NUMBER TTT12 REY. !$SLTJDATE FR.C.2 RESPONSE TO DEGRADED CORE COOLING Rev. 2 i

A.

PURPOSE l

Dis procedure provides acdons to restore adequate cca cooling.

B.

SYMPTOMS OR ENTRY CONDITIONS Dis procedure is entered from F 0.2, CORE COOLING Critical Safety Function Status Tree, on and ORANGE condition.

I I

Page 1 of 7 8810250297 estooy p

ADOCK 05000213 J

DR PDR

JUN 3'988 NUMBER Tm2 REY. ISSUE /DATE FR C.2 RESPONSE TO DEGRADED CORE COOLING Rev.2 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED l

r

,i CAUTION:

IF THE RWST LEVEL DECREASES TO LESS THAN 130.000 GALLONS, THE SI SYSTEM SHOULD BE AUGNED FOR RHR RECIRCULATION USING ES 1.3, TRANSFER TO RHR RECIRCULATION.

L J

l i

VERIFY SI VALVES IN PROPER hiANUALLY ALIGN VALVES AS l

EhiERGENCY ALIGNhtEST NECESSARY.

E SI VALVES b'QIOPERABLE, l

HEN USE FILL llEADER BY j

PERFORMING TiiE FOLLOWING:

a. Open all four loop fill header MOVs.
b. Open fill header flow control valve, Fli FCV 295, and bypass valve, Fli MOV 344.
c. Start both charging pumps
d. Close Cil MOV 292B and Cil.MOV 292C.

2 VERIFY SI FLOW IN ALL DIAINS:

a. Check charging pump flow
a. Start charging pumps and aligt valves indicators -

as necessary.

INDICADI FLOW

b. Check }{PSIpump AMPineters-
b. Start liPSI pumps and align valves GREATER TIIAN 115 AhtPS as necessary.

E SI MOVs NQIoperable DIEN use fill header valves.

c. Check RCS pressure -
c. QQIQ Step 3.

LESS TliAN 405 PSIG (635 PSIG FOR ADVERSE CONTAINMENT)

d. Check LPSI pump AMP meters -
d. Start LPSI pumps and align valves GREATT.R DIAN 60 AMPS as necessary.

Page 2 of 7

JUN 3 1988 NMiBER TTIM REY. ISSUE /DATE FR.C.2 RESPONSE TO DEGRADED CORE COOLING Rev.2 1

i STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 3

CHECK RCS VENT Aht DRAIN PATHS CLOSED:

a. Check power to PRZR PORY
a. Restore power to PRZR PORY block valves -

block valves.

1 AVAIIABLE

b. Check PRZR PORVs CLOSED
b. hianually close PR2R PORVs.

IE any PORY can HQIbe closed.

311EM manually close its block valve.

?

c. Check other RCS vent paths -
c. hianually OR locally close any open CLOSED RCS vent paths.
d. Check drain header-ISOLATED
d. Close all fourloop drain header h10Vs.
e. Checkletdown ISOLA 11?D
e. Close letdown isolation valve LD htOV 2CY).

I i

i l

j l

I Page 3 of 7

JUN 3 1988 NUMBER EH REY. ISSUE /DAE FR.C.2 RESPONSE TO DEGRADED CORE COOLING Rev.2 STEP ACTION /EXPECIED RESPONSE RESPONSE NOT OBTAINED NOTEt NORMAL CONDITIONS FOR RUNNING RCPs ARE DESIRED, BUT RCPs SHOULD NOT BE TRIPPED IF NORMAL CONDITIONS CANNOT BE ESTABUSHED OR MAINTAINED.

4 CHECK RCP STATUS:

a. Check at least one iJ RUNNING
a. QQIQ Step 7.
b. Check s systems for the
b. Try to establish support systems for operatin cps -

the operating RCPs.

AV BII:

o Component cooling water system tn se m ce RCP seal water supp return systern in sem,1y and o

cc 5

CIIECK RVLIS INDICATION:

a. Check plenum indication -
a. E increasinJ.

