Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N8911999-10-15015 October 1999 Forwards Rept of Changes,Tests & Experiments at Pilgrim Nuclear Power Station for Period of 970422-990621,IAW 10CFR50.59(b).List of Changes Effecting Fsar,Encl ML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20217C3151999-10-0606 October 1999 Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 991207.Without Encl ML20217D5591999-10-0505 October 1999 Documents Pilgrim Nuclear Power Station Five Yr Survey of Main Breakwater.Survey Has Determined That Pilgrim Main Breakwater Is Intact & Remains Adequately Constructed to Perform Designed Safety Function ML20217C8051999-10-0505 October 1999 Forwards Proprietary Results of Audiologic Evaluations for Jp Giar,License SOP-10061-3.Attachment Clearly Shows Requirements for Operator Hearing Ability Are Met. Proprietary Info Withheld,Per 10CFR2.790(a)(6) ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20216J9961999-09-29029 September 1999 Forwards Resume of Person Identified as Acting RPM in Licensee to NRC Re Notification That Person Named in License Condition 11 of 20-07626-02,is No Longer Employed at Pilgrim Station.Resume Withheld,Per 10CFR2.790 ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212H1381999-09-23023 September 1999 Submits Info in Support of Request Filed on 990730 to Grant one-time Exemption from 10CFR50,App E,Authorizing Biennial Full Participation Emergency Preparedness Exercise to Be Conducted in 2002 Instead of 2001 ML20212H1441999-09-23023 September 1999 Withdraws 990121 Request for License Change Re Emergency Core Cooling Sys Net Positive Suction Head,Due to Incorrect Datum Preparation ML20216F3451999-09-16016 September 1999 Forwards Summary Rept Providing Results of ISI Conducted at PNPS on-line & Refueling Outage (RFO 12) ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20216E7111999-09-0909 September 1999 Forwards License Renewal Application Including Form NRC-398 & Form NRC-396 for Jp Giar,License SOP-10061-3.Without Encls ML20216E5891999-09-0707 September 1999 Forwards Copy of Pilgrim Station Organization Structure. Encl Refelcts Changes in Upper Mgt Level Structure.Changes Were Effective 990901 ML20211M4501999-09-0303 September 1999 Informs That Pilgrim Nuclear Power Station Plans to Conduct Full Participation Emergency Preparedness Exercise with Commonwealth of Ma on 991207,IAW 10CFR50,App E,Section IV.F.2 ML20211M9161999-08-31031 August 1999 Submits Review & Correction of Info in Reactor Vessel Integrity Database (Rvid),Version 2,re Pilgrim Station ML20211J8391999-08-30030 August 1999 Forwards Rev 1 to Provisional Decommissioning Trust Agreement for Plant,Changing Portions of Agreement to Permit Up to Two Distributions & Clarify Formula for Distribution ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20211C3381999-08-19019 August 1999 Provides semi-annual LTP Update,Including Schedule, Commitment Descriptions,Progress Since Last Update & Summary of Changes.Rev Bars Indicate Changes in Status Since Last Submittal ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20211B3841999-08-16016 August 1999 Forwards Response to NRC Second RAI Re Pressure Locking & Thermal Binding of SR power-operated Gate Valves ML20210U4831999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data Sheets for Period of 990101-0630,per 10CFR26.71(d) ML20210S0891999-08-0909 August 1999 Forwards Amend 11 to Indemnity Agreement B-48 Signed by Boston Edison Co & Entergy Nuclear Generation Co ML20210R6251999-08-0606 August 1999 Provides Supplementary Info on USI A-46 Implementation Methodology at Pilgrim Station,To Enable NRC to Perform Evaluation & Issuance of Plant Specific SER for Plant ML20210M9411999-08-0202 August 1999 Requests