|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20155B0331998-10-22022 October 1998 Proposed Tech Specs Changing TS 3.3.2.1, Instrumentation - ESFAS Instrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program ML20154G5311998-10-0707 October 1998 Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review ML20154G5391998-10-0606 October 1998 Rev 6 to Project Procedure PP-07, Discrepancy Repts ML20154G5351998-10-0606 October 1998 Rev 3 to Project Procedure PP-04, Regulatory Review Procedure ML20154G5521998-10-0606 October 1998 Rev 5 to Project Instruction PI-01, Svsr Implementation Checklists & Workbook ML20154G5251998-10-0505 October 1998 Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan ML20236Q9341998-06-30030 June 1998 Rev 4 to PI-01, Sys Vertical Slice Review Implementation Checklists & Workbook ML20236Q9321998-06-25025 June 1998 Rev 4 to PP-01, Sys Vertical Slice Review ML20153C6171998-06-18018 June 1998 Rev 2 to CP 3804K, PASS Rcs/Rss Sample ML20153C6221998-06-18018 June 1998 Rev 1 to CP 3804L, PASS Containment Air Sample ML20153C6291998-05-31031 May 1998 Rev 0,Change 1 to CP 3804M, PASS Ventilation Samples ML20247R7851998-05-20020 May 1998 Rev 1 to Epop 4455C, Technical Assistant ML20247Q7011998-05-20020 May 1998 Rev 1 to Epop 4490, Implementation of Recovery Operations ML20247R8081998-05-20020 May 1998 Rev 1 to Epop 4455F, Rumor & Inquiry Control ML20247Q6671998-05-20020 May 1998 Rev 1 to Epop 4422A, Thermal Hydraulic Evaluation Methods ML20247Q6901998-05-20020 May 1998 Rev 1 to Epop 4475A, External Resources Coordinator ML20247R7921998-05-20020 May 1998 Rev 1 to Epop 4455D, News Releases ML20247Q6771998-05-20020 May 1998 Rev 1 to Epop 4428I, Direction of Posl Field Sampling ML20247R7541998-05-20020 May 1998 Rev 1 to Epop 4455A, Nuclear News Manager ML20247R7491998-05-20020 May 1998 Rev 1 to Epop 4455, Manager of Public Info ML20216B1791998-05-0808 May 1998 Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary ML20247H4581998-04-0909 April 1998 Rev 19 to EOP 35 E-0, Reactor Trip or Safety Injection B17159, Backlog Mgt Plan for Unit 31998-03-31031 March 1998 Backlog Mgt Plan for Unit 3 ML20216K0641998-03-20020 March 1998 Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program ML20216H7101998-03-13013 March 1998 Independent Corrective Action Verification Program Status Rept ML20216H7191998-03-0303 March 1998 Independent Corrective Action Verification Program Status Rept ML20203F6931998-02-20020 February 1998 Rev 6 to PI-MP3-11, Discrepancy Rept Submittal & Closure ML20203E2131998-02-19019 February 1998 Cancelled Rev 26 to 1-OPS-10.11, Locked Valve List ML20203D4111998-02-18018 February 1998 Revised 1-OM-index Unit 1 Operations Dept OM Index & Rev 2 to OM 3.8, Millstone Unit 1 Operations Manual ML20203F6751998-02-16016 February 1998 Rev 2 to PI-MP3-07, Review of Accident Mitigation Systems ML20203F6601998-02-16016 February 1998 Rev 5 to Audit Plan for Independent Corrective Action Verification Program ML20216H7351998-02-11011 February 1998 Independent Corrective Action Verification Program Status Rept 1999-05-10
[Table view] |
Text
+ 5 h
MILLSTONE UNIT 3 INDEPENDENT CORRECTIVE ACTION VERIFICATION PROGRAM STATUS REPORT MARCH 13,1998 A$ $~ -
Project Milestone Schedule Tier 1 System Review Complete
- RSS Modifications 3/19/98 Tier 1 Corrective Action Review Docs + 2 weeks Tier 1 O&M Review Complete Tier 2 Review Complete Tier 3 Review Complete Final Report issue Resol + 2 weeks
- Corrective actions from NRC Tier 1 inspection in process p==28a= agga,,z - - - - - - - - 1 PDR ,
