Proposed Tech Specs to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TSs to TRM
ML20199K486
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/18/1999
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20199K477 List:
References
NUDOCS 9901260429
Download: ML20199K486 (14)


Text

..

. s<

HADDAM NECK PLANT UFSAR 1.6 - ,

MATERIAL INCORPORATED BY REFERENCE

' Previously this section referenced a table that listed topical reports which provided information additional to that provided in the UFSAR and that were filed separately with the Nuclear Regulatory Commission (NRC) in support of this and similar applications. However, since the Haddam Neck Plant has permanently ceased power operations, these topical reports are no longer applicable.

98-45 1.6.1 ' Technical Requirements Manual 1/99 The Technical Requirements Portion (Section 11) of the Technical Requirements Manual (TRM) is incorporated by reference. Changes to the TRM require a 50.59 Safety Evaluation.

l 1

l-L l-l l

i

- 9901260429 990118 Y PDR ADOCK 050002131 January 1999 W PDR ( 1.6-1 i

1S6.SAW Updated 12/23/98 7:23 AM 1

d

  • O . .

,'f Docket No. 50-213 l-

. CY-99-002 l

l l .

l f ..

]

a Attachment 2 Haddam Neck Plant  :

Proposed Revision To The Technical Specifications 1 Approved TRM Section

. (To be implemented with Seismic Monitoring Instrumentation License Amendment)

L

. January 1999 i-e g y - . ,

4 , -

, , - - +

,1

> l.e, a ..

TECHNICAL REQUIREMENTS H.B INSTRUMENTATION l ILB.3.1 SEISMIC INSTRUMENTATION t LIMITING CONDITION FOR OPERATION The seismic monitoring system instrumentation shown in Table 3.3-5 shall be OPERABLE.

APPLICABILITY At all times.

ACTION a) With the seismic monitoring system inoperable for more than 30 days, prepare and submit a Special Report to the Commission pursuant to Specification  !

6.9.2 within the next 10 days outlining the cause of the malfunction and the plans for restoring the system to OPERABLE status.

l ILB.4.1 INSPECTION AND TESTING REOUIREMENTS

1. The above seismic monitoring system shall be demonstrated OPERABLE by i the performance of the CHANNEL CHECK, CHANNEL CALIBRATION, and ANALOG CHANNEL OPERATIONAL TEST at the frequencies shown in Table 4.3-4.

' 2. The above required seismic monitoring system actuated during a seismic event shall be restored to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, and a CHANNEL CALIBRATION performed within 10 days following the seismic event. Data shall be retrieved from actuated instruments and

- analyzed to determine the magnitude of the vibratory ground motion. Ifit is determined that the magnitude of the event exceeded the Operating Basis Earthquake, then a Special Report shall be prepared and submitted to the Commission persuant to Specification 6.9.2 within 14 days, describing the magnitude, frequency, spectrum, and resultant effect on the facility features important to safety.

y 3

(

II.B-1 January 1999 TRMHB-A.sAW

I y*

g  :' ,

TECHNICAL REQUIREMENTS II.h3 INSTRUMENTATION II.B.3.1 SEISMIC INSTRUMENTATION ,

BASES ,

t The OPERABILITY of the seismic instrumentation ensures that sufficient capability is available to determine the magnitude of a seismic event and evaluate the response of those features impor*mt to safety. This capability is required to permit comparison of the measured response to that used in the design basis for the facility.

SAFETY EVALUATION NUMBER Amendment 194 l l

l t

I i

i l l

l 4

W II.B-2 January 1999 i

TRMUD-A.SAW

, 'z w .

TECIINICAL REQUIREMENTS TABLE 3.3-5 SEISMIC MONITORING INSTRUMENTATION
  • MINIMUM INSTRUMENTS INSTRUMENTS AND SENSOR LOCATIONS MEASUREMENT RANGE OPERABI E 1
1. Triaxial Servo Accelerometer 0 to 0.5g 1 (SSA-302) Basemat-Cable Vault
2. DigitalCassette Accelerograph 5 Volts 1  !

