MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20155B0331998-10-22022 October 1998 Proposed Tech Specs Changing TS 3.3.2.1, Instrumentation - ESFAS Instrumentation, 3.4.9.3, RCS - Overpressure Protection Sys & ECCS - ECCS Subsystems - Tavg 300 F 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program ML20154G5311998-10-0707 October 1998 Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review ML20154G5391998-10-0606 October 1998 Rev 6 to Project Procedure PP-07, Discrepancy Repts ML20154G5351998-10-0606 October 1998 Rev 3 to Project Procedure PP-04, Regulatory Review Procedure ML20154G5521998-10-0606 October 1998 Rev 5 to Project Instruction PI-01, Svsr Implementation Checklists & Workbook ML20154G5251998-10-0505 October 1998 Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan ML20236Q9341998-06-30030 June 1998 Rev 4 to PI-01, Sys Vertical Slice Review Implementation Checklists & Workbook ML20236Q9321998-06-25025 June 1998 Rev 4 to PP-01, Sys Vertical Slice Review ML20153C6171998-06-18018 June 1998 Rev 2 to CP 3804K, PASS Rcs/Rss Sample ML20153C6221998-06-18018 June 1998 Rev 1 to CP 3804L, PASS Containment Air Sample ML20153C6291998-05-31031 May 1998 Rev 0,Change 1 to CP 3804M, PASS Ventilation Samples ML20247R7851998-05-20020 May 1998 Rev 1 to Epop 4455C, Technical Assistant ML20247Q7011998-05-20020 May 1998 Rev 1 to Epop 4490, Implementation of Recovery Operations ML20247R8081998-05-20020 May 1998 Rev 1 to Epop 4455F, Rumor & Inquiry Control ML20247Q6671998-05-20020 May 1998 Rev 1 to Epop 4422A, Thermal Hydraulic Evaluation Methods ML20247Q6901998-05-20020 May 1998 Rev 1 to Epop 4475A, External Resources Coordinator ML20247R7921998-05-20020 May 1998 Rev 1 to Epop 4455D, News Releases ML20247Q6771998-05-20020 May 1998 Rev 1 to Epop 4428I, Direction of Posl Field Sampling ML20247R7541998-05-20020 May 1998 Rev 1 to Epop 4455A, Nuclear News Manager ML20247R7491998-05-20020 May 1998 Rev 1 to Epop 4455, Manager of Public Info ML20216B1791998-05-0808 May 1998 Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary ML20247H4581998-04-0909 April 1998 Rev 19 to EOP 35 E-0, Reactor Trip or Safety Injection B17159, Backlog Mgt Plan for Unit 31998-03-31031 March 1998 Backlog Mgt Plan for Unit 3 ML20216K0641998-03-20020 March 1998 Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program ML20216H7101998-03-13013 March 1998 Independent Corrective Action Verification Program Status Rept ML20216H7191998-03-0303 March 1998 Independent Corrective Action Verification Program Status Rept ML20203F6931998-02-20020 February 1998 Rev 6 to PI-MP3-11, Discrepancy Rept Submittal & Closure ML20203E2131998-02-19019 February 1998 Cancelled Rev 26 to 1-OPS-10.11, Locked Valve List ML20203D4111998-02-18018 February 1998 Revised 1-OM-index Unit 1 Operations Dept OM Index & Rev 2 to OM 3.8, Millstone Unit 1 Operations Manual ML20203F6751998-02-16016 February 1998 Rev 2 to PI-MP3-07, Review of Accident Mitigation Systems ML20203F6601998-02-16016 February 1998 Rev 5 to Audit Plan for Independent Corrective Action Verification Program ML20216H7351998-02-11011 February 1998 Independent Corrective Action Verification Program Status Rept 1999-05-10
[Table view] |
Text
.. - . __ .- -- _ - - - - - . _ - - - _ __
1 i
'O i
- SYSTEM VERTICAL SLICE REVIEW (SVSR) i
! I PROJECT INSTRUCTION i
1 PI-01 i
l 3
l i
jQ SVSR IMPLEMENTATION CHECKLISTS AND WORKBOOK 1
4 i
Signature Date s
Prepared: M~- p-c.9/
Reviewed: f[ /,-t 9f Approved: 4 oeT 9r Approved:
Deputy Project Director
$ #Tff
. .v
- Parsons Power Group Inc. -
Revision 5 9810130224 981008' October 5,1998
(
PDR ADOCK 05000336:
P'
_ PDR [ ,
l
- j. MILLSTONE UNIT 2 SYSRPROJECTINSTRUCTION PI-01
' SVSR IMPLEMENTATION CHECKLISTS AND WORKBOOK REVISIONS Section Revision No. Description p_ gig All 0 InitialIssue June 09,1997 l All 1 Revisions June 30,1997 i
All 2 Revisions September 23,1997 All 3 Revisions January 21,1998 All 4 Revisions June 26,1998 l Form 3 5 Revisions October 5,1998 O
I l
i.
