|
---|
Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARB17848, Startup Test Rept Cycle 7. with1999-09-30030 September 1999 Startup Test Rept Cycle 7. with ML20211Q3361999-09-0707 September 1999 Proposed Tech Specs Removing Current Special Exception Which Precludes Applying Eighteen Month Functional Testing Surveillance to SG Hydraulic Snubbers ML20211H6471999-08-25025 August 1999 Proposed Defueled Tech Specs,Revising Sections 5.6.1,5.7.2 & 5.7.3 & Adding Proposed Section 5.6.4 to Reflect ACs Contained in NUREG-1433 ML20211G1341999-08-24024 August 1999 Proposed Tech Specs Replacement Pages,Incorporating Addl Info for Pending TS Change ML20210Q5211999-08-0505 August 1999 Proposed Tech Specs Sections 3.8.3.2,4.6.2.1,4.6.2.2, 4.8.1.1,4.9.12 & Bases Section B 3/4.3.2,B 3/4.6.1.2 & B 3/4.8.4,incorporating Editorial Revs ML20210D4331999-07-31031 July 1999 Material Recovery Plan, for Haddam Neck Plant ML20210F5121999-07-28028 July 1999 Rev 0 to CY-HP-0031,Haddam Neck Plant Health Physics Dept Technical Support Document, Bounding Dose Assessment for Offsite Radioactive Matls ML20210C6091999-07-16016 July 1999 Proposed Tech Specs Relocating Selected TS Related to Refueling Operations & Associated Bases to Plant TRM ML20195C8591999-06-0303 June 1999 Proposed Tech Specs Incorporating Changes Which Reflect Limitations & Requirements Appropriate to Present Configuration of Plant ML20206U1041999-05-17017 May 1999 Proposed Tech Specs Section 4.4.6.2.2.e,deleting Reference to ASME Code Paragraph IWV-3472(b) Re Frequency of Leakage Rate Testing for Valves Six Inches Nominal Pipe Size & Larger ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2751999-04-19019 April 1999 Proposed Tech Specs,Reflecting Permanently Defueled Condition of Unit ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205M0891999-04-0707 April 1999 Proposed Tech Specs Modifying Value for Monthly Surveillance Testing of Tdafwp ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20204J1581999-03-19019 March 1999 Proposed Tech Specs Section 6, Administrative Controls, Reflecting Certified Fuel Handler License Amend Changes, Approved on 990305 ML20204J4101999-03-19019 March 1999 Proposed Tech Specs Relocating Instrumentation TSs 3.3.3.2, 3.3.3.3 & 3.3.3.4 to Mnps,Unit 2 TRM ML20204K0971999-03-19019 March 1999 Proposed Tech Specs Supporting Spent Fuel Pool Rerack to Maintain Full Core Reserve Capability Approaching End of OL ML20204F9031999-03-17017 March 1999 Proposed Tech Specs,Revising 3.5.2,3.7.1.7 & 3.7.6.1 Re ECCS Valves,Atmospheric Steam Dump Valves & CR Ventilation Sys. Associated Bases Will Be Modified as Necessary to Address Proposed Changes ML20207H9551999-03-0505 March 1999 Proposed Tech Specs Section 6.0 Re Administrative Controls ML20206K1121999-03-0505 March 1999 Proposed Tech Specs Bases Sections 3/4.7.7, CR Emergency Ventilation Sys & 3/4.7.8 CR Envelope Pressurization Sys. Changes Are Editorial in Nature ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207E0321999-03-0202 March 1999 Proposed Tech Specs 3/4.7.4, SW Sys, Proposing Change by Adding AOT for One SW Pump Using Duration More Line with Significance Associated with Function of Pump ML20207D4821999-02-26026 February 1999 Proposed Tech Specs Re Addl Mods Concerning Compliance Issues Number 4 ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20203E4051999-02-11011 February 1999 Proposed Tech Specs Re DG Surveillance Requirements ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20210D2121999-01-21021 January 1999 Proposed Tech Specs Sections 3/4.5.2 & 3/4.5.3, ECCS Subsystems for Info Only ML20199L2841999-01-20020 January 1999 Proposed Tech Specs & Final SAR Proposed Rev to Ms Line Break Analysis & Revised Radiological Consequences of Various Design Basis Accidents ML20199L3271999-01-18018 