(DCA-300)* *  ;

3. Response Spectrum Analyzer 5 Volts I (RSA-50)* *
4. Playback System 5 Volts 1 (SMR-102)*
  • l
5. Seismic Warning Panel N.A. 1 (SWP-300)*
  • l "All located in the Control Room I

5 II.B-3 Janeary 1999 TRMIIB-A.sAW

F, s 3;

,p

TECHNICAL REQUIREMENTS i

TABLE 4.3-4 SEISMIC MONITORING INSTRUMENTATION SURVEILLANCE REOUIREMENTS ANALOG CHANNEL CHANNEL CIIANNEL . OPERATIONAL ,

INSTRUMENTS AND SENSOR LOCATIONS CHECK CAI IBRATION TEST

1. Triaxial Servo Accelerometer M R SA (SSA-302) Basemat-Cable Vault
2. Digital Cassette Accelerograph M R SA (DCA-300)* *
3. Response Spectrum Analyzer M R SA (RSA-50)* * ,

I i

4. Playback System M R SA (SMR-102)* *
5. Seismic Warning Panel M R SA (SWP-300)** ,

1

    • Alllocated in the Control Room i l

l l

l i

r i

I l'

O i

l II.B-4 January 1999 TRM11B-A.sAW

,m'4 * '

j

.. .i

'4. .

  • I i . 1

\

i Docket No. 50-213  :

i CY-99-002 1

'i i

l l

I i

l i

i l

l 1

i Attachment 3 Haddam Neck Plant I

Revised Technical Specification Pages l l

January 1999

,; i ..

1. .t, 4i INDEX

! ~RASFS l SECTION PAGE j t

! I t

L 3/4.0 APPLICABILITY- l l 3.0.1 .......................................................B3/4 01 L 3.0.2 .......................................................B3/4 0-2 1

' 3.0.3 DELETED l

'3.0.4 .......................................................B3/4 0 3 i 4.0.1 .......................................................B3/4 0 4  !

4.0.2 ........................................................B3/4 0-4  ;

4.0.3 .......................................................B3/4 0 4  !

4.0.4 .................... ................................. 83/4 0-5  !'

-. 4. 0. 5 - DELETED

4. 0.6 . DELETED  !

References DELETED l

3/4.1 DFl FTED i i

1 3/4.2 DELETED 1 1

3/4~3 . INSTRlMENTATION 3/4.3.1 DELETED 3/4.3.2 DELETED 4 1

3/4.3.3 MONITORING INSTRUMENTATION i 3/4.3.3.1 DELETED 3/4.3.3.2 DELETED 3/4.3.3.3 DELETED l 3/4.3.3.4- METEOROLOGICAL INSTRUMENTATION.........................B3/4 3 2

-3/4.3.3.5 DELETED

, 3/4.3.3.6-- DELETED t3/4.3.3.7 RADI0 ACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION.............................B3/4 3 3 3/4.3.3.8 RADI0 ACTIVE GASE0US EFFLUENT I. MONITORING INSTRUMENTATION.............................B3/4 3 3 3/4.3.3.9 DELETED  !

3/4.3.4 DELETED- l I

3/4.4 DELETED l

. 3/4.5' DELETED' i 3/4.6- DELETED I

l HADDAM NECK- VI Amendment No.125.158.193.194

- TS-INDEX. DOC

$ -i

, M; f, *-

4 SECTIONS 3.3.1 THROUGH 3.3.3.3:

SECTIONS 4.3.1 THROUGH 4.3.3.3:

TABLES 3.3 1 THROUGH 3.3 5:

TABLES 4.3 1 THROUGH 4.3 4: AND PAGES 3/4 3-1 THROUGH 3/4 3 29 DELETED HADDAM NECK 3/4 3 1 Amendment No.193, 194 TS3S3.00C

.. ~3 l4  ! *.

l . .

INSTRUMENTATION BASES 3/4.3.3 MONITORING INSTRUMENTATION 3/4.3.3.1 DELETED 3/4.3.3.2 DELETED-3/4.3.3.3 DELETED l 3/4.3.3.4 METEOROLOGICAL INSTRUMENTATION 1 The OPERABILITY of the meteorological instrumentation ensures that suffi-cient meteorological data is available for estimating potential radiation doses to the public as a result of routine or accidental release of radio-active materials to the atmosphere. This capability is required to evaluate the need for initiating protective measures to protect the health and safety of the public and is consistent with the recommendations of Regulatory Guide 1.23, "0nsite Meteorological Progran;s," February 1972.

