ML20207F621
| ML20207F621 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/03/1999 |
| From: | Tarallo B NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| References | |
| C-OP-606, NUDOCS 9903110274 | |
| Download: ML20207F621 (4) | |
Text
r 1
l 4
i
- NDS Document Transmittal #121819 3/3/99 To:
Nuclear Regulatory Commission Addressee unique # 140 Document Control Desk ROUTINE detribution Washington, D.C. 20555 The following documents have been ravised. You are currently on distribution for j
these documents. Verify that all documents are included in this distribution set.
DOCUMENT REV COPIES C OP 606, CH1 2
1 l
l l
O /
ILb[
9903110274 990303 I
PDR ADOCK 05000245')
P PMi Sign and return this form as soon as received to: Diane ONeil x2451, NDS/ COL, B433-1, Mdistone or FAX (600) 444 5711.
Signature Date:
i F
T
,. a.
Document Change Request Form
! [Section 1: Change initiation Infor nation j
D Document No.:. C OP 606 Revision No.
2 Change No.
1 i
Title:
Communications - Radiopaging and Callback Monthly Operability Test I
i Initiated By: B. Tarallo Date 01-26-1999 One Time change?YES NO X Type of Change:
' Intent )( Temporary Change.
Expiration Date gagngga7egylguge hn r
t n Reason:
Espiration Condition?
Changed the ES, MOR, MPl, and NNM SERO positions from subject-to-call to on-call and added the TSCRE on-call position for consistency with EPAP 1.15, Management Program for Maintaining Emergency Preparecness.
' Removed Date:
Section 2: Instructions for Entering Change l
~ emove and replace Attachment 3 and Attachment 4. No revision bars appear en Attachment 4.
l Section 3: Temporary Change Interim Approval l,
. 7echon.5a: Approved hf70RCnYRiiiher RI, or FirsfLTiielupervisor Signature:
Date:
Section 3b: Approved by Shift Manager or SRO Licensed on Unit Signature:
Date:
Section 4: Reviews
[IiidFpendEhTHevieweF(s~TNgnaIEFF(s l
p
-[- ~PrintName//Mgf/
(includes RAC 6 review)
/?-- ~ ~ ~ -
MDate [-
Ul No Comments /
~ni at U2 No Comments /
Signdurr '
'T t $ mm r
e h,
[rm
- igu ar rinhm --
4J T
gR wer Signature c hafety Evaluation / Environmental Review Attached? YES NO j
c (OR YES / NO c SQR Reviewer Recommendation for Approval?
YES NO qu ISection 5: Review and Approval
~ ~l
' ResponiihlFTndRTdual/
' ~
I P[
~
Responsible Manager Signature:
M'
.44'.
Date:.Z -Mj_ __
l Date:N k __._..
PORC QR,G equirc:l? [
_) '.
C.ommon I artment Procedures require
.% [._ _ __ _
Date: d cach a!Tecte Department llea l
l Section 6: POR(ISORCyproval(if requireri) l Approval 3ignature (Unit Director.
~~~
l
. Sr. Vice President and CNO-Millstone Meeting No:
,73 Station. or authorized designee):
~~
-/[)~~
' Effective Date; h h OO
$9 horm DC 1-1, [h?
_ -.JZ.
Station Admin Procedures Group OSCAR Report i 2
Attcchment 3 SERO On-Call Position Listing (Sheet 1 of 1)
)
~
Name On Can Name On Call Positions Positions i
ADEOF U11&CTECH AMTME U1 MECH ARPS U1MOC DSEO U1MOSC EOFHP U1MTSC EOFST U1TSCEE ES U1TSCME lg GTS U2ADTS MOR U2ELEC MPI U21&CTECH MRCA U2 MECH MRDA U2MOC.
NNM l@
U2MOSC RMT3 U2MTSC RMT4 U2TSCEE RMT5 U2TSCME RMTD U3ADTS p
U3ELEC U3l&CTECH RMTA U3 MECH RMTB U3MOC RMTC U3MOSC RMTD U3MTSC TSCRE U3TSCEE lQ U1ADTS U3TSCME U1ELEC i
,-~
C-OP 606 Level of Use Rev. 2 OeneGI STOP.
THINK ACT' HEVIEW 21 of 22 4
+
Attrchment'4 SE' Subject to Call Position Listing (Sheet 1 of 1)
.pb Subject to Call Name Subject to Call Name Positions Positions AMRDA U10SCMA i
AMT/TH U1 TIC AMTL U1TSCSM ERC U2CRDC FTDC U21&COSC EIT U20SCMA MOS U2 TIC PREM U2TSCSM RADCOM U3CRLC U31&COSC RAE U3OSCMA TA U3 TIC UICRDC U3TSCSM Ull&COSC O
V h
('
)
Level Of Use C-oP606 Generai
.STOP THINK ACT REVIEW Rev.2 22 of 22