JUN 0 31988 4
t NUMBER TTn.E REY. ISSUE /DATE ES.I.3 TRANSFER TO RHR RECIRCULATION Rev. 5
{
i A.
PURPOSE i
i d
This procedure provides the necessary instructions for transferring the safety injection system to the recirculation mode.
B.
SYMPTOMS OR ENTRY CONDITIONS
{
This procedure is entered from:
j 1.
E 1, LOSS OF REACTOR OR SECONDARY COOLANT, Step 14, I
on low RWST level.
2.
ECA 2,1, UNCONIROLLED DEPRESSURIZATION OF ALL STEAM on low RWST level.p 8, GENERATORS Ste 3.
All other rocedures whenever RWST level reaches t! e switchover serpoint of 130,000 allons, i
l
]
4 l
i l
I
)
h 8' I of 8
?$kC2ffQK O 2 882007 3
P l
t
JUN 0 31988 NUMBER TTTLE REY. ISSUE /DATE ES.I.3 TRANSFER TO RilR RECIRCULATION Rev. 5 i
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAL.9 CAUTION:
o STEPS ONE THROUGH THREE SHOUw BE PERFORSfED WITHOUT DELAY.
o SI RECIRCULATION FLOW TO THE RCS AfUST BE SfAlhTAINED AT ALL TISIES.
i o
IF OFF SITE POWER IS LOST AFTER Si RESET, AfANUAL ACTION SfAY BE REQUIRED TO RESTART SAFEGUARDS l
EQUIPSfEhT.
i o
IF COhTROL SWITCH FOR ANY SHUTDOWN CHARGING l
PUhfP WAS TAKEN TO THE TRIP POSITION, THE PUSfP(S)
AfAY AUTO START WHEN BOTH SI WL RELAYS ARE RESET.
o IF CORE COOUNG IS DEGRADING AND RADIATION LEVELS PERAllT, DISPATCH AN OPERATOR TO RESf0VE THE BLOCK FROSi RH FCV 796 AND RESTORE ITS AIR SUPPLY, THEN OPERATE VALVE AS REQUIRED.
o CAREFULLY Af0NITOR PAB RADIATION LEVELS AFTER PLACING THE RHR SYSTESt ON RECIRCULATION.
l l
o RHR RECIRCULATION SHIFTOVER SHOUD BE COAfPLETED BEFORE RWST LEVEL DROPS TO 43.000 GALLONS TO PREVEhT DAbfAGE TO ECCS PUSfPS.
l 1
NOTE:
o FODOUT PAGE SHOUm BE OPEN.
o COhTAINAfEh7 PRESSURE SHOULD BE Af0NITORED. IF i
PRESSURE APPROACHES 40 PSIG, OPEN FIRE STAIN TO COhTAINhfEhT SPRAY. RH Af0V 31, TO REDUCE PRESSURE, WHEN PRESSURE DECREASES TO 3S PSIG, CLOSE RH Af0V 31.
I RESETSI ANDCONTAINMENT ISOLNDON:
i
- a. Check containment pressure -
- a. Perform the following:
LESS THAN 5 PSIG i
- 2. Reset SI WL Relays.
l l
l Page 2 of 8 i
JUN 0 31988 :
NUMBER TTIU REY. ISSUE /DATE ES.I.3 TRANSFER TO RHR RECIRCULATION Rev,5 l
STEP ACTION /EXPECfED RESPONSE RESPONSE NOT OBTAINED l
1
- 3. E charging pump control i
switch (es) are SQIin TPO,
{
IIEE restore low discharge j
pressure auto stan for shutdown chx ging pump (s) by taking pu control switch (es) to the "Tnp,mp position then releasing switch (es) to the "Auto" position.
I l
4 QQIQ Step 2.
l
- b. Remt Si and containment isolat'on (SEE OPPOSITE PAGE) i 2
OPEN SW MOV 5 AND SW MOV 6 LOCALLY OPEN SW MOV 5 AND l
(SW TO RHR HX). ENSURE ONE SW SW MOV 6.