3/4.3.3.5 DELETED 3/4.3.3.6 DELETED

)

l 1

i HADDAM NECK B3/4 3 2 Amendment No.426,179,193,194 TSB353,00C l

.~

..'Q _ .

,e o l#. -

1 ,

Docket No. 50-213 CY-99-002 I i

t l-t l

i i

o i I

i i

t i

l l l i l

\

i Attachment 4  !

Haddam Neck Plant j Proposed Revision To The Technical Specifications Marked-up pages from Amendment 193 l

t-

.' )

i J

January 1999 l-4 l

t-'

. 4

's i .

INDEX l LIMITING CONDITIONS FOR OPERATION AND SURVEILLANCE REQUIREMENTS 1

1 SECTION PAGE 3/4.3.3 MONITORING INSTRUMENTATION......................... 3/4 3-23 1 3/4.3.3.1 DELETED 3/4.3.3.2 DELETED 3/4.3.3.3  ::::"Ic :.":T""".c"TA n 0"............................ :/: : 27 petrTe0 TA"Lt :.3-0 :::=:c "0":T0a:" 1x:T R=t" TAT 0. . . . . . . . . . . . . . . . . . / 2:

  • R" A n . f" *. P r* T AT

. n- m ,A. ,A om.PMTPn.. MAM,

- .T T. .n AM .T .M.F.

. T. .U.P.T.

. . - .nt.lu.f"M..T. m . .T r.hM.

, eo, o w n . . . . . ...u u.nn u n w v4n m w ............................ ,u,

._. . o.. . M.,

3/4.3.3.4 METEOROLOGICAL INSTRUMENTATION..................... 3/4 3-30 TABLE 3.3-6 METEOROLOGICAL MONITORING INSTRUMENTATION.......... 3/4 3-31 TABLE 4.3-5 METEOROLOGICAL MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS.......................... 3/4 3-32 3/4.3.3.5 DELETED l 3/4.3.3.6 DELETED I

3/4.3.3.7 RADI0 ACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION.................................... 3/4 3-44 TABLE 3.3-9 RADI0 ACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION.................................... 3/4 3-45 i TABLE 4.3-7 RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION SURVEILLANCE REQUIREMENTS.......... 3/4 3-47 l

3/4.3.3.8 RADI0 ACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION.................................... 3/43-49 i

l HADDAM NECK VI Amendment No. JJJ. J7).193 0413

h.de..S 4 G Ee mA6ma .m4 4.-4 9M -

3 e

a e e

SECTIONS 3.3.1THROUGH3.3.3./;

SECTIONS 4.3.1THROUGH4.3.3./;

TABLES 3.3-1 THROUGH 3.3-ff f; TABLES 4.3-1 THROUGH 4.3-3; AND. f PAGES3/43-1THROUGH3/43[2.q DELETED .  !

1 l

l e

HADDAM NECK oste

~ . . _ -

,V

.Q 6- .

INSTRUMENTATION BASES 3/4.3.3 MONITORING INSTRUMENTATION l

3/4.3.3.3 - DELET6[)

The OPERABILITY of the ic instrumentat nsures that sufficient I capability is available ~to ine t agnitude of a seismic event and i evaluate the response of those fe es important to safety. This capabili- l ty is required to permit c on o measured response to that used in l the design basis for the lity.

3/4.3.3.4 METEOROLOGICAL INSTRUMENTATION The OPERABILITY of the meteorological instrumentation ensures that suffi-  !

cient meteorological data is available for estimating potential radiation doses to the public as a result of routine or accidental release of radio-active materials to the atmosphere. This capability is required to evaluate ,

the need for initiating protective measures to protect the health and safety '

.of the public and is consistent with the recommendations of Regulatory Guide 1.23, "Onsite Meteorological Programs," February 1972. ,

I l

i i

l i

l I

1 NADDM NECK B3/4 3-2 Amendment No. 177, 17), 193 esas j