That NRC Treat Pending Actions Requested by Beco Prior to 990713,as Requests Made by Entergy.Ltr Requests That Minor Administrative Changes to License Amend 182 & Associated Ser, ,reflect 990713 Transfer ML20210H8761999-07-30030 July 1999 Requests That NRC Grant Exemption from Requirements of 10CFR50,App E,Section IV F,Which Would Authorize Rescheduling of 2001 Biennial Full Participation Emergency Preparedness Exercise for Pilgrim Station to 2002 ML20210H8661999-07-29029 July 1999 Provides Revised Response to GL 96-06 & Addresses NRC Insp Concern for Containment Penetration X-12.Info Submitted to Facilitate NRC Review & Closeout of Subject GL for Plant ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 ML20216D4131999-07-22022 July 1999 Informs That J Conlon,License OP-11040-1,terminated Employment with Beco on 990703,per 10CFR50.74.Individual Will Not Participate in Util Licensed Operator Requalification Training Program ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20210C4151999-07-19019 July 1999 Informs That Util Intends to Submit Approx Eight Licensing Actions in FY00 & Eight in FY01,in Response to Administrative Ltr 99-02.Actions Are Not Expected to Generate Complex Reviews ML20210F3711999-07-14014 July 1999 Informs NRC That Effective 990713,listed Pilgrim Station Security Plans Have Been Transferred from Boston Edison to Entergy & Are Still in Effect ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20209C7761999-07-0606 July 1999 Submits Annual Summary Rept of Changes Made to QAP Description as Described in QA Manual,Vol Ii.Rept Covers Period of Jul 1998 Through June 1999.No Changes Made During Period ML20209C3851999-07-0606 July 1999 Forwards Redacted Draft of Decommissioning Trust Agreement Re Transfer of PNPS & NRC Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generating Co ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20209B9411999-06-30030 June 1999 Discusses Deferral of IGSCC Welds to RFO 13.Deferral of Welds to Refueling Outage 13 Does Not Impact Acceptable Level of Quality & Safety Per 10CFR50.55(a)(3)(i) Since Plant in Compliance W/Exam Percentage Requirements ML20209B9431999-06-30030 June 1999 Provides Formal Notification That Closing Date for Sale & Transfer of Pilgrim Station Scheduled to Occur on 990713. a Wang Will Be Verbally Notified of Time of Sale Closing ML20209B9791999-06-29029 June 1999 Forwards Rev 13A to Pilgrims COLR for Cycle 13,IAW TS 5.6.5 Requirements.Rev 13A Provides cycle-specific Limits for Operating Pilgrim During Remainder of Cycle 13 ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209A8701999-06-25025 June 1999 Responds to NRC Request for Info Re Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant,Reporting Status of Facility Y2K Readiness Encl ML20210U5901999-06-25025 June 1999 Opposes Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts.Expresses Skepticism Re Claim by Companies That Consumers Will Benefit from Proposed Consolidation & four-year Freeze in Base Rates ML20209C3431999-06-22022 June 1999 Forwards Addendum 1,Rev 14 to Pilgrim Station Security Plan,Iaw 10CFR50.54(p)(2).Changes Proposed Have Been Implemented & Constitute Increase in Plant Defense Plan Commitments.Encl Withheld,Per 10CFR73.21 1999-09-09
[Table view] Category:NRC TO UTILITY