PUMP RUNNINO FOR EACH RHR HX 3
ALION RHR SYSTEM FOR RECIRCULATION:
- a. Ch ck containment waterlevel-I GREATER THAN 2.25 FEET l
- b. Open containment sump suction
)
E RH V 808A EQIopened.
I
'nIEN locally open RH MOV 22 to i
estabush a flow path from the sump to se RCS.
f i
E flow path EQIestablished, i
i THEN QQ IQ ECA 1,1, LOSS OF EMERGENCY COOLANT RECIRCULATION, Step 1.
l i
isolation MOVs.
- e. Stop both LPSI pumps and place f
i control switches in'IPO l
i Page 3 of 8 l
I
JUN 0 31988 NUMBER TTT12 REY. ISSUEMATE j
ES.I.3 TRANSFER TO RiiR RECIRCULATION Rev. 5 i
I
\\
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED I
i r
7 CAUTION:
o DO NOT START LPSI PUStPS %'ITH RH Af0V 874 OPEN.
LPSI PUAfP DISCHARGE PRESSURE %'1LL OVER PRESSURIZE l
THE HPSI BOOSTER PUSfP.
o DO NOT START (JSI PUSfPS %' HEN ON CONTAINAfENT SUhfP RECIRCULATION. LPSI PUh!P DISCHARGE PRESSURE H'lLL SEAT RHR PUSIP DISCHARGE CHECK VALVES AND SUStP RECIRCULATION %'lLL BE LOST.
L J
j 3
- f. Stan one RHR pump
- f. IE pump does NOI stan.
DIEN start the other RHR pump.
IE NO RHR pump available, ElEN QD IC he '.a. a.:.
LOSS OF E'rMhNCY COOLANT RECIRCl(A flON, Step 1.
- g. Check one charging pump RUNNLNG
- g. Perfomt the following to stan a (Stop one pump if two running) charging pump:
- 1. Isolate sealinjection i
- 2. Check closed CH htOV 257.
3 IE NQIclosed, THEN manually QB locally close l CH htOV 257.
l
- 3. Check open BA htOV 373.
I IE NOIopen, i
THEN manually op.en I
B A htOV 373 08 BA stOV 32. I
- 4. Take charging pump control switch l to the "Trip" then to the "Stan" position.
l IE NQ charging pump available, HiEN GO IQ ES 1.4, TRANSFER TO TWO PADI i
RECIRCULATION, Step 3.
- h. Check RCS pressure -
- h. GQ IQ Step 3 j.
LESS THAN 1500 PSIO AstPS.
- i. GQIQ ES 1,4, l
- i. Check RHR pumh 140 AhtPS I
GREAniR THA 1RANSFER TO TWO PAT 11
)
RECIRCULATION, Step 1.
l t
l Page 4 of 8
JUN 0 31988 NUMBER TTTU REY.15$UESATE i
ES.I.3 TRANSFER TO RHR RE IRCULATION Rev.$
4 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTALNED 3
(Place control select switch in neutral, then manually open both valves)
}
- l. Perform the following to isolate the charging suction header:
1 1 Stop all RCPs
- 2. Cose all four seal water returo MOVt.
3 Close CH TV 334 i
(Seal wster terum trip valve)
- 4. Stop metering pump I
pump suction division valve)
- 6. Icontainment pressure is prester than 5 PSIO,
.liF.S perform the following:
- a. Close CH W 240, j
CH TV 241 i
(Seal water return trip valves) i
- b. Cose CC TV 1411 i
celers) l
- n. Check RHR pump discharge pressure -
- n. Stop RHR pump, GREATER THAN 80 PSIG *1 T11EN GD TD ECA 1.1, LOSS OF EMERGENCY COOLANT REC 7J.CULATION, Step 1.
l
I
l
- q. Cose BA MOV 373 I,
l i
l I
Page 5 of 8 l
l L
JUN 0 31988 NUMBER TTTLE REV ISSUE /DATE i
ES 1,3 TRANSFER TO RHR RECIRCULATION Rev.5 l
I
(
STEP ACTION /EXECIED RESPONSE RESPONSE NOT 03TAINED l
3
- r. Check RHR and charging pumps -
- r. E RHR ump cavitating, NOT CAVITATING THEN rform the following:
- a. Stop operating charging pump.