GREATER 'IIIAN 15 %

111EN RETJRNIQ Step 1.

i E NOIincreasing, j

T11EN QQIQ Step 6.

b. PEI1TRNIQ procedure and step in effect 6

CIIECK IF ONE RCP SHOULD BE STOPPED:

n. Check all RCPs - RUNNING
a. QQ IQ Step 8.
b. Stop # 4 RCP 1

I

c. QQIQ step s i

l i

Page 4 of 7

JUN 3 1988 NUMBER 1 TIM REV. ISSUE /DATE FR C.2 RESPONSE TO DEGRADED CORE COOLING Rev.2 STEP ACT10N/ EXPECTED RESPONSE RESPONSE NOT OBTAINED 7

CIECK CORE COOLING:

a. Check RVLIS plenum indication -
a. E increasing, GREATER THAN 15 %

THEN RETURNIQ Step 1.

E EDIincreasing.

THEN QQIQ Step 8.

b. Check core exit thermocouples -
b. E decreasing.

LESS THAN 700' F TIEN REIURNIQ Step 1.

E NOIdeereasin,

311EN QQIQ St 8.

c. RETURNIQ procedure and step in effect r

1 CAUTION:

o MONITOR DWST LEVEL. START MAKEUP TO DWST BEFORE LEVEL DECREASES TO $4,000 GALLONS.

o A FAULTED OR RUPTURED SG SHOULD NOT BE USED IN SUBSEQUENT STEPS UNLESS NO INTACT SG IS A VAILABLE.

l L

J r

8 CHECKIhTACT SG LEVELS:

a. Check wide range levels -
a. Increase total AUX feedwate!ifou GREATER THAN 63 %

to restore wide range level in at least (67 % FOR ADVERSE one SG to greater than 63 %

CONTAINMENT)

(67 % for adverse containment).

b. Control AUX feedwater flow to i

maintain wide range levels between 63 % and 69 %

(67 % and 69 % for adverse 3

containment) l l

I Page 5 of 7 i

l l

\\

\\

JUN 312 bMGER mu REV. lSSUESATE FR.C.2 RESPONSE TO DEGRADED CORE COOLING Rev.2 STEP l ACTION /EXPECED RESPONSE RESPONSE NOT OBTAINED 9

DEPRESSURIZE ALL LYrACT SGs TO 200 PSIG:

a. Maintain cooldown rate in RCS cold legs -

LESS '11AN 100* F/ HR

b. Dump steam to the condenser
b. Manually DR locally dump steam using one DR more of the following:
1. Atmos sheric vent valve.
2. Terry "urbine steam supply valves.
3. Hog Jet steam supply valves,
c. Check SG pressure -
c. RETURN IQ Step 8.

LESS THAN 200 PSIG 10 CHECK LPSI PUMPS RUNNING START PUMPS AS NECESS ARY.

r N

CAUT1ON:

SYMPTOMS FOR FR C.!, RESPONSE TO INADEQUATE CORE C00UNG, SHOULD BE CLOSELY MONITORED DURING SUBSEQUENT STEPS.

L J

l1 STOP ALL RCPs:

a. Close all four seal water return MOVs
b. IE containment pressure is greater than 5 PSIG, 11EN perform the follwing:
1. Close CH TV 240, CH TV 241 (Seal water return trip valves) i
2. Close CC-TV 1411 (CCW rerum from RCP oil coolers) l l

l l

Page 6 of 7 l

i

JUN 3 1988 NUMBER

ai d REY. ISSUESAE FR.C.2 RESPONSE TO DEGRADED CORE COOLING Rev.2 SEP ACTION /EXPECED RESPONSE RESPONSE NOT OBTAINED 12 DEPRESSURIZE ALLINTACT SGs TO 50 PSIO:
a. Maintain cooldown rate in RCS cold lejis -

LESS 'llAN 100* F/ HR

b. Dump steam to the condenser b.

Manually DR locally dump steam using one OR more of the following:

l

1. Atmosaheric vent valve.
2. Terry Turbine steam supply valves.
3. Ilog Jet steam supply valves 13 VERIFY SI FLOW:

CONTINUE EFFORTS TO ESTABLISH SI FLOW.

o Check charging line flow TIEN RERTRNIQ STEP 12.

indicators INDICNTE FLOW 2

o Check IIPSI pump AMPS -

GREATER TIIAN 115 c,MPS 2

o Check LPSI puma AMPS -

GREATER THA 9 60 AMPS 14 ClECK CORE COOLING:

RETURNIQ STEP 12.

o Check RVLIS plenum indication -

GREATER *IllAN 15 %

o Check at least two hot leg t

tures -

S THAN 350' F 15 QQIQ E 1, LOSS OF REACTOR OR SECONDARY COOLAhT, STEP 12 END l

Page 7 of 7