January 1999 Proposed Tech Specs 3.6.1.2, Containment Sys - Containment Leakage ML20199L0431999-01-18018 January 1999 Proposed Tech Specs Removing TS 3/4.6.4.3, Containment Systems,Hydrogen Purge Sys ML20199K4861999-01-18018 January 1999 Proposed Tech Specs to Relocate Requirements for Seismic Monitoring Instrumentation from Section 3/4.3.3.3 of TSs to TRM ML20199L4561999-01-18018 January 1999 Proposed Tech Specs Revising TS Table 3.7-6, Air Temp Monitoring. Proposed FSAR Pages Describing Full Core off- Load Condition as Normal Evolution Under Unit 3 Licensing Basis,Included ML20199L0801999-01-18018 January 1999 Proposed Tech Specs Change to TS 3/4.2.2 Modifies TS to Be IAW NRC Approved W Methodologies for Heat Flux Hot Channel factor-FQ(Z).Changes to TS Section 6.9.1.6 Are Adminstrative in Nature ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment ML20206P5121999-01-0404 January 1999 Proposed Tech Specs 3.5.2,3.6.2.1,3.7.1.2,3.7.3.1 & 3.7.4.1, Incorporating Changes to ESF Pump Testing ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20198K6361998-12-31031 December 1998 Proposed Tech Specs Section 6.0, Administrative Controls ML20198P9751998-12-28028 December 1998 Proposed Tech Specs Pages Revising Loss of Normal Feedwater (Lonf) Analyses to TS 2.2.1,TS Bases Change to Floor Value for Thermal Margin Low Pressure Reactor Trip & Proposed FSAR Changes ML20197G9831998-12-0404 December 1998 Proposed Tech Specs 4.7.10.e,eliminating Need to Cycle Plant & Components Through SD-startup Cycle by Allowing Next Snubber Surveillance Interval to Be Deferred Until End of RFO6 of 990910,whichever Date Is Earlier ML20196H6301998-12-0404 December 1998 Proposed Tech Specs Re Section 6.0, Administrative Controls ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195D4041998-11-10010 November 1998 Proposed Tech Specs,Modifying Sections 3.3.1.1 & 3.3.2.1 by Restricting Time That Reactor Protection or ESF Actuation Channel Can Be in Bypass Position to 48 H,From Indefinite Period of Time ML20195D8101998-11-10010 November 1998 Revised marked-up Page of Current TS 3.8.1.1 & Revised Retyped Page Re 980717 Request to Change TS 1999-09-07
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20210D4331999-07-31031 July 1999 Material Recovery Plan, for Haddam Neck Plant ML20210F5121999-07-28028 July 1999 Rev 0 to CY-HP-0031,Haddam Neck Plant Health Physics Dept Technical Support Document, Bounding Dose Assessment for Offsite Radioactive Matls ML20206M8221999-05-10010 May 1999 Restart Assessment Plan Millstone Station ML20206D1761999-04-27027 April 1999 Rev 1 to Millstone Unit 3 ISI Program Manual,Second Ten-Yr Interval ML20205R2501999-04-19019 April 1999 Rev 0 to CP2804M, Unit 2 Vent & Containment Air Pass ML20205R2411999-04-19019 April 1999 Rev 3 to CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205S5611999-04-16016 April 1999 Rev 5 to Epop 4426, On-Site Emergency Radiological Surveys ML20205E4411999-03-29029 March 1999 Rev 2 to CP 2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20196K5771999-03-24024 March 1999 Rev 1 to Chemistry Procedure CP2804L, Unit 2 Rx Coolant & Liquid Waste Pass ML20205D5321999-03-22022 March 1999 Rev 3 to RPM 2.3.5, Insp & Inventory of Respiratory Protection Equipment ML20207F6211999-03-0303 March 1999 Rev 2,change 1 to Communications - Radiopaging & Callback Monthly Operability Test ML20207J0001999-02-22022 February 1999 Rev 7 to Millstone Unit 2,IST Program for Pumps & Valves ML20206D1991999-02-11011 February 1999 Change 7 to Rev 5 to ISI-3.0, Inservice Testing Program. Pages 2 of 3 & 3 of 3 in Valve Relief Request Section 6.1 of Incoming Submittal Not Included ML20199E0931999-01-13013 January 1999 Rev 2 to Health Physics Support Procedure RPM 2.3.4, Insp & Maint Process for Respiratory Protection Equipment