- Parsons Power Group Inc. -
iii Revision 5 PI-01. DOC October 5,1998
. . _ _ _ . . . _ . . . . _ . _ _ . . ._.m.___ _ _ _ . _ . . . _ . .._.. _ _. m -_____ _
MILLSTONE UNIT 2 SVSRPROJECTINSTRUCTION PI-01 SYSR IMPLEMENTATION CHECKLISTS AND WORKBOOK LIST OF EFFECTIVE PAGES Pane No. Revision No. Pane No. Revision No.
i 4 43 4 il 4 44 4 ill 4 45 4 iv 4 46 4 v 4 47 4
,1 4 48 4 2 4 49 4 3' 4 50 4 4 4 51 4.
5 4 52 4 6 4 53 4 7- 4 54 4 8 4 55 4 9 4 56 4 10 ' 4 57 4 11 4 58 4 12 4 59 4 13 4 60 4 14 4 61 4 15 4 6.2 4 16- 4 63 4 17- 4 64 4 I 18 4 65 5 D 19 4 l
66 4
- 20. 4 67 4 21 4 68 4 22 4 69 4 23 4 70 4 24 4 71 4 25 4 72 4 26 4 73 5 27 4 74 5 28 4 75 5 29 4 76 5 30 4 77 4 31 _4 78 4 32 4 79 4 33 4 Form 3 3 34 4 Form 3 (Pase!&2) 5 l 35 4 80 4 Form 1- 2 81 4 36 4 82 4 j, 37 '4 Form 4 4-Form 2 2 83 4 I 38 4 84 4 l- 39 4 85 '4 40 4 86 4
]' 41 4 87 4
/ 42 4 Form 6 2 t
- Parsons Power Group Inc. -
l' iv Revision 5 PI-01. DOC October 5,1998 l
I
I MH1 STONE UNTT 2 SYSR PROJECTINSTRUCTION PI-01 '
SYSR IMPLEMENTATION CHECKLISTS AND WORKBOOK FORM 3 PART O IPEEE i
CHECKLIST QUESTIONS AND INSTRUCTIONS i INSTRUCTIONS IPEEE review has been deleted per NRC letter dated September 22,1998.
l
- 1. IPEEE is reviewed using the following checklist and the results of the review are recorded on Form 3 Part O.
- 2. The System Lead Engineer or Specialist shall use the following questions / requirements as the basis for preparing the specific review questions to be utilized by the inspection team.
- 3. The SLE or Specialist reviews the following questions, expanding them as required, and completes the appropriate system specific form in the workbook.
Note: these questions / requirements are customized for each selected system and do not require the SLE or Specialist to include each question ifit is not applicable to the selected system.
- 4. If applicable, the SLE or Specialist may use other checklist question contained in the system review checklist or Appendix A.
A. IPEEE REVIEW CRITERIA Was the Millstone Unit 2 IPEEE performed consistent with the Licensing and Design Bases requirements.
. Was the Millstone Unit 2 IPE performed consistent with the Licensing and Design Bases requirements?