MONTHYEARML20062E0071990-11-14014 November 1990 Forwards List of Unimplemented GSIs at Facility,Per Generic Ltr 90-04 ML20062D6651990-11-0808 November 1990 Ack Receipt of Forwarding Util Evaluation of NRC Inspector General Rept 90N-02 Re Offsite Emergency Planning ML20058G9761990-11-0707 November 1990 Forwards Safety Insp Rept 50-293/90-20 on 900816-1008 & Notice of Violation ML20058C5501990-10-26026 October 1990 Requests Written Policies & Procedures Needed for NRC Preparation for Planned fitness-for-duty Insp ML20062B4311990-10-17017 October 1990 Advises That 901012 Response to Generic Ltr 90-03 Re Vendor Interface for safety-related Components,Acceptable ML20062B7161990-10-12012 October 1990 Extends Invitation to Attend 910220-21 Util Symposium/ Workshop in King of Prussia,Pa Re Engineering Role in Plant Support.Interest to Participate,Intent to Attend & Approx Number of Representatives to Attend Requested by 901115 ML20062B6281990-10-12012 October 1990 Forwards Insp Rept 50-293/90-21 on 900905-07.Insp Conducted to Review Event of 900902-03 Which Involved Number of Component Malfunctions & Operational Complications Following Shutdown ML20059N7251990-10-0101 October 1990 Requests That Matls Listed in Encl Be Furnished to Assist Maint Program Team Insp Scheduled for 901105-16 ML20059K6901990-09-11011 September 1990 Forwards Transcript of 900906 Public Meeting in Plymouth,Ma W/State & Local Officials Re Emergency Planning.W/O Encl ML20059H5871990-09-0101 September 1990 Advises That Reactor Operator & Senior Reactor Operator Exams Scheduled for 901203.Encl Listed Ref Matl Requested ML20059J6521990-08-29029 August 1990 Forwards Safety Insp Rept 50-293/90-09 on 900806-10.No Violations Noted.Concludes That Engineering & Technical Support Organizations Continue to Provide Strong Station Support ML20059A1481990-08-17017 August 1990 Forwards 900816 Summary of 900807 Meeting Re Inservice Testing Program ML20058P0471990-08-0909 August 1990 Forwards Safety Insp Rept 50-293/90-18 on 900709-13.No Violations Noted ML20058N0401990-08-0606 August 1990 Discusses Licensee Engineering Initiatives.Power Reactor Licenses in Region 1 Should Initiate Similar Program to Provide Sharing of Info & Experiences Involving Engineering Initiatives & Solution to Problems Common to All ML20056A4801990-07-30030 July 1990 Forwards Safeguards Insp Rept 50-293/90-16 on 900625-29.No Violations Noted.One Unresolved Item Identified ML20058L7051990-07-27027 July 1990 Forwards Safety Insp Rept 50-293/90-17 on 900625-29.No Violations Noted ML20055F2461990-06-29029 June 1990 Forwards Safety Insp Rept 50-293/90-13 on 900501-0611.No Violations Noted.Repetitive Failures of Diesel Driven Fire Pump Noted,Requiring Increased Mgt Attention ML20059M8421990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20247R8071989-09-21021 September 1989 Forwards SALP Rept 50-293/88-99 for 880516-890630.Instances of Deviation from Approved Practices & Lack of Attention to Detail Which Led to Challenges to Plant Equipment & Personnel Noted ML20247K6661989-09-0707 September 1989 Forwards Insp Rept 50-293/89-07 on 890525-0710 & Notice of Violation ML20246K5091989-08-24024 August 1989 Accepts Summary of QA Program Description Changes for 1989, Forwarded by ML20246L7821989-08-23023 August 1989 Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000.Failures to Properly Plan, Supervise & Inspect Tagout of Circuit Breakers Directly Contributed to Event IR 05000293/19890071989-08-18018 August 1989 Approves Reactor Operation Up to 75% of Full Power Per Licensee Power Ascension Test Program.Nrc Findings Docketed in Insp Repts 50-293/89-07 & 50-293/89-08 & Status of Emergency Preparedness for Communities Encl ML20246G1861989-08-18018 August 1989 Approves Reactor Operation Up to 75% of Full Power Per Licensee Power Ascension Test Program.Nrc Findings Docketed in Insp Repts 50-293/89-07 & 50-293/89-08 & Status of Emergency Preparedness for Communities Encl ML20246J4811989-08-18018 August 1989 Clarifies NRC Position Re Definition of Extremity for Purposes of Setting Occupational Exposure Limits.Due to Misunderstanding,No Enforcement Action Planned If Licensee Procedures Incorporated Misunderstanding