MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes 05000423/LER-1998-002, Proposed Tech Specs Bases Section 3/4.5.2,clarifying SRs That Ensure That ECCS Piping Is Full of Water,As Committed to in LER 98-002-00,dtd 9802071998-12-21021 December 1998 Proposed Tech Specs Bases Section 3/4.5.2,clarifying SRs That Ensure That ECCS Piping Is Full of Water,As Committed to in LER 98-002-00,dtd 980207 ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program ML20154G5311998-10-0707 October 1998 Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review ML20154G5351998-10-0606 October 1998 Rev 3 to Project Procedure PP-04, Regulatory Review Procedure ML20154G5521998-10-0606 October 1998 Rev 5 to Project Instruction PI-01, Svsr Implementation Checklists & Workbook ML20154G5391998-10-0606 October 1998 Rev 6 to Project Procedure PP-07, Discrepancy Repts ML20154G5251998-10-0505 October 1998 Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan ML20236Q9341998-06-30030 June 1998 Rev 4 to PI-01, Sys Vertical Slice Review Implementation Checklists & Workbook ML20236Q9321998-06-25025 June 1998 Rev 4 to PP-01, Sys Vertical Slice Review ML20153C6221998-06-18018 June 1998 Rev 1 to CP 3804L, PASS Containment Air Sample ML20153C6171998-06-18018 June 1998 Rev 2 to CP 3804K, PASS Rcs/Rss Sample ML20153C6291998-05-31031 May 1998 Rev 0,Change 1 to CP 3804M, PASS Ventilation Samples ML20247R7851998-05-20020 May 1998 Rev 1 to Epop 4455C, Technical Assistant ML20247Q6901998-05-20020 May 1998 Rev 1 to Epop 4475A, External Resources Coordinator ML20247R8081998-05-20020 May 1998 Rev 1 to Epop 4455F, Rumor & Inquiry Control ML20247Q7011998-05-20020 May 1998 Rev 1 to Epop 4490, Implementation of Recovery Operations ML20247Q6771998-05-20020 May 1998 Rev 1 to Epop 4428I, Direction of Posl Field Sampling ML20247R7491998-05-20020 May 1998 Rev 1 to Epop 4455, Manager of Public Info ML20247R7541998-05-20020 May 1998 Rev 1 to Epop 4455A, Nuclear News Manager ML20247R7921998-05-20020 May 1998 Rev 1 to Epop 4455D, News Releases ML20247Q6671998-05-20020 May 1998 Rev 1 to Epop 4422A, Thermal Hydraulic Evaluation Methods ML20216B1791998-05-0808 May 1998 Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary ML20247H4581998-04-0909 April 1998 Rev 19 to EOP 35 E-0, Reactor Trip or Safety Injection ML20216K0641998-03-20020 March 1998 Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program ML20216H7101998-03-13013 March 1998 Independent Corrective Action Verification Program Status Rept ML20216H7191998-03-0303 March 1998 Independent Corrective Action Verification Program Status Rept ML20203F6931998-02-20020 February 1998 Rev 6 to PI-MP3-11, Discrepancy Rept Submittal & Closure ML20203E2131998-02-19019 February 1998 Cancelled Rev 26 to 1-OPS-10.11, Locked Valve List ML20203D4111998-02-18018 February 1998 Revised 1-OM-index Unit 1 Operations Dept OM Index & Rev 2 to OM 3.8, Millstone Unit 1 Operations Manual ML20203F6601998-02-16016 February 1998 Rev 5 to Audit Plan for Independent Corrective Action Verification Program ML20203F6751998-02-16016 February 1998 Rev 2 to PI-MP3-07, Review of Accident Mitigation Systems ML20216H7351998-02-11011 February 1998 Independent Corrective Action Verification Program Status Rept ML20203H3271998-02-0505 February 1998 Restart Assessment Plan Millstone Station 1999-05-10
[Table view] |
Text
.
t
\\.
