_ _ _ _ _ _ _ _ _
hMiBER EM REY. !SSl!E/DATE ES.O.3 NATURAL CIRCULATION COOLDOWN WITH Rev. 3 STEAM VOID IN VESSEL (WITH RVLIS)
JUN 31988
(
A.
PURPOSE l
This procedure provides actions to continue plant cooldown and depressurization to cold j
shutdown, with no accident in progress, under conditions that allow for the potential formation of a void in the upper head region with a vessel level system avaliabic to monitor void growth.
B.
SYMPTOMS OR ENTRY CONDITIONS This procedure is entered from ES 0.2, NATURAL CIRCULATION COOLDOWN, after completing the first thbteen steps, 4
l 4
i l
I i
I i
I l
l l
l i
8810250195 001007 Page 1 of 8 i
DR ADOCK 050 23
NUMBER TITII REV. ISSUE /DATE ES 0.3 NATURAL CIRCULATION COOLDOWN WITII Rev.3 STEAM VOID IN VESSEL (WITil RVLIS)
JUN 3 1988
(
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED r
7$
CAUTIONt o
IF St ACTUATION OCCURS DURING THIS PROCEDURE, l
E 0, REACTOR TRIP OR SAFETY INJECTION, SHOUlD BE i
PERFORSIED.
l l
o THE FIRST THIRTEEN STEPS OF ES 0.2, NATURAL CIRCULATION COOLDOWN, SHOULD BE PERFORSfED BEFORE CONTINUING WITH THIS PROCEDURE.
\\
L J'
NOTEt o
FOIDOUT PAGE SHOULD BE OPEN.
l I
o RCPs SHOUlD BE RUNIN ORDER OF PRIORITY TO I
PROVIDE NORhfAL PRZR SPRAY.
I o
IF CONDITIONS CAN BE ESTABUSHED FOR STARTING AN RCP DURING THIS PROCEDURE, STEP 1 SHOULD BE REPEATED.
1 TRY TO START AN RCP:
- a. Check RVLIS head indication -
- a. Perform the following:
j FULL
- 1. Increase PRZR level to 75 %
i using charging and letdown.
i
- 2. Establish subcooling greater than 60* F using steam dump.
l
- b. Establish conditions for starting an RCP:
- b. QQIQ Step 2 i
- 1. Close loop Tc isolation valve l
- 2. Open loog bgast valve
- 3. Start oil hft pump l
- 4. Insure seal water and com znent cooling water supplied to (CP
- 5. Insure lower bearing temperature l
is less than 170* F
- 6. Check RCS pressure i
greater than 300 PSIG l
- 7. Check open Cil TV 240,
- 7. Open Cil TV 240, Cli TV 241 i
Cil TV 241 and Cil TV 334.
and Cli TV 334 l
(seal water return trip valves)
- 8. Check open CC TV 1411
- 9. Open seal water return MOV Page 2 of 8
.WhGER TTIM REY. ISSUE /DAR j
ES 0.3 NATURAL CIRCULATION COOLDOWN WITH Rev.3 STEAM VOID IN VESSEL (WITH RVLIS) g.
3jggg
(
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED 1
- c. Start selected RCP
THEN perform the following:
THEN perform the following:
i
- 1. Oxn loop Te isolation valve
- 1. Open loop Tc isolation valve 1
- 2. C ose loop bypass valve 2, Close loop bypass valve
{
i
- d. Align PRZR spray valves
- e. GQIQ NOP 2.3 4, i
ilOT STANDBY TO COLD i
SHUTDOWN, Step 1 NOTEt SATURATED CONDITIONS IN THE PRZR SHOULD BE ESTABUSHED BEFORE TRYING TO DECREASE PRZR LEVEL.
2 ESTABLISH PRZR LEVELTO i
1 ACCOMMODA1E VOID GROW 1H:
I
- a. Check PRZR level-
- a. Control charging and letdown BETWEEN 20 % AND 30 %
as necessary to establish level.
j
- b. Place PRZR levelcontrolin manual i
i I
I l
i Page 3 of 8
I
' UMBER TTRE REV. ISSUE /DATE ES.O.3 NATURAL CIRCULATION COOLDOWN WITil Rev.3 i
STEAM VOID IN. VESSEL (WITil RVLIS) g g jg{
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTANED i
r 7!
CAUTION:
INSURE St ACTUATION SIGNAL IS BLOCKED PRIOR TO DEPRESSURIZING THE RCS.
L J
l 3
CONTINUE RCS COOLDOWN AND l
INITIATE DEPRESSURIZATION:
- a. Maintain cooldown rate in RCS cold legs -
l LESS TIIAN 100* F/ HR
- b. Maintain RCS subcooling tused on core exit thermocouples -
l GREATER TilAN 52' F l
- c. Maintain RCS temperature and pressure -
WITIIIN LIMITS OF TECIINICAL SPECIFICATIONS SECTION 3.4 FIGURE 3.4 9 I
- d. Check letdown IN SERVICE
l
'DIEN QQIQ Step 4.
- c. Depressurize RCS using auxiliary spray i
I l
I I
i 1
l i
k Page 4 of 8 L
NUMBER TTTI.E REY. !SSUEsDATE ES.0.3 NATURAL CIRCULATION COOLDOWN WITH Rev.3 STEAM VOID IN VESSEL (WITH RVLIS) g 3 1988
(
Sil!P AC110N/ EXPECTED RESPONSE RESPONSE NOT OBTAINED 4
COSTROL PRZR LEVEL:
- a. Maintain PRZRlevel-
- a. Control charging and letdown, as l'
GREATER DIAN 20 %
necessary, to increase PRZR level I
to greater than 20 %.