- 1 Tier 1 - SRG Review Status i
New RSS Mods -remaining items j 1 HVAC calc (RF1-862) 4 Mechanical calcs (RF1-868) 1 Tubing stress analysis 1 Piping review checklist 2 I&C review checklist i licensing review checklist ]
l Tier 1 Inspection corrective actions - remaining items 4 Equipment mounting cales (RF1-869,872) j 6 SQ reports (RF1-873) 1 Intermediate support structure 4lh k~
Tier 1 - Programmatic Review Status ,
Corrective Action Implementation Review
- 1534 CA documents were screened to determine which ones would be reviewed for implementation
- 265 were selected
- NU has provided 261 closure packages 5 UIRs and 1 CR are Mode 2 items
- 16 of these are incomplete and additional documentation has been requested from NU
- S&L review is apprcximately 80% complete M
1 Discrepancy Report Summary (
957 Valid Preliminary DRs issued to NRC/NU/NEAC 826 Resolutions submitted by NU 779 NU Resolutions entered into database 671 NU Resolutions reviewed by S&L
- 537 Accepted and Closed
- 130 Retumed w/ comments or request for more information
- 4 Pending review of implementation of NU corrective action A$ r
~"
Discrepancy Report Summary Of the 537 Acceptable and Closed resolutions 332 Confirmed Discrepancies 74 Previously identified by NU 131 Non-discrepant conditions Of the 332 Confirmed Discrepancies 11 Level 3 321 Leve,14 Of the 5 Pending Discrepancies 3 Level 3 1 Level 4
._-_ _ -- - _ - 3 i
p.
1 Discrepancy Report Summary Number NU NU Resp. S&L Eval. More info issued Baga in system Complete Needed.
Level 2 1 1 1 0 1 Level 3 328 306 276 170 51 1
Level 4 628 519 502 367 82 TOTALS 957 826 779 537 134 Jlk Y~
DR Submittal and Response Rate
= i 900 800 7o0 soo
/ / /
soo . / / /
a / / /
soo 'J #
J /
_ _ - - / ;
o# , , , , , , , , , , , , ,,,,,,,,
24- 7- 21- 5- 19- 2- 16- 3o- 13 27- 13 Oct Nov Nov Dec Dec Jan Jan Jan Feb Feb Mar t't l-DRs issued ~NU Responses ---S&L Reviews l ,j Ji$
Y i
l 4
l-t i
Discrepancy Report Summary Number NU Resp. S&L Eval. More info issued trLiy31gn Cornolete Needed Tier 1 804 652 440 114 Tier 2 50 48 39 6 Tkr3 103 79 58 14 TOTALS 957 779 537 134 4lk O~
DR Type & Level (Confirmed & Pending DRs)
Discrepancy Type Level 3 Level 4 Calculations 4 115 i Component Data 1 48 Corrective Actions 2 12 Corrective Action Implementation 0 3 Design Change Process 1 2 Drawings 2 68 Installation Implementation 2 38 Installation Reglurements 1 4 Licensing Documents 0 17 O&M and Testing Implementation 0 2 l
O&M and Testing Procedures 0 7 Procedure implementation 0 3 esjing implementation 1 3 4
Mg j
-m L
h
[*
l DR by Discipline (Confirmed & Pending DRs)
Discipline Level 3 Level 4 Electricaldesign 2 79 EQ 0 8 l&C Design 1 32 Mechanicaldesign 6 111 Maintenance 0 3 Operations 0 11 Piping design 1 39 Structural design 1 17 Other 3 22 4lh h~~
1 Calc DRs by Discipline (Conf. & Pending DRs)
Discipline Level 3 Level 4 Electrical design 0 17 EQ 0 1 l&C Design 0 7 Mechanicaldesign 2 56 Piping design 1 14 Structural design 1 17 Other 0 3 TOTALS 4 115 l
l (Approximately 1650 calculations reviewed)
J ;
.1 l
- .- -. - - - _ - - - - _ - - . - - -.-.----.g
i i
Drawing DRs by Disc.(Conf. & Pending DRs) i Discipline LeyeL3 L.tvalf Electrical design 0 33 l&C Design 1 13 l Mechanicaldesign 1 10 Piping design 0 10 J Structural design 0 0 Other 0 2 TOTALS 2 68 (Approximately 910 drawings reviewed) l l
jlh V~~~
i i
l DRs by System & Level (Conf & Pending DR)
Svstern Level 3, Level 4 i
Service Water -SWP 3 93 l I
Recirc / Quench Spray - RSS 1 89 i
SLCRS / Ventilation - HVX 6 48 Emergency DG & Aux. - DGX 0 41 New RSS Mods 1 6 System "N/A" 3 45 Jlh ---Y'- .
