Forwards Safety Insp Repts 50-277/85-36 & 50-278/85-34 on 851016-18.No Violation Noted.Four Areas Identified W/ Potential to Degrade Overall Emergency Response Capability
ML20138D532
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/09/1985
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20138D535 List:
References
NUDOCS 8512130247
Download: ML20138D532 (2)


See also: IR 05000277/1985036

Text

_ _ _ _

.

.

O

DEC 0 91985

,

Docket Nos. 50-277 License Nos. DPR-44

50-278 DPR-56

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection Nos. 50-277/85-36 and 50-278/85-34

This refers to the routine safety inspection of emergency preparedness

activities conducted during the period October 16-18, 1985 at the Peach

Bottom Atomic Power Station and to the discussions of our findings held by

Mr. Hawxhurst with Mr. T. Ullrich and members of your staff at the conclusion

of the inspection.

No violations were identified. However, four areas were identified that ,

potentially could degrade the overall emergency response capability of the

PBAPS site. These areas can be summarized as follows: responsibilities and

authorities in the present emergency organization are not clearly defined;

emergency action levels (EALs) don't appear to be symptom related or contain

the decisional guidelines necessary to escalate appropriately; all personnel

in the emergency organization shall be trained, including practical applica-

tions (i.e., walkthrus, drills...); and the dose assessment methodology should

incorporate the best available actual plant and environmental conditions and

also projections and field data, if available, to determine protective action

recommendations.

As previously identified in a letter to you, dated November 5,1985, we have

confirmed the schedule for corrective action.

Your cooperation with us is appreciated.

Sincerely,

OriEinal Signod 378

i Ronald R. Bellamy, Chief

B51213o247 es1209 Emergency Preparedness and

7. Radiological Protection Branch

.. PDR ADOCK 0500

t G Division of Radiation Safety

and Safeguards

Enclosure: NRC Region I Combined Inspection Report Nos. 50-277/85-36 and

50-278/85-34

0FFICIAL RECORD COPY EMER EXERCISE - 0001.0.0

12/04/85 6,

o

.

'

_ _ _ _- ._ __ _ ._.

_

. . . _ .

.

. .

Philadelphia Electric Company 2

, cc w/ enc 1:

R. S. Fleischmann, Station Superintendent

John S. Kemper, Vice President, Engineering and Research

Troy B. Conner, Jr. , Esquire

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric

'

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

-

.Raymond L. Hovis, Esquire

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

W. M. Alden, Engineer in Charge, Licensing Section

'

Public Document Room (PDR)~

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

j bec w/ enc 1:

i Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

l Section Chief, DRP

,

FEMA Region III

t

,

i

4

4

RI:DRSS RI:DRSS. g, M

Hawxhurst/ms pp;gpr ,

-

12/ /85 12/U/85

s 0FFICIAL RECORD COPY EMER EXERCISE - 0002.0.0 ,

12/04/85

i

4

i

,

---y ,e-- r, -

w-- -- - -,.,or e - . - - - r- -ene---+--------- m---.c~m..-- , ---