B17501, 1998 - 2000 Performance Plan - Work Environ Focus Area Update1998-12-31031 December 1998 1998 - 2000 Performance Plan - Work Environ Focus Area Update ML20199A7531998-12-31031 December 1998 Restart Backlog Mgt Plan Commitments ML20196A2181998-11-20020 November 1998 Restart Assessment Plan Millstone Station ML20195H8681998-11-0404 November 1998 Rev 4 to Millstone Unit 2 Operational Readiness Plan B17548, Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program1998-10-29029 October 1998 Rev 0 to TPD-7.089, Millstone 1 Equipment Operator Training Program ML20196H5861998-10-29029 October 1998 Rev 0 to TPD-7.087, Millstone 1 Certified Fuel Handler Training Program ML20196H5921998-10-29029 October 1998 Rev 0 to TPD-7.088, Millstone 1 Certified Fuel Handler/ Equipment Operator Continuing Training Program ML20154G5311998-10-0707 October 1998 Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review ML20154G5521998-10-0606 October 1998 Rev 5 to Project Instruction PI-01, Svsr Implementation Checklists & Workbook ML20154G5391998-10-0606 October 1998 Rev 6 to Project Procedure PP-07, Discrepancy Repts ML20154G5351998-10-0606 October 1998 Rev 3 to Project Procedure PP-04, Regulatory Review Procedure ML20154G5251998-10-0505 October 1998 Rev 4 to Independent C/A Verification Program for Millstone Unit 2 Audit Plan ML20154A7401998-09-24024 September 1998 Spent Fuel Pool Cooling & Makeup Monitoring Program ML20236Q9341998-06-30030 June 1998 Rev 4 to PI-01, Sys Vertical Slice Review Implementation Checklists & Workbook ML20236Q9321998-06-25025 June 1998 Rev 4 to PP-01, Sys Vertical Slice Review ML20153C6221998-06-18018 June 1998 Rev 1 to CP 3804L, PASS Containment Air Sample ML20153C6171998-06-18018 June 1998 Rev 2 to CP 3804K, PASS Rcs/Rss Sample ML20249B7841998-06-12012 June 1998 Rev 1 to CY-HP-0025,HNP Health Physics Dept Technical Support Document, Background Cs-137 Concentration in Soil ML20153C6291998-05-31031 May 1998 Rev 0,Change 1 to CP 3804M, PASS Ventilation Samples ML20247Q6901998-05-20020 May 1998 Rev 1 to Epop 4475A, External Resources Coordinator ML20247Q6771998-05-20020 May 1998 Rev 1 to Epop 4428I, Direction of Posl Field Sampling ML20247Q6671998-05-20020 May 1998 Rev 1 to Epop 4422A, Thermal Hydraulic Evaluation Methods ML20247R8081998-05-20020 May 1998 Rev 1 to Epop 4455F, Rumor & Inquiry Control ML20247R7921998-05-20020 May 1998 Rev 1 to Epop 4455D, News Releases ML20247Q7011998-05-20020 May 1998 Rev 1 to Epop 4490, Implementation of Recovery Operations ML20247R7491998-05-20020 May 1998 Rev 1 to Epop 4455, Manager of Public Info ML20247R7541998-05-20020 May 1998 Rev 1 to Epop 4455A, Nuclear News Manager ML20247R7851998-05-20020 May 1998 Rev 1 to Epop 4455C, Technical Assistant ML20216B1791998-05-0808 May 1998 Independent Corrective Action Verification Program for Millstone Unit 3,Interim Rept,Executive Summary ML20247Q6491998-05-0707 May 1998 Revised Nuclear Emergency Planning Operating Procedure Index ML20217Q9101998-04-30030 April 1998 Matl Recovery Plan ML20247H4581998-04-0909 April 1998 Rev 19 to EOP 35 E-0, Reactor Trip or Safety Injection B17159, Backlog Mgt Plan for Unit 31998-03-31031 March 1998 Backlog Mgt Plan for Unit 3 ML20216K0641998-03-20020 March 1998 Rev 2 to Oversight Plan NNECO - Millstone Site Independent Third Party Oversight Program ML20216H7101998-03-13013 March 1998 Independent Corrective Action Verification Program Status Rept ML20216H7191998-03-0303 March 1998 Independent Corrective Action Verification Program Status Rept 1999-07-31
[Table view] |
Text
.
JUN 0 31988 4 t NUMBER TTn.E REY. ISSUE /DATE ,
ES.I.3 TRANSFER TO RHR RECIRCULATION Rev. 5
{
i A. PURPOSE i i
d This procedure provides the necessary instructions for transferring the safety injection system to the recirculation mode. !