ML20246D7261989-08-18018 August 1989 Submits Response to Re Plant Power Ascension Program.Util Proposal to Defer Phase 2 of Shutdown from Outside Control Room Test to Planned Fall 1989 mid-cycle Outage Accepted ML20245F1781989-07-31031 July 1989 Forwards Insp Rept 50-293/89-06 on 890411-0524.No Violations Noted.Licensee Actions W/Respect to 890503 Turbine Trip/Reactor Scram Demonstrated Excellent Approach to Problem Investigation & Resolution ML20247D0181989-07-18018 July 1989 Ack Receipt of Re Response to NRC Bulletin 89-003, Inadequate Latch Engagement in Hfa Type Relays Mfg by Ge. Necessary Actions Performed to Address Issues in Bulletin ML20246N3921989-07-14014 July 1989 Forwards Safety Insp Rept 50-293/89-09 on 890619-22.No Violations Noted ML20246D4961989-07-0606 July 1989 Advises That 880713 Response to NRC Bulletin 88-004, Potential Safety-Related Pump Loss Acceptable ML20246A7561989-06-26026 June 1989 Approves Reactor Operation Up to 50% Full Power,Per Util Power Ascension Test Program & Confirmatory Action Ltr 86-10.Assessment of Licensee Readiness for Release from NRC Approval Point 3 & Related Info Encl ML20246B5961989-06-22022 June 1989 Forwards,For Info,Nrr Ack Receipt of Petition Filed by Ecology Ctr of Southern CA & Stating That Petition Being Treated Under 10CFR2.206 of Commission Regulations ML20245A5371989-06-0909 June 1989 Forwards Insp Rept 50-293/89-05 on 890311-0410.Weaknesses Noted Re Evaluation of Failure Rate & Root Causes for Failures of Airlock Doors & Interlocks ML20244C2121989-06-0707 June 1989 Responds to Util 881011 Response to Generic Ltr 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors. Implementation Schedule Contingent Upon Resolution of Procedure ML20244C2751989-06-0606 June 1989 Forwards Draft Safety Evaluation Re Plant Compliance W/ 10CFR50.62, ATWS Rule. Requests Response to NRC Concerns Re Diversity & Testability of Alternate Rod Injection & Reactor Pump Trip Sys NUREG-1275, Informs That Util Fulfilled Requirements of Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety Related Sys1989-06-0202 June 1989 Informs That Util Fulfilled Requirements of Generic Ltr 88-14, Instrument Air Supply Sys Problems Affecting Safety Related Sys ML20247P5501989-06-0101 June 1989 Forwards Request for Addl Info on Proposed Tech Specs Change Re Visual Insp of High Energy Piping.Listed Concerns Based on Review of Bechtel Calculation 17322-S5,Rev 1 ML20247M2661989-05-26026 May 1989 Forwards Director'S Decision,Ltr of Transmittal & Fr Notice in Response to Ocre 2.206 Petition Expressing Concerns Re 880309 Power Oscillation Event at LaSalle Unit 2 & Request to Reopen Rulemaking on ATWS Issue.W/O Encls ML20246P6051989-05-15015 May 1989 Forwards Notice of Withdrawal of Application for Amend to License DPR-35.Amend Would Modify Tech Specs Re ECCS Surveillance Requirements ML20247D5481989-05-0808 May 1989 Forwards Augmented Insp Team Rept 50-293/89-80 on 890413-19 & 17-26.Team Concluded That Safety Significance of 890412 Pressurization Transient Was Minor,Though Event Raised Concerns Re Proximate Human Factors & Equipment ML20246N7951989-05-0404 May 1989 Forwards Mgt Meeting Rept 50-293/89-04 on 890328-30 W/Commonwealth of Ma & Local Officials ML20247A6911989-05-0303 May 1989 Extends Invitation to Attend Power Reactor Operator Licensing Seminar on 890531 in King of Prussia,Pa.Agenda & Info Re Lodging Arrangements Encl ML20245H8371989-04-26026 April 1989 Forwards SAIC-89/1121, In-Progress Audit Rept of Dcrdr at Boston Edison Co Pilgrim Nuclear Power Station & SAIC-89-1119, In-Progress Audit Rept for Boston Edison Co Pilgrim Nuclear Poser Station Spds ML20245H9551989-04-26026 April 1989 Forwards Insp Rept 50-293/89-01 on 890206-0310 & Notice of Violation