I MILL 61 ONE NUCf. EAR ?OWER STATION EMERGENCY PIAN OPERATING l'ROCEDURE l
e A
l A
jk%
l M
kg, fB ne%g v rQnwy l
TOP'
. z* HINK' ny~ /-\\ywn
~;;
yme y
w
,a CT" EVIEW r
.: mgm yya ag,g4y g,y ag
%;y jy ; +
r., yxn u
'%f, y
7"i q, j
sg 1
J r
l t
Direction of POSL Field Sampling EPOP 44281 Rev.I l
m l
)
l
\\
l
\\x l
Approval:
_A2A
/
SORC Mtg. No:
98 250 Date:
6-)&C T i
1 Effective Date:
CS-969T 1
l Level of Use f
Information SME: M. White i
9805280313 980520
~--
~ - -
i PDR ADOCK 05000245 F
PDR l
J
1 Millstone All Units 1
N p 1;/
Emergency Plan Operating Procedure 1
w/
Direction of POSL Field Sampling TAB.LE OF CONIENTS.
1.
PURPOSE..................................................2 1
2.
P R E R EQ U I S ITES.............................................. 2 3.
P R E CAU TI O N S..........................................,...
2 l
u 4.
I N ST R U CTI O N S..............................................
3 1
4.1 Sample Location and Schedule..............................
3 4.2 Analytic Requirements...................................
3 4.3 Laboratory Select;on...................................... 3 4.4 Preparation and Transmittal of Sample Requests...............
4 4.5 Sample Delivery Confirmation, Analytic Results, and TLD Results 4 4.6 Ingestion Pathway to Sampling............................... ' 4 5.
REVI EW AN D SIGNO FF..............,.......................
6 -
g.,
tv 6.
R E FE R EN CES.................................................
6 7.
S U M M A RY O F CH ANG ES.....................................
6 1
ATTACHMENTS AND FORMS l
\\ " Sample Location Reference '11tble"...................
7 " Millstone Guidance on Survey Strategy"...............
8 " Record of Requested Environmental Samples".........
9 lI " Field TLD Data"................................
10 Level of Use EPOP 44281 Information sToP THINK ACT REVIEW Rev.1 1 of 10 l
=
p l
l
- 1. PURPOSE
.o 1.1 Objective Provide guidance for recommending sampling requirements to the Production Operations Services Laboratory field teams and provide forms for recording requests and results.
~
1.2 Discussion RMTs provide the off-site survey information necessary for the plume l
phase. POSL sampling is reserved more for the relocation and ingestion pathway phase and, therefore, would typically not be performed until the plume has passed. Thermoluminescent dosimeters and air filters may also provide information to help determine the past integrated dose.
- 2. PREREQUISITES 2.1 General N/A 2.2 Documents rQ 2.2.1 EPUG-08B,"MP Emergency Plan Resource Book" 2.2.2 Radiological Calculation Reference Manual 2.3 Definitions 2.3.1 MDL - Minimum detectable level 2.3.2 MRDA - Manager of Radiological Dose Assessment i
2.3.3 POSL - Production Operations Services Laboratory 2.3.4 RMT - Radiation Monitoring Team 2.3.5 TLD - Thermoluminescent dosimeter l
- 3. PREC.AUTIONS N/A l
l
' Q U
Level of Use EPOP 4428I STOP THINK ACT REVIEW Rev.I Information 2 of 10 l
r
- 4. INSTRUCTIONS
.C^
i 4.1 Sample I.acation and Schedule l
4.1.1 Refer To the following, as applicable, and DETERMINE sampling locations:," Sample Location Reference Table"
- , " Millstone Guidance on Suivey Strategy" 4.2 Analytic Requirements l
4.2.1 DETERMINE the following analytic requirements for each sample:
HPGe or Nal Iodine chemistry Strontium chemistry Tritium NOTE Although lower MDLs are desirable, MDLs for emergency samples are generally specified a factor of ten higher than those for routine samples to account for sample loading at the laboratory.