I
- b. Maintain PRZR Icvel-
- b. Perform the following-LESS THAN 90 %
1 1, Tum on PRZR heaters to maintain PRZR pressure stable.
l,
- 2. Decrease PRZR level to less than 90 % by one OR both of the following:
o Control charging and letdown as necessary to decrease level, o Continue cooldown to shrink RCS inventory.
5 CHECK RVLIS PLENUM REPRESSURIZE RCS TO MAthTAIN INDICAT10N RVLIS PLENUM INDICATION GREATER THAN 61 %
GREA'IER THAN 61 %,
2 THEN RETURNIQ STEP 3.
6 CHECK IF SOLID PLANT CONDITIONS SHOULD BE ESTABLISHED:
- a. Check PRZR steam phase temperature -
- a. Continue RCS cooldown and LESS DIAN 450' F depressurization.
I 311EN PRZR temperature is less than 450' F.
U{EN do step 6 b.
- b. Increase PRZR level to 100 %
l l
l I
l Page 5 of 8
SutBER TUM REY.15S!!E/DATE l
ES.O.3 NATURAL CIRCULATION COOLDOWN WITil Rev.3 STEAh! VOID IN VESSEL (WITil RVLIS)
Jgg_3 jgg; i
STEP ACDON/EXPEC1ED RESPONSE RESPOf;SE NOT OBTAINID r
7 l
CAUTION:
THE SI SYSTE&f AfUST BE DISABLED BEFORE RCS l
TE&tPERATURE IS LESS THAN 315
- F.
L J
7 PERFORht COLD SliUTDOWN ALIGNhtEST:
- a. Check core exit thermocouples -
- a. Continue RCS cooldown.
LESS TlIAN 350' F WlIEN core exit thermccouples are less than 350' F.,
T11EN do step 7 b, e and d.
l i
- b. Align core cooling equipment j
IN ACCORDANCE WTril NOP 2.3-4, liOT STANDBY htODE 3 TO j
COLD SIRTIDOWN htODE 5 l
ASD NOP 2.121, CORE COOLING SYSTEh! LINEUP FOR SilUTDOWN AND AT POWER OPERATION
- c. Check iflow temperature over
- c. MIEN all conditions are satisfied.
pressure protection relief valves 111EN do step 7 d.
should be placed in senice:
l
- 1. Check PRZR level-SOLID
- 2. Check RCS temperature -
{
t.ESS DIAN 325' F
- 3. Check PRZR teroprature -
LESS TRAN 430 F l
- 4. Check RCS pressure -
LESS T11AN 325 PSIG I
- d. Place low temperature over pressure protection relief valves l
in semce l
IN ACCORDANCE %TTli 3
NOP 2.3 4, llOT STASDBY StODE 3 TO COLD SilU1DOWN htODE 5 Page 6 of 8 l
NUMBER TTT U REV. ISSUESAE ES 0.3 NATURAL CIRCULATION COOLDOWN WITH Rev.3 I
STEAM VOID IN VESSEL (WITH RYLIS) g 3198$
k STEP ACTIONSXPECTED RESPONSE RESPONSE NOT OBTAINED f
8 MAIhTAIN LETDOWN FLOW:
i
- b. Adjust serpoint of letdown low pressure regulating valve (LD PCV 113) as i
necessary 9
MAlhTAIN RCP SEAL INJECTION f
FLOW:
- s. Throttle seal supply valves (Cli V 354A thmugh D) to maintain 4
i labyrinth differential pressure between 5" and 10" of water pressure 10 CHECK IF RHR SYSTEM CAN BE PLACED IN SERVICE:
l j
- a. Check RCS temperature -
- a. RETURN I.Q Step 3.
l t
LESS T11AN 300* F l
l
- b. Check RCS pressure -
- b. RETURN IQ Step 3.
l LESS TilAN 300 PSIO
[
l
- c. Place RHR in senice IN ACCORDANCE WTUI i
1 NOP 2.91.
1 RHR SYSTEM PLACING SYSTEM i
IN SERVICE I1 CONTINUE RCS COOLDOWN TO COLD StilJIDOWN l
l
.i I
l i
(
i 1
l l
r I
l i
i l
i I
Page 7 of 8 i
f 1
butBER TTRE REY. ISSLT& ATE ES.O.3 NATURAL CIRCULATION COOLDOWN WITil Rev.3 STEAM VOID IN VESSEL (WITil RYLIS)
M 31988 l
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINTD r
7 i
CAUTION:
DEPRESSURIZING THE RCS BEFORE THE ENTIRE RCS IS LESS TH.W 200* F MA Y RESULT IN ADDITIONAL VOID FORMATION IN THE RCS.
4 L
J 12 CONTLNUE COOLDOWN OF IN/.CTIVE PORTION OF RCS:
- s. Cool up;xt head region using CRDM fans
- c. Check RVLIS head indication.
- c. RETURN IO Step 11.
FULL 13 DETERMINE IF RCS l
DEPRESSURIZATION IS PERMITED:
- a. Check entin RCS temperature -
- a. DO NOT DEPRESSURIZE RCS.
l LESS Ti{AN 200* F REIURS10 Step 11.
i
- b. GQ IQ NOP 2.3 4, iiOT STANDBY MODE 3 TO COLD SliUTDOWN MODE 5 END l
i l
Page 1 of 8 i