ML20245J1441989-04-25025 April 1989 Advises That 880921 & 890302 Responses to NRC Bulletin 88-007 & Suppl 1, Power Oscillations in BWRs Meet Requirements of Both Bulletins ML20244E4611989-04-14014 April 1989 Requests Prompt Review & Reporting of Status of Implementation of TMI Action Plan Items at Facility.Printout of All TMI Items Annotated Where Tracking Sys Indicates That Implementation Not Complete Encl ML20244C2771989-04-10010 April 1989 Informs of Completion of Followup on Plant Regulatory Effectiveness Review Effort & Activities Re TAC 56995. Previous Compensatory Measures Removed as Result of Implementing Corrective Action ML20244A6931989-04-0707 April 1989 Forwards Mgt Meeting Rept 50-293/89-43 on 890309 to Discuss Util Followup Actions to 890304 Reactor Scram ML20244A6281989-04-0303 April 1989 Forwards Insp Rept 50-293/88-37 on 881227-890205.Violation Noted Re Failure to Control Locked High Radiation Area Access ML20235V7311989-03-0303 March 1989 Forwards Safety Evaluation Accepting Revised Temp Profile, Per GE EAS-98-0887, Drywell Temp Analysis for Pilgrim Nuclear Power Station. Profile Requested to Be Documented in Next Updated FSAR 1990-09-11
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217D3951999-10-13013 October 1999 Forwards Request for Addl Info Re Util 990806 Submittal on USI A-46, Implementation Methodology Used at Pilgrim Nuclear Power Station, Per GL 87-02 ML20217E1581999-10-0808 October 1999 Forwards Insp Rept 50-293/99-05 on 990726-0905.Three Violations Noted & Being Treated as Ncvs.Violations Include Failure to Assure That Design Bases Correctly Translated Into Specifications ML20212J8301999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Integrate Performance Info & to Plan Insp Activities at Facility Over Next Six Months ML20212F7871999-09-24024 September 1999 Advises That Util 990121 Application for Amend Being Treated as Withdrawn.Proposed Changes Would Have Modified Facility UFSAR Pertaining to Values for post-accident Containment Pressure Credited in Pilgrim Net Positive Head Analyses ML20212C2861999-09-16016 September 1999 Forwards SER Accepting Licensee 981123 Request for Relief RR-E1,RR-E5,RR-E6 Pursuant to 10CFR50.55a(a)(3)(i) & Request for Relief RR-E2,RR-E3 & RR-E4 Pursuant to 10CFR50.55a(a)(3)(ii) ML20211H5701999-08-27027 August 1999 Forwards Insp Rept 50-293/99-04 on 990610-0725.Two Violations Identified Being Treated as non-cited Violations ML20210U7521999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opossing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5761999-08-18018 August 1999 Responds to Opposing Merger of Bec Energy & Commonwealth Energy Sys in Commonwealth of Massachusetts. Informs That for Sale,Nrc Responsible for Only Ensuring That Entergy Technically & Financially Qualified to Operate NPP ML20210U6691999-08-18018 August 1999 Forwards from Massachusetts State Senator T Murray Opposing Merger Between Bec Energy & Commonwealth Energy Systems ML20210U5151999-08-17017 August 1999 Forwards Notice of Withdrawal of Application for Approval of Indirect Transfer of FOL for Pilgrim in Response to .Approval No Longer Needed Since Beco Sold Interest in Pilgrim to EOI on 990713 ML20216E2321999-07-26026 July 1999 Discusses GL 92-01,rev 1,suppl 1, Rv Structural Integrity. NRC Revised Info in Rvid & Releasing as Rvid Version 2 ML20210E2231999-07-20020 July 1999 Discusses Arrangements Made by Dennis & M Santiago During 990615 Telephone Conversation for NRC to Inspect Licensed Operator Requalification Program at Pilgrim During Wk of 991004 ML20210A9441999-07-14014 July 1999 Responds to Re Changes to Pilgrim Nuclear Power Station Physical Security Plan Identified as Issue 2,rev 14, Addendum 1,respectively.No NRC Approval Is Required