4.2.2 DETERMINE required MDLs.
4.3 Laboratory Selection NOTE
)
Radio-analytic laboratories are listed in EPUG-08B, "MP Emergency Plan Resource Book."
4.3.1 SEND samples to primary contractor for analysis.
r
> d EPOP 4428I j
Level of Use STOP THINK ACT REVIEW Rev.1 lnformation 3 of 10
4.3.2 OBTAIN assistance from additional contractor, as necessary.
.AC 4.3.3 CONSIDER counting some split samples in-house for a quality control check on the contractor.
4.4 Preparation and Transmittal of Sample Requests 4.4.1 Refer To Attachment 3," Record of Requested Environmental Samples," and RECORD sample determinations.
4.4.2 OBTAIN MRDA approval for sample requests.
4.4.3 FAX Attachment 3 to POSL and RECORD indiv.idual contacted and time.
4.5 Sample Delivery Confirmation, Analytic Results, and TLD Results 4.5.1 REQUEST POSL to confirm samples have been delivered to laboratory.
4.5.2 RECORD laboratory results of field sample analysis on.
4.5.3 RECORD TLD results on Attachment 4, and PERFORM pQ indicated calculation.
4.6 Ingestion Pathway Sampling 4.6.1 Refer To the " State of Connecticut Agency Procedures," and REVIEW the following:
)
Ingestion pathway sampling strategies Kit contents Sample tagging Sample location identification methods OV EPOP 44281 Level of Use STOP THINK ACT REVIEW Rev.1 lnformation 4 of 10
i 4.6,2 COORDINATE sampling strategies with the following State of
(-)
Connecticut sampling teams:
,v Department of Public Health Department of Agriculture Department of Consumer Protection S
,~,
(C) l Level of Use EPOP 44281 Information STOP THINK ACT REVIEW Rev.1 5 of 10
- 5. REVIEW AfiDJIGNOFF
'.'U)
N/A
- 6. REEERENCES 6.1
" Millstone Nuclear Power Station Emergency Plan" 6.2
" State of Connecticut Radiological Emergency Response Plan" 6.3
" State of Connecticut Inge. tion Pathway Data Base"
- 7.
SUMMARY
OF CHANGES 7.1 Changed the level of use from General to Information.
7.2 Changed procedure from an NU common procedure (NUC EPOP) to a Millstone Nuclear Power Station Emergency Plan Operating Procedure l
(EPOP) 7.3 Deleted references to CY in all applicable locations.
7.4 Added RMT, MRDA, and POSL to the definitions section.
(Cl 7.5 Updated references section.
,m
(' ')
Level of Use EPOP 44281 lnformation STOP THINK ACT REVIEW Rev.1 6 ci 10
y y
n y
c o
c n
i n
e e
s s
I t
g a
g p
p 8
t r
a a
2 r
S e
s 4
e m
m pM M
4 re a
d d
P E
w E
Mi i
O n
o n
r r
G G
P o
P o
ns ER i
i r
o e e
t t
a a
a
.li l
i S
a m i
t e
t t
S S
m l
P c
c r
u r
o -
A e
e M
w N
L 0_
0 w
o e
o g 5_
5 t
t P
n P
n u
u o
i c
c r
l r
a s
a pi t
i t
t e
mc c
e i
l lc d
a e e
i u
M u;
S n n
n n
N r
d o o
o "p
e C C
e f
t n
c f f
o M
e o o
l t
I s
C e e e
s D
e a a
t t
r t
t e
O P S S
W lb E
a V
I T
e e
y y
E h
h a
a R
w w
e t
t c
s r
r d
o o
h h
n t
t n
f f
e a
a 1 r u
)
)
t P
P T
r o
M M
o n
n AC t
e) r nf 1
ef g
C C
p o
o rwmRo e
k e
i i
c D
D R
s s
t t
O' O
e e
a 1
nt b
h l
e
(
(
a g
g c oe r
u n
n l
l t
S S
e a
a n
K aih i
I I
ta(
h u
u n
N l
l c
N nn n n a
a I
t ao ao A
i i
t Ao O
d c
c H
I n
Mt Mt n
g g
T i
i L
o o
a a
T a
i t
t l
nS nS o
lo s
e A
s p
C n
o o
u l
i i
i r r
s d
d i
o t
e t
e n
a a
P m
O a w aw e
i c
R)
R)
O t
l L
a uo uo T
l a
t 5 t 5 S
c cP cP S
o t
a u1 u1 l
l ar ar o
i3 i3 c
c l
D Ca Ca g
t t
e e
c f.