B. SYMPTOMS OR ENTRY CONDITIONS {
This procedure is entered from: j
- 1. E 1, LOSS OF REACTOR OR SECONDARY COOLANT, Step 14, I on low RWST level.
- 2. ECA 2,1, UNCONIROLLED DEPRESSURIZATION OF ALL STEAM GENERATORS Ste on low RWST level.p 8,
- 3. All other rocedures whenever RWST level reaches t! e switchover serpoint of 130,000 allons, i
l 4
]
l i
l I
) ,
h 8' I of 8 2 882007
?$kC2ffQK O P 3 l
t
JUN 0 31988 NUMBER TTTLE REY. ISSUE /DATE ES.I.3 TRANSFER TO RilR RECIRCULATION Rev. 5 i STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAL .9 CAUTION: o STEPS ONE THROUGH THREE SHOUw BE PERFORSfED '
WITHOUT DELAY.
o SI RECIRCULATION FLOW TO THE RCS AfUST BE !
SfAlhTAINED AT ALL TISIES. i o IF OFF SITE POWER IS LOST AFTER Si RESET, AfANUAL ,
ACTION SfAY BE REQUIRED TO RESTART SAFEGUARDS l EQUIPSfEhT. <
i o IF COhTROL SWITCH FOR ANY SHUTDOWN CHARGING l PUhfP WAS TAKEN TO THE TRIP POSITION, THE PUSfP(S)
AfAY AUTO START WHEN BOTH SI WL RELAYS ARE RESET.
o IF CORE COOUNG IS DEGRADING AND RADIATION '
LEVELS PERAllT, DISPATCH AN OPERATOR TO RESf0VE THE BLOCK FROSi RH FCV 796 AND RESTORE ITS AIR SUPPLY, THEN OPERATE VALVE AS REQUIRED.
o CAREFULLY Af0NITOR PAB RADIATION LEVELS AFTER PLACING THE RHR SYSTESt ON RECIRCULATION. l l
o RHR RECIRCULATION SHIFTOVER SHOUD BE ;
COAfPLETED BEFORE RWST LEVEL DROPS TO 43.000 ;
GALLONS TO PREVEhT DAbfAGE TO ECCS PUSfPS. l 1
NOTE: o FODOUT PAGE SHOUm BE OPEN.
o COhTAINAfEh7 PRESSURE SHOULD BE Af0NITORED. IF i PRESSURE APPROACHES 40 PSIG, OPEN FIRE STAIN TO COhTAINhfEhT SPRAY. RH Af0V 31, TO REDUCE PRESSURE, WHEN PRESSURE DECREASES TO 3S PSIG, CLOSE RH Af0V 31. ;
I RESETSI ANDCONTAINMENT !
ISOLNDON:
- a. Check containment pressure - a. Perform the following: i LESS THAN 5 PSIG i
- 1. Open CKTs A13 and B13 in DC panels A and B.
- 2. Reset SI WL Relays.
l l
l Page 2 of 8 i
JUN 0 31988 :
NUMBER TTIU REY. ISSUE /DATE ES.I.3 TRANSFER TO RHR RECIRCULATION Rev,5 l
STEP ACTION /EXPECfED RESPONSE RESPONSE NOT OBTAINED l
1 3. E charging pump control i switch (es) are SQIin TPO, {
IIEE restore low discharge j pressure auto stan for shutdown chx ging pump (s) by taking pu '
control switch (es) to the "Tnp,mp position then releasing switch (es) !
to the "Auto" position. I l
4 QQIQ Step 2. l ,
- b. Remt Si and containment isolat'on (SEE OPPOSITE PAGE) i 2 OPEN SW MOV 5 AND SW MOV 6 LOCALLY OPEN SW MOV 5 AND l (SW TO RHR HX). ENSURE ONE SW SW MOV 6. ;
PUMP RUNNINO FOR EACH RHR HX !
3 ALION RHR SYSTEM FOR !
RECIRCULATION: ;
- a. Ch ck containment waterlevel- I GREATER THAN 2.25 FEET ,
l
- b. Open containment sump suction b. Locally open containment sump :
valve, RH MOV 22 suction valve, RH V 808A.
) '
E RH V 808A EQIopened. I
'nIEN locally open RH MOV 22 to i estabush a flow path from the sump to se RCS. !
i f i
E flow path EQIestablished, i THEN QQ IQ ECA 1,1, .
