNING WA'IER PUMPS.

(ONE PUMP FOR EACH DESEL GENERATOR) 11 VERIFY SI PUMPS RUNNING:

z

a. Check HPSI purnps - RUNNING
a. Start HPSI pumps,
b. Check LPSI pumps - RUNNING
b. Stan LPSI pumps.
c. Perform the following to stan Charging pumps:
1. Check CH MOV 257 - CLOSED
1. Manually QR I.ocally close CH MOV-257.
2. Check BA MOV-373 - OPEN
2. Manuallyopen BA.MOV-373 QH BA MOV-32.

l TPs$9 4

3. Check off site power-AVA1ABLE
3. QQIQ Step [ I2
4. Take charging pump control switches to the "Trip" then to the "Stan" position 12 VERIFY CONTAINhENT AIR RECIRCULATION SYSEM OPERATING:
a. Check all face dampers - OPEN
a. Open all face dampers,
b. Check all CARFANS RUNNING
b. E off site power available, THEN stan all operable CARFANS.

E b'QI avallable, THEN verify one CARFAN auto stans on each diesel generator. Stan a third CARFAN within 15 minutes.

E only one diesel generator operable,

'IEEM stan second CARFAN within 30 minutes.

Stan tmrd CARFAN within 15 r-i utes utilizing altemate CARFAN power supply.

Page 4 of 15 1

x e-- - -,,

--,---,-,--------w

-v-

- - - --