IAW 10CFR54(p) ML20209G2251999-07-0909 July 1999 Forwards Insp Rept 50-293/99-03 on 990419-0609.Five Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C. Several Individual Tagging Errors Occurred ML20209C4661999-07-0707 July 1999 Forwards SE Accepting Addendum on Proposed Change in Corporate Ownership Structure Involving Entergy Nuclear Generation Co ML20196J7251999-07-0101 July 1999 Informs of Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, for Pilgrim Nuclear Power Station ML20196H2381999-06-29029 June 1999 Forwards SER Denying Licensee 980820 Request for Alternative Under PRR-13,rev 2 for Use of Code Case N-522 During Pressure Testing of Containment Penetration Piping ML20209A8761999-06-28028 June 1999 Forwards SER Authorizing Licensee 990317 Relief Request to Use ASME Code Case N-573 as Alternative to ASME Code Section XI Article IWA-4000 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20195K3071999-06-15015 June 1999 Forwards Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Plant ML20195K3851999-06-11011 June 1999 Forwards Copy of Notice of Consideration of Approval of Application Re Proposed Corporate Merger & Opportunity for Hearing.Application Seeks Approval of Proposed Indirect Transfer of FOL for Plant ML20196K9921999-06-0404 June 1999 Informs That NRC Ofc of NRR Reorganized Effective 990328.As Part of Reorganization,Division of Licensing Project Mgt Created ML20207E7351999-05-27027 May 1999 Responds to Requesting Reduction in IGSCC Insp Frequency Per GL 88-01 to Be Performed During Upcoming RFO 12.Forwards SE Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of H Water Chemistry ML20207B6341999-05-26026 May 1999 Informs That Licensee 990415 Submittal Re Financial Position of Entergy Intl Ltd,Llc Will Be Marked as Proprietary & Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act ML20207B7391999-05-24024 May 1999 Forwards from Kc Goss of FEMA to Cl Miller Forwarding FEMA Analysis of Prompt Alert & Notification Sys for Pilgrim Nuclear Power Station.Based on Review,No Significant Problems Exist with Alert & Notification Sys ML20207B0701999-05-24024 May 1999 Responds to Sent to Ofc of Congressional Affairs Requesting Info on Concerns Raised by One Constituent,J Riel Re Y2K Compliance of Pilgrim NPP in Plymouth,Ma ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206U7501999-05-17017 May 1999 Forwards Insp Rept 50-293/99-02 on 990308-0418.Two Severity Level 4 Violations Occurred & Being Treated as NCVs ML20206M1891999-05-11011 May 1999 Forwards SE of 980826 Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Sys Piping for Plant ML20206E0551999-04-29029 April 1999 Discusses Bulletin 96-03 Issued on 960506 & Beco Responses ,970207,981230,990121 & 990309 for Pilgrim Npp. Determined That Actions Taken Should Minimize Potential for Clogging of ECCS Suction Strainers ML20206B3031999-04-20020 April 1999 Forwards Insp Rept 50-293/99-01 on 990125-0307.Two Violations of NRC Requirements Occurred & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy.Security Program Was Also Inspected ML20205Q9491999-04-0909 April 1999 Informs That on 990225 NRC Staff Completed PPR of Pilgrim Nuclear Power Station.Staff Conducts Reviews for All Operating NPPs to Develop an Integrated Understanding of Safety Performance ML20205B9391999-03-24024 March 1999 Forwards Second Request for Addl Info Re GL 95-07, Pressure-Locking & Thermal-Binding of Safety-Related Power-Operated Gate Valves ML20204C7871999-03-17017 March 1999 Informs That Application Submitting Transfer of Facility Operating License & Matls License & Proposed Amend, Will Be Marked as Proprietary & Be Withheld from Public Disclosure Pursuant to 10CFR2.709(b)(5) ML20199K8321999-01-22022 January 1999 Forwards Request