O
- Parsons Power Group Inc. -
PI- 65 Revision 5
. PI-01. DOC October 5,1998
. - -. - . . - __ . . ~. _ _ . - _ . . . ~ . . . - - . _ - . .- . . _-
1 MILLSTONE UNIT 2 SVSRPROJECTINSTRUCTION PI-01 SYSRIMPLEMENTATION CHECKLISTS AND WORKBOOK l .
FORM 3 PART U
- l. STATION BLACKOUT l
l CHECKLIST QUESTIONS AND INSTRUCTIONS I i
INSTRUCTIONS l
l Effective September 4,1998, Station Blackout review will be completed by the NRC l as part of their Significant Items List (SIL) Closeout Inspection. l l
- 1. Station Blackout is reviewed using the following checklist and the results of the I review are recorded on Form 3 Part U.
- 2. The System Lead Engineer or Specialist shall use the following questions / requirements as the basis for preparing the specific review questions to be utilized by the inspection team.
1
- 3. The SLE or Specialist reviews the following questions, expanding them as required, and completes the appropriate system specific form in the workbook.
7 !
i Note: these questions / requirements are customized for each selected system and do not require the SLE or Specialist to include each question ifit is not applicable to the selected system. .
1
- 4. If applicable, the SLE or Specialist may use other checklist question contained in the system review checklist or Appendix A.
A. STATION BLACKOUT REVIEW CRITERIA The following questions will be used to screen the system for Station Blackout
. applicability. A yes answer will require a more detailed review as defined in Section B.
Section A - Station Blackout Review Screening e Is the system being reviewed identified in the Millstone Unit SBO response scenario as being utilized?
!p I .
- Parsons Power Group Inc. -
PI- 73 Revision S PI41. DOC October 5,1998 1
MILLSTONE UNIT 2 SVSR PROJECT INSTRUCTION PI 41 SYSRIMPLEMENTATION CHECKLISTS AND WORKBOOK Section B - Station Blackout Review e Are the system SBO functions identified in NNECo's SBO scenario consistent with the NUMARC document?
e Can the components perform the required function as described in the SBO l scenario?
Are all of the system components required to perform the SBO function listed in the SBO equipment list?
l Do the MEPL and PMMS entries for the system identify the SBO function e correctly for the components required for SBO? '
Do any SBO related calculations for the system follow the NUMARC guidance for method, use the correct inputs and are correctly performed to obtain a correct result?
e Verify that any containment isolation valves in the syster will fail closed in an SBO or can be manually closed.
I e Verify that any system electrical equipment that is powered from the alternate AC source during an SBO can be connected to the alternate AC source and that all of the breakers required are identified on the SBO Component list.
j e Verify the DC and AC loads used in SBO Power requirement calculations for
- j. system components are correct.
Verify that any system instrumentation required during an SBO is powered O from an available source and is correctly identified in the station operating V procedures.
- Review SBO Emergency Operating Procedures for the system to assure that they correctly implement the SBO scenario.
I I
i t
l O
- Persons Power Group Inc. -
4 PI-74 Revision 5 j PI-01. DOC October 5,1998 i
MILLSTONE UNIT 2 SYSRPROJECTINSTRUCTION PI-01 SVSR IMPLEMENTATION CHECKLISTS AND WORKBOOK FORM 3 PART V I APPENDIX R I CHECKLIST QUESTIONS AND INSTRUCTIONS INSTRUCTIONS Effective September 4,1998, Appendix R review will be completed by the NRC as part of their Significant Items List (SIL) Closcout Inspection.
- 1. Appendix R is reviewed using the following checklist and the results of the review are recorded on Form 3 Part V.
- 2. The System Lead Engineer or Specialist shall use the following questions / requirements as the basis for preparing the specific review questions to be utilized by the inspection team.
- 3. The SLE or Specialist reviews the following questions, expanding them as required, and completes the appropriate system specific form in the workbook. ;
O
. \s' i l
Note: these questions / requirements are customized for each selected system and '
do not require the SLE or Specialist to include each question ifit is not applicable to the selected system.
- 4. If applicable, the SLE or Specialist may use other checklist question contained in the system review checklist or Appendix A.
