E0P 301-8 Rev.6(MAJOR)
{
MAY I 21987 Connecticut Yankee
' ""* " 8' P " [ ^'"'**' -
Emer ncy Operating Procedure c
E0P
.1-8 hhk.4..- _.
I COMPLETE LOSS OF CONDENSER VACUUM glha,tb. %
'a pe v na up 1.0 DISCUSSION 1.1 Although protection of the secondary plant equipment is of concern.
prime attention must be directed to providing for adequate heat removal from the reactor coolant system.
1.2 A complete loss of esin condenser vacuum, is defined as the condenser vacuum at or below the turbine low vacuum trip of (21.5" Hg) 2.0 SYMPTOMS Decreasing condenser vacuum.i 7.1 2.2 Turbine and reactor trip.
2.3 Absence or loss of steam dump after reactor trip caused by low vacuum blocking of actuation signal.
2.4 Possible actuation of pressurizer power operated relief valves and code safey valves.
2.5 Actuation of steam generator safety valves.
3.0 AUTOMATIC ACTIONS 3.1 Turbine and reactor trip on low vacuum at 21.5 in. Hg.
If power less than 101, reactor will not trip.
3.2 Actuation of steam generator safety valves at 985 psig.
4.0 IM EDIATE OPERATOR ACTION 4.1 Perform imediate actions contained in E-0, Reactor Trip or Safety Injection, if not done, rb 9810240465 881007 Page 1 of 2 PDR ADOCK 05000213 P
pm
E0P 3.1-8 Rev.6(MAJOR)
E0P2
(
5.0 SU8 SEQUENT OPERATOR ACTION l
ACTION / EXPECTED RESPONSE
_RESPON5E NOT 05TAIMED l
T 5.1 Verify ave is reduced to 5.1 Open steam supply to hog jets approximately 535"F by OR atmospheric vent OR aux.
Steam Dump.
Teed pumps to controTT,y,.
5.2 Verify Hotwell level 5.2 Open hotwell makeup valve greater than 501.
CD-MOV-10.
IF hotwell level less than 40 E THEN shift suction on "A" condensate pump to DWST and shut down one feed pump and "B" condensate pump.
5.3 Verify feed flow to SG's 5.3 Open FW bypass valve to each greater than 320 GPM SG using main OR aux, feed unti'i WR level in one SG is pumps.
~
greater than 635.
5.4 ~ Check DWST level greater 5.4 Start takeup to DWST from PWST than 54,000 gallons.
I j
NOTE: The combined storage capacity of the two hotwells provides a
(
2 3/4 minute supply of',feedwater at full flow.
E 5.5 Operate main or aux feed pumps to provide feed
~
flow to SGs.
5.6 Return to procedure end step in effect.
j 9
Page 2 of 2