- b. Stop operating RHR pump.
- c. Open BA hiOV-373.
- d. Close RH hiOV-33A and RH hiOV 330.
- e. Start a charging sump.
- f. QQIQ ECA 1.L.
LOSS OF EhiERGENCY COOLANT RECIRCULATION, Step 1. *1 E charging pung cavitating THEN perfomi tne following:
- a. Equally throttle both core deluge isolatioa hiOVs until operating RHR pump AhiPs are less than 220 AhiPs.
- s. Stop both HPSI pumps 4
VFRIFY RHR AND CHARGING FLOW BY hiONITORING REACTOR VESSEL FLUID LEVEL,TEhiPERATURE AND SUBCOOLING TO ENSURE ADEQUATE CORE COOLING Page 6 of 8
JUN 0 31988 4
NUMBER TTIII REY. ISSUE /DATE ES.I.3 TRANSFER TO RHR RECIRCULATION Rev. 5 l
(
5TEP ACTION /EXPECIED RESPONSE RESPONSE NOT OBTAINED 5
OPEN AND LOCK OPEN BREAKERS FOR:
BA MOV-373, BA MOV-32, j
SI MOV 861C, SI MOV 861D SI MOV 871 A, SI MOV 871B i
RH MOV 22 I
6 MONITOR CORE EXIT E APPROACHING 700' F, THERMOCOUPLES -
THEN PERFORM THE FOLLiW/ING: !
LESS THAN 700* F o Stan additional charging pump.
.QR o Stan additional HPSI pump.
7 MONITOR CHARGING AND IE RHR PUMP CAVITATING, l
RHR PUMPS NOT CAVITATINO THEN PERFORM THE FOLLOWING: I
- a. Stop operating charging pump.
- b. Stop operating RHR pump.
i
- c. Open BA MOV-373.
l
- d. Close RH MOV-33A and RH MOV-33B.
l
- e. Start a charging pump.
i
- f. QQIQ ECA-1.1, l
LOSS OF EMERGENCY l
COOLANT RECIRCULATION, Step 1. *3 t
IE CHARGING PUMP CAVITAT NG, l IllEN PERFORM TiiE FOLLOWING: ;
- a. Equally throttle both core deluge isolation MOVs until operating RHR pump AMPS are less than 220 AMPS.
8 MAINTAIN SEAL INJECTION TO RCPs DURING COOLDOWN I
l 9
CONTINUE COOLDOWN OF l
TIIE RCS TO LESS THAN 200* F l
l l
l Page 7 of 8
JUN 0 31988 NUMBER Tm2 REV. ISSUE /DATE l
E S - 1.3 TRANSFER TO RIIR RECIRCULATION Rev.5 i
(
STEP ACTION /EXPECIED RESPONSE RESPONSE NOT OBTAINED NOTE:
WHEN RCS PRESSURE IS LESS THAN 100 PSIG AND RCS l
TEMPERATURE IS LESS THAN 200*F, CONSULT WITH PLANT i
ENGINEERING STAFF PRIOR TO TERMINATING TWO PATH
\\
RECIRCULATION (TO PREVENT BORIC ACID PRECIPITATION).
l 10 WHEN RCS PRESSURE IS LESS CLOSE SEAL WATER RETURN THAN 100 PSIG VERIFY SEAL MOVs.
WATER RETURN MOVs CLOSED 11 WHENTHE RCS IS AT ATMOSPHERIC PRESSURE PERFORM THE FOLLOWING:
- a. Isolate sealinjection to all four RCPs
RH MOV-33A AND RH MOV 33B l
l 14 RETURN IQ PROCEDURE AND STEP l
IN EFFECT l
l END i
l l
l l
Page 8 of 8