for Addl Info Re Transfer of Facility Operating License for Plant ML20199H5811999-01-20020 January 1999 Submits Exemption Withdrawal of 10CFR70.24(a) Re Criticality Accident Monitoring Requirements ML20198L7781998-12-22022 December 1998 Forwards Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted.Nrc Regional Specialists Reviewed EP & Fire Protection Programs.Ep Program Was Found to Be Well Implemented ML20198J0891998-12-21021 December 1998 Forwards NRC Response to Me Lampert Re Transfer of Ownership of Pilgrim Station in Response to Senator Kerry Ltr Dtd 981019.NRC Will Terminate License Only When Licensee Remediates Site to Levels Specified in Regulations ML20198J1041998-12-21021 December 1998 Forwards NRC Response to Me Lampert Re Transfer of Ownership of Pilgrim Station in Response to Congressman Markey Ltr Dtd 981019.NRC Will Terminate License Only When Licensee Remediates Site to Levels Specified in Regulations ML20137T2211998-12-17017 December 1998 Responds to to Chairman Jackson Re Concerns About Possible Sale of Pilgrim Station & Waste Disposal Issues.No Application for License Received Nor Contract of Sale Between Beco & Entergy.Record Copy ML20198J1161998-12-17017 December 1998 Responds to to Chairman Jackson in Which Recipient Expressed Concern About Possible Sale of Pilgrim Station & About Waste Disposal Issues.Nrc Has Not Received Application for Transfer of License to Date ML20198P2781998-12-17017 December 1998 Final Response to FOIA Request for Documents.Forwards App a Records Being Released in Entirety.App B Records Being Withheld in Entirety (Ref FOIA Exemption 4) ML20198B2021998-12-0909 December 1998 Advises of Planned Insp Effort Resulting from Licensee Irpm Review.Details of Insp Plan for Next 6 Months & Historical Listing of Plant Issues Encl ML20197H8521998-12-0909 December 1998 Responds to Ltr Sent to Chairman SA Jackson on 981028 Re Concern That NRC Will Not Perform Environ Assessment in Connection with Consideration of Approval of Transfer of License for Plants to Permit Sale ML20196J1201998-12-0404 December 1998 Ack Receipt of 971217 & 30 & 980112,0309,0423 & 0630 Ltrs Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-293/97-02,50-293/97-11,50-293/97-13, 50-293/97-80 & 50-293/98-01.Actions Found Acceptable ML20196B5421998-11-24024 November 1998 Forwards Plant SRO & RO Initial Exam Rept 50-293/98-301OL During Wk of 981016-23 ML20196F7631998-11-24024 November 1998 Forwards Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted.Three Issues Identified Re Containment Flooding,Surveillance Testing Criteria & Protection for RBCCW System from High Energy Line Break Inside Drywell ML20196C1191998-11-20020 November 1998 Forwards Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted.During Insp Period,Chemical Decontamination of Residual Heat Removal Sys Was Well Planned & Implemented Which Reduced Radiation Doses in Heat Removal Quadrants ML20195H7361998-11-16016 November 1998 Informs of Individual Exam Results for Applicants on Initial Exam Conducted on 981016 & 981019-23 at Facility.Nine Applicants Were Administered Exam & Nine Passed.Licenses Issued & Individual Test Results Encl.Without Encl ML20155C4781998-10-29029 October 1998 Forwards RAI Re Resoultion to GL 96-06 Issues at Plant,Unit 1.Response Requested by 981130 ML20154J7881998-10-0808 October 1998 Authorizes Mb Santiago to Administer Initial Written Exams to Applicants Listed (Except Applicants Redlined), on 981016.NRC Region I Operator Licensing Staff Will Administer Operating Tests During Week of 981019 1999-09-30
[Table view] |
Inspection Report - Pilgrim - 1985013 |
---|
|
|
Text
,
-
, ,
SEP 171985 Docket No. 50-293 Boston Edison Company M/C Nuclear l ATTN: Mr. William D. Harrington
.
