NUMBER TTILE REV. ISSUE /DATE l
\\
ES 0.0 REDIAGNOSIS Rev. I JUN 3 1988 i
A.
PURPOSE i
This procedure provides a mechanism to allow the operator to determine or confmn the most appropriate post accident recovery guideline.
B.
SYMPTOMS OR ENTRY CONDITIONS i
This procedure is entered based on operatorjudgement.
l 4
Page 1 of 3 0810250154 8G1007 PDR ADOCK 05000213 P
NUhGER TTIE REV. ISSUESATE 5
E S.0.0 REDIAGNOSIS Rev.t l
JUN 3 1986 SEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 1
NOTE:
o FOIDOUT PAGE SHOULD BE OPEN.
o THIS PROCEDURE SHOULD ONLY BE USED IF St IS IN SERVICE OR IS REQUIRED.
l 1
CHECK IF ANY SG IS NOT FAULTED:
a.
Check pressures in all SGs -
- a. E a controlled cooldown is in ANY STABLE OR INCREASING
- progress, THEN QDIQ Step 2.
IfNDI THEN the following applies:
o E main steamlines NQIisolated.
11EN you should be in E 2, FAULTED STEAM GENERATOR ISOLATION.
o E main steamhnc. m isolated, THEN you should be in ECA 2.1, UNCONTROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS.
2 CHECK SECONDARY INTREGITY l
a.
Check all SG pressures -
- a. E any SG pressure is decreasing in STABLE OR INCREASING an uncontrolled manner AND the SG is NQIisolated, THEN QQIQ E 2, FAULTED SG ISOLATION, Step 1.
I b.
Check all SG pressures -
- b. E any SG is completely depressurized l
GREATER THAN 100 PSIG AND the SG is NQIlsolated, 111EN QDIQ E 2, FAULTED SG ISOLATION, Step 1.
I l
Page 2 of 3 1
NUMBER TTT12 REV. ISSUE /DATE ES.0.0 REDIAGNOSIS Rev.1 JUN 3 ISE6 STEP ACDON/ EXPECTED RESPONSE RESPONSE NOT OBTAINED 3
CHECK IF SG TUBES ARE YOU SHOULD B"IN AN E 1 RUMURED:
M ECA 1 SERIES PROCEDURE.
o Any SG levelincreasing in an uncontrolled tranner o Any SG with high radiation i
4 YOU SHOULD BEIN AN E 3 l
2 ECA 3 SERIES PROCEDURE l
END l
1 i
t i
1 l
I i
Page 3 of 3