A. APPENDIX R CRITERIA The following questions will be used to screen the system for Appendix R applicability. A yes answer will require a more detailed review as defined in Section B.
Section A - Appendix R Review Screening
- e Is the system (or any portion of the system) necessary for safe plant shutdown l- in the event of a 10CFR50 Appendix R fire?
l .
- Parsons Power Group Inc. -
l PI- 75 Revision 5 I
PI-01. DOC - October 5,1998
MILLSTONE UNIT 2 SYSRPROJECTINSTRUCTION PI-01 l
SYSR IMPLEMENTNTION CHECKLISTS AND WORKBOOK Section B - Aopendix R Review e
Are the system and the specific safe shutdown components appropriately l defined in the plant Appendix R documentation and in the operating
( procedures used by operating personnel for a fire scenario?
l- e Does the Appendix R documentation demonstrate compliance to the separation l
criteria of 10CFR50 Appendix R, Section III.G.2 for the safe shutdown components and circuits? l
. Are local manual operations or local administrative actions (if applicable) adequately defined?
l-
e For the fire areas requiring the use of the system for safe shutdown, does the Appendix R documentation demonstrate the availability of the necessary support systems; e.g. electrical power, control power, service water, HVAC?
e Have the equipment and circuits necessary for safe shutdown been identified? '
e Has the impact of fire barriers / wrap on cable derating been addressed?
e For manual actione necessary for safe shutdown, has the required lighting and communication.been provided? l e Have associated circuits been identified and their impact addressed?
f . For the system under reviews, do the circuits and equipmerit required for safe shutdown have adequate separation or fire barriers in representative fire zones. I L
t l-LO
! - Parsons Power Group Inc. -
PI-76 Revision 5 PI-01. DOC October 5,1998 L-
f DOCUMENT ID: RC-SLB- Page 2 ofxx l MILLSTONE UNIT 2 SYSTEM CODE:
Q SYSTEM DESIGN INPUT AND ICAVP SYSR SYSTEM:
LICENSING BASIS CHECKLIST Responsible Engineer:
(System Team Lead)
PART B.2 SYSTEM PROGRAM / TOPICAL
SUMMARY
4 Instructions: (1) The OE will summariae which of the program areas are included in the licensing basis of the system.
j This Part should not be completed until the detail reviews in Parts E through W bave been completed.
! (2) The OE needs to assure that NNECo has considered the applicability of EACH program / topical area.
j When dispositioning the question below, the OE needs to review the licensing basis or program to the j extent that NNECo considered it during in the system design.
l NOTE: Because these are topical areas, NNEco licensing basis needs to consider each program / topical area i for applicability. However, EAQi area may not effect/ impact the system and hence not be applicable to the
- licensing / design basis.
! Form 3 APPLICABLE TO
! Reference PROGRAM / TOPICAL AREA THE SYSTEM
!- Section CURRENT
{ Part LICENSING BASIS E Anticipated TransiAts without SCRAM (ATWS) O Yes O No l
F Control Room Design Review 0 Yes O No j G Emironmental Qualification of Electrical Equipment (EQ) O Yes O No
, H Erosion / Corrosion O Yes O No
! I ExternalEvents/ Hazards O Yes O No l
l J Generic Letter 89-10 (MOV) O Yes O No l K Heavy Loads O Yes O No i L High and Moderate Energy Line Breaks (HELB/MELB) O Yes O No M Inservice Inspection O Yes O No j N Inservice Testing /10 CFR50 Appendix J Testing O Yes O No I O IPEEE Deleted i
P Master Equipment and Parts List (MEPL) O Yes O No Q Regulatory Guide 1.97 Compliance O Yes O No l
R Separation / Independence / Diversity 0 Yes O No 4- S Set Point Control O Yes O No T Single Failure O Yes O No U Station Blackout O Yes O No
!o - Parsons Power Group Inc. -
FORM: 3
, 1 2 Package Sequence No. 4 i
Revision 5 F3 CLLBD. DOC 10/5/98
(
_, _ . _