LOSS OF EMERGENCY COOLANT RECIRCULATION, Step 1. l
- c. Check core deluge valves, SI MOV 871 A c. Open SI MOV 871A and i and SI MOV 871B - OPEN SI MOV-871B. !
- d. Close SI MOV 861B and any one d. E SI MOV 861B EQIclosed, !
, other loop Siisolation MOV ItiEN close any two loop SI '
l isolation MOVs. *
- e. Stop both LPSI pumps and place i f control switches in'IPO l
i
, Page 3 of 8 l I
JUN 0 31988 NUMBER TTT12 REY. ISSUEMATE j ES.I.3 TRANSFER TO RiiR RECIRCULATION Rev. 5 i I
\
STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTAINED I i r .
7 CAUTION: o DO NOT START LPSI PUStPS %'ITH RH Af0V 874 OPEN.
LPSI PUAfP DISCHARGE PRESSURE %'1LL OVER PRESSURIZE THE HPSI BOOSTER PUSfP. l o DO NOT START (JSI PUSfPS %' HEN ON CONTAINAfENT SUhfP RECIRCULATION. LPSI PUh!P DISCHARGE '
PRESSURE H'lLL SEAT RHR PUSIP DISCHARGE CHECK VALVES AND SUStP RECIRCULATION %'lLL BE LOST. !
L J j 3 f. Stan one RHR pump f. IE pump does NOI stan.
DIEN start the other RHR pump.
IE NO RHR pump available, ElEN QD IC he '.a. a.:.
LOSS OF E'rMhNCY COOLANT RECIRCl(A flON, Step 1.
- g. Check one charging pump RUNNLNG g. Perfomt the following to stan a (Stop one pump if two running) charging pump:
- 1. Isolate sealinjection i
- 2. Check closed CH htOV 257. 3 IE NQIclosed, :
THEN manually QB locally close l CH htOV 257. l
- 3. Check open BA htOV 373. I IE NOIopen, i THEN manually op.en I B A htOV 373 08 BA stOV 32. I
- 4. Take charging pump control switch l to the "Trip" then to the "Stan" !
position. l IE NQ charging pump available,
, HiEN GO IQ ES 1.4, !
TRANSFER TO TWO PADI i RECIRCULATION, Step 3.
- h. Check RCS pressure - h. GQ IQ Step 3 j.
LESS THAN 1500 PSIO AstPS. i. GQIQ ES 1,4, l
- i. Check GREAniRRHRTHA pumh 140 AhtPS 1RANSFER TO TWO PAT 11 I
) RECIRCULATION, Step 1. l t
l Page 4 of 8
JUN 0 31988 NUMBER TTTU REY.15$UESATE i ES.I.3 TRANSFER TO RHR RE IRCULATION Rev.$
4 STEP ACTION / EXPECTED RESPONSE RESPONSE NOT OBTALNED 3 j. Check CH MOV 292B and J. Open CH MOY 292B and CH MOV 292C OPEN CH MOV ?92C.
- k. Fully open CH FCV 110 and CH FCV.110A i (Place control select switch in neutral, then manually open both valves) }
- l. Perform the following to isolate the charging suction header: 1 1 Stop all RCPs
- 2. Cose all four seal water returo MOVt.
3 Close CH TV 334 i
(Seal wster terum trip valve)
- 4. Stop metering pump I
- 5. Cose CH AOV 278(Metering i pump suction division valve)
- 6. Icontainment pressure is prester than 5 PSIO,
.liF.S perform the following:
, a. Close CH W 240, j CH TV 241 i (Seal water return trip valves) i
- b. Cose CC TV 1411 i (CCW return from RCP oil j celers) l
- m. Onen RH MOV 33A and Ril MOV 33B l
- n. Check RHR pump discharge pressure - n. Stop RHR pump, GREATER THAN 80 PSIG *1 T11EN GD TD ECA 1.1, LOSS OF EMERGENCY COOLANT REC 7J.CULATION, Step 1. ;
- o. Close CH MOV 257. l
- o. Check CH MOV 257 CLOSEO I
! p. Check BA MOV 32 CLOSED p.Ckse BA MOV 32.
l
! q. Cose BA MOV 373 I, l ;
. i l
I Page 5 of 8 l
l L
JUN 0 31988 NUMBER TTTLE REV ISSUE /DATE i ES 1,3 TRANSFER TO RHR RECIRCULATION Rev.5 l
. I
(
STEP ACTION /EXECIED RESPONSE RESPONSE NOT 03TAINED l'
3 r. Check RHR and charging pumps - r. E RHR ump cavitating, ,
NOT CAVITATING THEN rform the following:
- a. Stop operating charging pump.
