Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes 05000423/LER-1998-002, Proposed Tech Specs Bases Section 3/4.5.2,clarifying SRs That Ensure That ECCS Piping Is Full of Water,As Committed to in LER 98-002-00,dtd 9802071998-12-21021 December 1998 Proposed Tech Specs Bases Section 3/4.5.2,clarifying SRs That Ensure That ECCS Piping Is Full of Water,As Committed to in LER 98-002-00,dtd 980207 ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program ML20154G5311998-10-0707 October 1998 Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review ML20154G5351998-10-0606 October 1998 Rev 3 to Project Procedure PP-04, Regulatory Review Procedure ML20154G5521998-10-0606 October 1998 Rev 5 to Project Instruction PI-01, Svsr Implementation Checklists & Workbook ML20154G5391998-10-0606 October 1998 Rev 6 to Project Procedure PP-07, Discrepancy Repts ML20154G5251998-10-0505 October 1998 Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan ML20236Q9341998-06-30030 June 1998 Rev 4 to PI-01, Sys Vertical Slice Review Implementation Checklists & Workbook ML20236Q9321998-06-25025 June 1998 Rev 4 to PP-01, Sys Vertical Slice Review ML20153C6221998-06-18018 June 1998 Rev 1 to CP 3804L, PASS Containment Air Sample ML20153C6171998-06-18018 June 1998 Rev 2 to CP 3804K, PASS Rcs/Rss Sample ML20153C6291998-05-31031 May 1998 Rev 0,Change 1 to CP 3804M, PASS Ventilation Samples ML20247R7851998-05-20020 May 1998 Rev 1 to Epop 4455C, Technical Assistant ML20247Q6901998-05-20020 May 1998 Rev 1 to Epop 4475A, External Resources Coordinator ML20247R8081998-05-20020 May 1998 Rev 1 to Epop 4455F, Rumor & Inquiry Control ML20247Q7011998-05-20020 May 1998 Rev 1 to Epop 4490, Implementation of Recovery Operations ML20247Q6771998-05-20020 May 1998 Rev 1 to Epop 4428I, Direction of Posl Field Sampling ML20247R7491998-05-20020 May 1998 Rev 1 to Epop 4455, Manager of Public Info ML20247R7541998-05-20020 May 1998 Rev 1 to Epop 4455A, Nuclear News Manager ML20247R7921998-05-20020 May 1998 Rev 1 to Epop 4455D, News Releases ML20247Q6671998-05-20020 May 1998 Rev 1 to Epop 4422A, Thermal Hydraulic Evaluation Methods ML20216B1791998-05-0808 May 1998 Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary ML20247H4581998-04-0909 April 1998 Rev 19 to EOP 35 E-0, Reactor Trip or Safety Injection ML20216K0641998-03-20020 March 1998 Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program ML20216H7101998-03-13013 March 1998 Independent Corrective Action Verification Program Status Rept ML20216H7191998-03-0303 March 1998 Independent Corrective Action Verification Program Status Rept ML20203F6931998-02-20020 February 1998 Rev 6 to PI-MP3-11, Discrepancy Rept Submittal & Closure ML20203E2131998-02-19019 February 1998 Cancelled Rev 26 to 1-OPS-10.11, Locked Valve List ML20203D4111998-02-18018 February 1998 Revised 1-OM-index Unit 1 Operations Dept OM Index & Rev 2 to OM 3.8, Millstone Unit 1 Operations Manual ML20203F6601998-02-16016 February 1998 Rev 5 to Audit Plan for Independent Corrective Action Verification Program ML20203F6751998-02-16016 February 1998 Rev 2 to PI-MP3-07, Review of Accident Mitigation Systems ML20216H7351998-02-11011 February 1998 Independent Corrective Action Verification Program Status Rept ML20203H3271998-02-0505 February 1998 Restart Assessment Plan Millstone Station 1999-05-10
[Table view] |
Text
...
.C 1
NDS Document Transmittal #112276 1/13/99 l
To:
Nuclear Regulatory Commission Addressee uniques 140 Document Control Desk ROUTINE distribution Washington, D.C. 20666 r
The following documents have been revised. You are currently on distribution for these documents. Verify that all documents are included in this distribution set.
DOCUMENT REV COPIES RPM 2.3.4 2
1 l
l l
t l.
}Y 9901200308 990113 PDR ADOCK 05000245 y
PDR
~
+
Sign and return this form as soon as received to: Diano ONeil x2451, NDS/CDL, B433-1, Millstone or FAX (860) 444-5711.