c f.
L el el d
e e e e s c s c n
nR nR T
ou ou a
n n
y DN DN d
o (e o (e e
s c
w Cs Cs n
ee e e tc n
t n o
e f a f a t
e i
i c
oB oB g
So So r
r t
t i
y e
l l
d r
ea ea s
s fl fl i
t t t t m
s a
aa aa fi f i E
OM OM A
D SD SD t
t e
)
n s
s r
s s
i d
a o
E o
r l
s P
G it Y
e u
)
c nc r)
T s
s r
E D
e ie u
Fr e n ot i
t e
s o L
L t
a t
,t a u s
s a Ui w
a leW t
q P
T luA gn eo P
a f
c
(
b(
M
,Q om a
i eS r
t A
t r
\\
o e
le o r
a S
P k
g vf a
e l
V en r
iM LI i
L A
Millstone Guidance on Survey Strategy (Sheet 1 of 1)
(v)
For MP1 Stack Releases Use the 374' met data For Rooftop Releases Use the 142' met data For Ground Releases Use the 33' met data DAYTIME - Wind Speed Less than 5 mph (2m/sec)
Survey in downwind sector and 3 sectors to each side DAYTIME - Wind Speed Greater than 5 mph (2m/sec)
Survey in downwind sector and 1 sector on each side C)
C' NIGIITTIME - Wind Speed Less than 2 mph (lmisec)
Suivey in downwind sector and 2 sectors on each side NIGIITTIME - Wind Speed Greater than 2 mph (Im/sec)
Survey in downwind sector and 1 sector on each side r
)
EPOP 44281 Level of Use STOP THINK ACT REVIEW Rev.1 Information 8 of 10 l
D STE LV UIE 1
(
S C 8
E E 2
R 4
R 4
P EYY O
v.
P e MBR D O ER IT E T
&V A R
I EEO TCB AE A DR l
D JFE E
T TM C
AI A
DT T
s N
e O
l p
C E
w m
L M
S A
a O
W S
P E
I V
l a
E n
D y
R t
S E B
e E T d
m S S e
XE 3 n w
T I
t o)
A U e
C n r1 NQ v
A i
A E e
i f c
v o R
R mn1 t
hEt e
c e
adh B
K t
eS N
A I
(
t t
A s H
I e
T u
q U' R,
e A
G R
ON P
WF f
O IL o
T OMM P
S d
R r
A I
o MT S
c e
A R
)T N N OA LP A
M O
R F
(
S NA OFR I
T A e n A
s o CR Ui O
y
)
t J
B f
a FE e
lom I
d r
OL m
e o I.
P r
vf EPM o
en f
LI YA r
TS e
P Il l
l Field TLD Data i.
(Sheet 1 of 1)
]
O l
LOCATION TIME PERIOD CORRECTED FIELD (liR) l BACKGROUND TIME IN PL. ANT PLANT
-l IN FIELD pR/liR pR/liR' CONTRIBUTION RELATED
{
FROM-TO A
B C
pR/liR DOSE mR A-C
' (A-C) xB/IO00 l
l l
l l
l l
l i
- See Radiological Calculation Reference Manual for listing of emergency TLD locations and their background radiation dose levels.
O Level of Use EPOP 44281 l
Information STOP THINK ACT REVIEW Rev.1 10 of 10