- b. Stop operating RHR pump.
- c. Open BA hiOV-373.
- d. Close RH hiOV-33A and RH hiOV 330.
- e. Start a charging sump.
- f. QQIQ ECA 1.L.
LOSS OF EhiERGENCY COOLANT RECIRCULATION, Step 1. *1 E charging pung cavitating THEN perfomi tne following:
- a. Equally throttle both core deluge isolatioa hiOVs until operating RHR pump AhiPs are less than 220 AhiPs.
- s. Stop both HPSI pumps 4 VFRIFY RHR AND CHARGING FLOW BY hiONITORING REACTOR VESSEL FLUID LEVEL,TEhiPERATURE AND SUBCOOLING TO ENSURE ADEQUATE CORE COOLING Page 6 of 8
JUN 0 31988 4
NUMBER TTIII REY. ISSUE /DATE ES.I.3 TRANSFER TO RHR RECIRCULATION Rev. 5 l
(
5TEP ACTION /EXPECIED RESPONSE RESPONSE NOT OBTAINED 5 OPEN AND LOCK OPEN BREAKERS FOR: !
BA MOV-373, BA MOV-32, j SI MOV 861 A, SI MOV-861B l SI MOV 861C, SI MOV 861D :
SI MOV 871 A, SI MOV 871B i LD MOV 200, CH MOV 257 l RH MOV 22 ;
6 MONITOR CORE EXIT E APPROACHING 700' F, I THERMOCOUPLES - THEN PERFORM THE FOLLiW/ING: !
LESS THAN 700* F !
o Stan additional charging pump.
.QR o Stan additional HPSI pump.
7 MONITOR CHARGING AND IE RHR PUMP CAVITATING, l RHR PUMPS NOT CAVITATINO THEN PERFORM THE FOLLOWING: I
- a. Stop operating charging pump.
- b. Stop operating RHR pump. i
- c. Open BA MOV-373.
- d. Close RH MOV-33A and l RH MOV-33B. l
- e. Start a charging pump. i
- f. QQIQ ECA-1.1, l LOSS OF EMERGENCY l COOLANT RECIRCULATION, :
Step 1. *3 !
t IE CHARGING PUMP CAVITAT NG, l IllEN PERFORM TiiE FOLLOWING: ;
- a. Equally throttle both core deluge isolation MOVs until operating RHR pump AMPS are less than 220 AMPS.
8 MAINTAIN SEAL INJECTION TO ,
RCPs DURING COOLDOWN I l
9 CONTINUE COOLDOWN OF l TIIE RCS TO LESS THAN 200* F l l
l l
Page 7 of 8
JUN 0 31988 NUMBER Tm2 REV. ISSUE /DATE l E S - 1.3 TRANSFER TO RIIR RECIRCULATION Rev.5 i
(
STEP ACTION /EXPECIED RESPONSE RESPONSE NOT OBTAINED NOTE: WHEN RCS PRESSURE IS LESS THAN 100 PSIG AND RCS l TEMPERATURE IS LESS THAN 200*F, CONSULT WITH PLANT i ENGINEERING STAFF PRIOR TO TERMINATING TWO PATH \
RECIRCULATION (TO PREVENT BORIC ACID PRECIPITATION). l 10 WHEN RCS PRESSURE IS LESS CLOSE SEAL WATER RETURN THAN 100 PSIG VERIFY SEAL MOVs.
WATER RETURN MOVs CLOSED 11 WHENTHE RCS IS AT ATMOSPHERIC PRESSURE PERFORM THE FOLLOWING:
- a. Isolate sealinjection to all four RCPs
- b. Close CH MOV 2928 and CH MOV 292C i
- c. Stop operating charging pump ;
12 CLOSE RH MOV 33A AND RH MOV 33B 13 OPEN AND LOCK BREAKERS FOR t RH MOV-33A AND RH MOV 33B l l
14 RETURN IQ PROCEDURE AND STEP l IN EFFECT l l
END i
l l
l l
Page 8 of 8
. - - _ , . . _ . _ - _ _ __ . - - - - - . _ _ _ _ _ _ _ .