Signature Date:
1-l
ab MILLSTONE NUCLEAR POWER STATION HEALTH PHYSICS SUPPORT PROCEDURE Inspection and Maintenance Process for Respiratory Protection Equipment RPM 2.3A Rev. 2 -
A 4-3
.s Thhroced0re establisidh a quality assurancehogram for respiratdIy O
protection ejulpment. $.f*i g%.
f 1-
,er w n + nn n,e y re-.p g womw me tqwar w mwgh < %nnw
'Q, x --,P '
'% lrHINK5 Q Q:P
$,1EVIEW TO e
.n.
s' S
7 1
y y
q y
x y
o, y
A Approval:
/
SORC Mtg. No:
N/A Date:
'//1/fe, Effective Date:
1/18/9 9 O
Level of Use SME: Ira L. Haas Information m
eo.
i I
i h
Millstone All Units i
~J Health Physics Support Procedere Inspection and _ Maintenance Process for Respiratory Protection Equipment TABLE OF CONTENTS 1.
INSTRU CTIONS.............................................
2 1.1 Ins?cetion and Maintenance Frequency Flowchart anc Table Upd at e........................................
2 1.2 Inspection and Maintenance Performance...................
3 2.'
R E FER EN CES................................................
5 3.
CO M M ITM ENTS..............................................
5 4.
SUMMARY
O F CHANG ES.....................................
5 l
ATI'ACHMENTS AND FORMS-," Inspection and Maintenance Frequency Flowcharts and Tab',es"..........................
7
- md l
l xi, n,)
l" Level of Use
~ ~ STOP "
TSINK NOT'22 REVIEW.-
RPM 2.3.4 Rev. 2 Informat. ion 1of12
J 1
- 1. INSTRUCTIONS By performing inspections and maintenance on respiratory protection equipment, Millstone Station will ensure operability of its respiratory protection equipment. This ensures personnel protection against airborne contaminants when using respiratory protection equipment correctly.
i 1.1 Inspection and Maintenance Frequency Flowchart and Table Update
)
1.1.1 ~
WHEN any of the following conditions occur, Go To step 1.1.2:
Manufacturer instructions are revised Government regulations are revised Historical data dictates a review New types of equipment are obtained 1.1.2 Refer To Attachment 1 and PERFORM the following:
a.
REVIEW Attachment I for affected flowchart or table.
b.
ENSURE inspection and maintenance intervals are correct as specified in the following guidelmes:
Manufacturer instructions Government regulations Historical data c.
ENSURE routine inspections and maintenance are performed at regular, scheduled intervals.
d.
UPDATE affected portions of Attachment I as required.
1 I
l I
RPM 2.3.4 Level of Use
-'STOP THINK ACT' REVIEW Rev. 2 lnformation 2 of 12
p l
~
j.'
i l
1.2 Inspection and Maintenance Performance i
1.2.1 DETERMINE from the following list the type of equipment to be inspected:
l Full Facepiece or Half Mask Respirator Powered Air-Purifying Respirator Units Hip-Aire Breathing Apparatus Scott Self-Contained Breathing Apparatus
=
Abrasive Blasting Respirator Assembly Bubblehoods or TYVEK Hoods - Air Supplied or Powered Air Purifying Filter Cartridges and Canisters
=
Breathing Tubes, Air Lines, Air Supply Hoses, Duo-Flow Adapters
~
E equipment being inspected is not listed in step 1.2.1, 1.2.2 CONTACT Health Physics Supervision.
1.2.3 E equipment is one of the following, DETERMINE if equipment status is in-service or stored:
Full Facepiece or Half Mask Respirator Powered Air-Purifying Units l
l i
RPM 2.3.4 Level of Use "stOP THINK ACT REVIE%i Rev. 2 Information 3 of 12
.~
h 1.2.4 Refer To Attachment I and the following list and SELECT d
flowchart or table that applies to equipment type and status:
Flowchart 1,"MSA Full Facepiece or Half Mask Respirator" i
Flowchart 2,"MSA Powered Air-Purifying Respirator l
Units" Flowchart 3,"MSA Hip-Aire Breathing Apparatus"
{
Flowchart 4," Scott Self-Contained Breathing Apparatus" i~;o vchart 5,"Bullard Abrasive Blasting Respirator Assembly" Table - 1,"Bubblehoods or TYVEK Hoods - Air Supplied or Powered Air Purifying" Table - 2," Filter Cartridges and Canisters" 1.2.5 OBTAIN and REVIEW equipment history file record.
1.2.6 Based on the following, SELECT from applicable flowchart or
\\
table the activity to be performed g
Previous activities documented on RPM Form 2.3.5-1,
" Equipment History Record."