. _7 . . ._ .
. 1 a
4 4
SWP DR Type & Level (Conf & Pending DRs)
Discrepancy Type Level 3 Level 4 Calculations 1 31 Component Data 0 6 Corrective Actions 1 3 Corrective Action implementation 0 0 Design Change Process 0 1 Drawings 0 22 ]
installation Implementation 1 23 l Installation Reglurements 0 2 )
Licensing Documents 0 3 O&M and Testing implementation 0 1 O&M and Testing Procedures 0 1 Procedure implementation 0 0 esjing implementation 0 0 j i
AEk F 1
l
)
RSS DR Type & Level (Conf & Pending DRs)
Discrepancy Type Level 3 Level 4 i Calculations 1 34 Component Data 0 21 Corrective Actions 0 0 Corrective Action implementation 0 0 Dosign Change Process 0 1 Drawini;s 0 18 installation implementation 0 9 Installation Regiurements 0 1 Licensing Documents 0 0 ,
O&M and Testing implementation 0 1
)
O&M and Testing Procedures 0 2 Procedure implementation 0 0 esjing implementation 0 2 g
~ ~
jgh Y
- . - . . - _ . - - . - - - . - . - . . - - . - - - - . . - . . - g.
]
l i 1 \
l l
HVX DR Type & Level (Conf & Pending DRs)
Discrepancy Type Level 3 Level 4 Calculations 1 15 Component Data 1 14 j Corrective Actions 0 3 Corrective Action Implementation 0 0 Design Change Process 0 0 4 Drawings 2 10 installation implementation 1 2 Installation Regiurements 0 0 Licensing Documents 0 2 O&M and Testing implementation 0 0 O&M and Testing Pmcedures 0 0 Procedure implementation 0 1 1 1 0 j
}esjing implementation Jg) 7 ~~ l l
4 i
DGX DR Type & Level (Conf & Pending DRs)
Discrenancy Type Level 3 Level 4 Calculations 0 15 Component Data 0 5 Corrective Actions 0 2 Corrective Action implementation 0 0 Design Change Process 0 0 Drawings 0 14 Installation implementation 0 3 installation Regiurements 0 1 Licensing Documents 0 0 O&M and Testing implementation 0 0 O&M and Testing Procedures 0 0 Procedure implementation 0 1 esjing implementation 0 0 g
)h $
I l
._____.._._.__p -
l .-*
,i "New" DR Type & Level (Conf & Pending DRs)
Discrepancy Type Level 3 Level 4 Calculations 0 4 Component Data 0 1 Corrective Actions 0 0 Corrective Action implementation 0 0 Design Change Process 0 0 Drawings . 0 1 installation implementation 0 0 {
Installation Regiurements 1 0 J Lloensing Documents 0 0
)
O&M and Testing implementation 0 0 i O&M and Testing Procedures 0 0 Procedure implementation 0 0 l l
esjing implementation 0 0
~
Jk l
1 System "N/A" DR Type & Level (Conf & Pend)
Discrepancy Type Level 3 Level 4 Calculations 1 18 Component Data 0 1 l
Corrective Actions 1 4 Corrective Action Implementation 0 0 Design Change Process 1 0 l Drawings 0 3 Installation implementation 0 1 Installation Regiurements 0 0 l Licensing Documents 0 12 O&M and Testir'g implementation 0 0 O&M and Testing Procedures 0 4 I Procedure implementation 0 1 es 0 1 g
)gh}ing implementation
-__,o_.