ML20204J954
| ML20204J954 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Haddam Neck, 05000000 |
| Issue date: | 06/03/1988 |
| From: | CONNECTICUT YANKEE ATOMIC POWER CO. |
| To: | |
| Shared Package | |
| ML20204H467 | List:
|
| References | |
| FR-C.3, NUDOCS 8810250300 | |
| Download: ML20204J954 (3) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _
3 1986 NUMBER TTT12 REY. ISSUE /DATE FR C.3 RESPONSE TO SATURATED CORE COOLING Rev. 1 I
A.
PURPOSE This procedure provides actions to restore subcooled core cooling.
B.
SYMPTOMS OR ENTRY CONDITIONS Dis meedure is entered from F 0.2, CORE COOLING Critical Safety Function Status Tree, on YjiLLOW condition.
I 1
i
)
Page 1 of 3 8810250300 001007 PDR ADOCK 05000213 i
P PDR
JUN 3 1988 NUMBER TTT U REY. ISSLT/DATE i
FR.C.3 RESPONSE TO SATURATED CORE COOLING Rev.1 STEP ACT10N/ EXPECTED RESPONSE RESPONSE NOT OBTAISTD
,l r
CAUTION:
IF THL RWST LEVEL DECREASES TO LESS THAN 130.000 GALLONS, THE SI SYSTEM SHOULD BE A12GNED FOR RHR RECIRCULATION USING ES 1J, TRANSFER TO RHR RECIRCULATION.
L J
NOTE:
IF ECA 3.2 SGTR WITH LOSS OF REACTOR COOLANT -
SATURATED RECOVERY DESIRED, lS IN EFFECT, 7HIS PROCEDURE SHOULD NOTBE PERFORMED.
1 CIIECK RiiR SYSEM HAS NOT GQIQ AOP 3.212, BEEN PLACED IN SERVICE LOSS OF RIIR SYSTEM.
2 VERIFY SI FLOW:
- a. Check charging pump flow
- a. Start charging pumps and align indicators -
valves as necessary.
INDICATE FLOW
- b. Check liPSI pump AMP meten -
- b. Start HPSI pumps and align valves GREATER DIAN 115 AMPS as necessary.
I
- c. Check RCS pn:ssure -
- e. QQ IQ Step 3.
LESS TIIAN 405 PSIO (635 PSIG FOR ADVERSE CONTAINMEST)
- d. Start LPSI pumps and align valves GREATERillAN 60 AMPS as necessary.
I Page 2 of 3
JUN 3 1988 HUGER EU REY. lSSUESA1E FR C.3 RESPONSE TO SATURATED CORE COOLING Rev.1 s
STEP ACT10N/ EXPECTED RESPONSE RESPONSE NOT OBTAIST.D 3
CHECK RCS VENT AhD DRAIN PATES CLOSED:
- a. Check power to PRZR PORY
- a. Restore power to PRZR PORY block valves -
block valves.
AVAILABLE
- b. Check PRZR PORVs CLOSED
- b. Manually close PRZR PORVs.
IE any PORV can EQI be closed.
'IHEN manually close its block valve.
- c. Check other RCS vent paths -
- d. Check drain header ISOLATED
- e. Checkletdown ISOLATED
- e. Cose letdown isolation valve LD MOV 200.
4 RETURNIQ PROCEDURE AND STEP IN EFFECT END I
l Page 3 of 3