Previous activities documented on RPM Form 2.3.5-2,
" Air-Supplied Component History Record."
Past equipment use i
Future equipment use i
1.2.7 ASSIGN personnel to perform required activity.
1.2.8 MONITOR activity performance and ENSURE all required activities are performed.
L, 1.2.9 DOCUMENT activities performed on RPM Form 2.3.5-1,
" Equipment History Record," or on RPM Form 2.3.5-2,
" Air-Supplied Component History Record."
l0 a
RPM 2.3.4
)-
Level of Use SToP" THINK- - -
-ACT REVIEW Rev. 2 Informat. ion 4 of 12 l
l
- 2. REFERENCES 2.1 10CFR20," Standards for Protection Against Radiation" 2.2 29CFR1910, " Occupational Safety and IIcalth Standards" 2.3 NUREG 0041," Manual of Respiratory Protection Against Airborne Radioactive Materials" 2.4 Regulatory Guide 8.15," Acceptable Programs for Respiratory Protection" 2.5 ANSI Z88.2-1992, "American National Standard for Respiratog Protection" 2.6 RPM Form 2.3.5-1, " Equipment IIiston Record" 2.7 RPM Form 2.3.5-2," Air-Supplied Component liistory Record"
- 3. COMMITMENTS N/A
- 4.
SUMMARY
OF CHANGES I
4.1 Changes in Attachment 1:
4.1.1 Changed Flowchart Number 1 In-Service Inventory from quarterly to monthly and reformatted steps to comply with 29CFR1910.
4.1.2 Deleted time frame for Hydrostatic Test from Flowchart Number
- 3. This test is dependent on cylinder type and is discussed in RPM 2.3.5.
4.1.3 Deleted "(Posichek)" from " Functional Check (Posichek)" in Flowcharts Number 1,3 and 4.
4.1.4 Changed titles of cylinders in Flowchart Number 4 to distinguish composite cylinders and fiberglass wrapped cylinders as these two types of cylinders have different inspection criteria.
4.1.5 Deleted Table -3," Breathing Tubes, Air Lines, and Air Supply Hoses," because these items are all inspected prior to use and it is unnecessary to perform the inspection twice.
Level of Use
'STOP THINK ACT NEVEW I
Information 3 of 12
m, 4.2 Deleted the words " Quality Assurance Program" from procedure title as
)
this gives the wrong impression of the procedure's objective. It was replaced with the more accurate title " Inspection and Maintenance Process..."
4.3 Added Basis information that changes or revisions to this procedure must be processed through the Emergency Planning Services Department to complete a reduced effectiveness review in accordance with 10CFR50.54(q).
1 7.,
N.
r-RPM 2.3.4 Level of Use sToP THINK ACT REVIEW Rev.2 Informat. ion 6 of 12
Attcchment 1 i
Inspection and Maintenance Frequency Flowcharts and Tables (Sheet 1 of 6) f k
Flowchart Number 1 - MSA Full Facepiece or hii Mask Respirator v
Initial Receipt Inspection
~~
Visual l
Drawn hom n ; k inspecdon l
Storeroom V
II l
Wash
q l
j To Activate l
l New Storage p
(Warehouse 9) l U
l 4--
Repair or Leak Check -+
Maintenance l
V l
In-Senice <
Sanitize
> Active Storage i
h A
',,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,l
{
issue Y
fReturn Return Visual Fit Check l
=
Wash c
Flowcharts j
a 3
l Inspection l
2 and 3 r]
l
':g Worker Responsibility l
y i
Survey lI Leak Check
& Sanitize V
i monthly Visual Annually Inventory O
+
Inventory c
(If not used) p-----
Inspection or To Place In-Senice Repair or 4--
Leak Check Maintenance --->
& Sanitize On a periodic basis, respirators should be cycled between active storage and in-service.
l
.O
- (,)
RPM ~' 3'4 Level of Use
'STOP THINK '
-ACT-REVIEW r
Information Rev. 2 s
7 of 12 l
l l
=_
i Antachment 1 i
i Inspection and Maintenar.ce Frequency Flowcharts and Tables
'g (Sheet 2 of 6)
Flowchart Number 2 - MSA Powered Air-Purifying Respirators Units Initial Receipt Inspection l
Drawn from Visual l
m Storeroom A;"
Inspection
~ ~ ~ ~ ~ "'~ ~l l
1 1
V If Y
l l
To Activate l
Operational Check 4--
Repair or f
New Storage (Warehouse 9) l (Field Test Unit)
-+
Maintenance
)
i 1I I
Batteries / Charges g---
ge,,.2 or l
---+
M.antenance V
in-Senice 4
Install Accessories 45-
> Active Storage (Filters, Belt, Cover)
PAPR Blowers Issue t
y
.h Return i
Flo' Check +
Visual Clean / Wipe Inspection Down 1f Flowchart I Suney lf Visual 4
inventory
< A""""U inspection or To Place Monthly for II Batteries Cycle Batteries 4--
Operational Check M--
Repair or j
4 (Charge and Install) -->
(Field Test Unit)
Maintenance 1I I
Install Accessories Flow Check (Filters, Belt, Cover)
U~3 On a periodic basis, PAPR blowers should be cycled between active storage and in-service.
('
t RPM ^'"3'4 Level of Use STOP ~
THINK ACT' REVIEW 1nformation Rev. 2 8 of 12
m Att:chment 1 i
Inspection and Maintenance Frequency Flowcharts and Tables lq (Sheet 3 of 6) i,
)
Flowchart Number 3 - MSA Hip-Aire Breathing Apparatus l
Initial Receipt Inspection l
Drawn from lm Visual l
i Storeroom Inspection
- ~ ~ ~ - ~ ~ ~l l
p l
If lf l
Functional 4---
Repair or l
r Check Maintenance l
If l
4 i
In-Service l
Sanitize l
Active Storage Ik ik l
l jk ik Issue 1r l
l Return Clean / Wipe l
Visual Fit Check l
Inspection Down l
Worker Responsibility l
jr i
)
Survey Flowchart 1 Mask If l
Monthly >
Inventory
+
Inventony 4
Visual Annually Inspection or I~ ~ ~~ ~ ~ ~
To Place l
In-Senice if II Repair or 4--
Functional Check Maintenance -->
i If Sanitize t
i l
"" Y Monthly l
Visualinspection Air Cylinder 4
Al Ak lf Hydrostatic Test
,g k
RPM 2.3.4 Level of Use
~SToP TH.NK
'ACT Rf.~Vl8N Information Rev. 2 9 of 12
Att chment 1 i
-Inspection and Maintenance Frequency Flowcharts and Tables
' ;^-
(Sheet 4 of 6) s i
n i
Flowchart Number 4 - Scott Self-Contzined breathing Apparatus Initial Receipt ing. tion l
Drawn from Visual Storeroorn Inspection
_______l l
If 1f l
4-Repair or l
{
Functional Check Maintenance l
lI l
f f
In-Service c Sanitize
= Active Storage N
l h
Clean / Wipe m
Down II Suney
.,e
\\m, f
Monthly >
Inventory
+
Inventory
< Annualiyf Visual Inspection g
I~~~~~
To Place I
In-Senice if 1I l
Repair or 4.-
Functional Check Maintenance -->
If Sanitize f
Montbly h lf Weekly Visual inspection Cornposite Visual Inspection Fiberglass CMinder Wrnnned Air (Minder I
Every 5 Years Every 3 Years y
liydrostatic Test 4
l 25 Year Life i
15 Year Life Dispose
- 4
.O
\\
-N_/
RPM ~3'4 Level of Use STOP THINK '
ACT~
REVIEW Rev.2 lnformation 10 of 12 L
' ".. r-Inspection and Maintenance Frequency Flowcharts and Tables (Sheet 5 of 6)
[,}
C Flowchart Nuciber 5 - Bullard Abrasive Blasting Respirator Assemblies Initial Receipt Inspection I
Drawn from Visual l
m Storeroom j(;"
Inspection
""1 i
II l
If lf l
New Storage Operational Check 4--
Repair or f
To Activate (Warehouse 9) l
- - - >. Maintenance l
e e
e
.....................J In-Service <
> Active Storage
)k Ak Issue
'O jf
/
Insta;l Accessones Return (Filters, Belt, llose, y
CleaOVipe Cover)
Down II Survey lf Visual
^ """"I W
+
Inventory Inspection or Tb Place In-Senice 1f Operational Check 4--
Repair or Maintenance if l
ltrmi )
RPM 2.3.4 Level of Use STOP
' THINK '
'ACT REVIEW Rev.2 Information 11 of 12
Atttchment I Inspection and Maintenance Frequency Flowcharts and Tables (Sheet 6 of 6) n V
Table - 1 Bubblehoods or TYVEK lhx>ds - Air Supplied or Powered Air Purifying Frequency.
Activity Prior To Use After Use Visuallnspection X
Discard X
Table - 2 i
Filter Cartridges and Canisters Frequency Activity Prior To Use After Use VisualInspection X
Discard X
1 I/g Y
l 1
i O
RPM 2.3.4 Level of Use STOP
~ THINK ACT-REViiEW Rev.2 Information 12 M 12