!- Senior Vice President, Nuclear
.800 Boylston Street Boston, Massachusetts 02199 i
l Gentlemen:
I Subject: Inspection Report No. 50-293/85-13
! We have received your August 15, 1985 letter and your response to the Notice of Violation and Notice of Deviation enclosed with our July 16, 1985 letter.
l Thank you for informing us of the correction and preventive actions documented in' your . letter. The implementation of your short term corrective actions was reviewed during Inspection No. 50-293/85-22 and were found acceptable. Your long term corrective actions were clarified by discussion between Mr. A. L.
L 0xsen of your office and Mr. R. Nimitz of this office on August- 23, 1985, l during Inspection No. 50-293/85-13. It.is our understanding that a Policy has l been established which requires a review of planned projects that involve either unusual radiological hazards / risks or approved contractor procedures to implement. If findings of the project review indicate that procedures are required for the project, procedure requ.irements and special conditions will be discusse Also, a plan will be developed to ensure that the required procedures or special conditions are developed. and approved prior to imple-
-menting the activities- requiring the procedures or special condition We will review the implementation of .these long-term corrective actions during a future. inspectio Inspection 50-293/85-13 also clarified your use of procedural steps as " sign-offs." Although your letter of August 15, 1985 stated that no " sign-offs" were included in the procedures referenced in Inspection Report No. 50-293/
85-13, the discussion between Mr. Oxsen and Mr. Nimitz concluded that appro-priate health physics " sign-off" steps were include Your cooperation with us is appreciate
Sincerely, Original Signed ByI fMM bbbgg Thomas T. Martin, Directc Division of Radiation Safety l and Safeguards
!
-
0FFICI AL RECORD COPY 0510020192 e50917 )\
PDR ADOCK 0 % g 3
,-
,
'
.
Boston Edison-Pilgrim 2 cc w/ encl:
A. V. Morisi, Manager, Nuclear Management Services Department C. J. Mathis, Station Manager Joanne Shotwell, Assistant Attorney General Paul Levy, Chairman, Department of Public Utilities W. J. Nolan, Chairman, Plymouth Board of Selectmen Plymouth Civil Defense Director Senator Edward P. Kirby Public Document Room (PDR)
Local Public Document Room (LPOR)
Nuclear Safety Information Center (NSIC)
NRC. Resident Inspector
' Commonwealth of Massachusetts (2)
'
bec w/ encl:
Region I Docket Room (with concurrences)
Section Chief, DRP RI:DRSS W
RI:DRS RI:DRSS RI:DRSS Nimitz/mmb Pasciak Bellamy Martin 9/ /85 9/ /85 9d(a/85 9/ /85
!
0FFICIAL RECORD COPY RL PILGRIM 85-13 - 0002.0.0 !
09/12/85 i
.
l
'
.
i .
BOSTON COlSON COMPANY bod DovLaTON STRECT D OSTON, M AS B ACHU B ETTm 0 219 9
~
WILLI AM D. HARRINGTON
.,,... m . n ..... ,
August 15, 1985 au n.a= BECo Ltr. #85- 152 l
Mr. Thomas T. Martin, Director
.
Division of Reactor Safety and Safeguards U.S. Nuclear Regulatory Commission Region I - 631 Park Avenue King of Prussia, PA 19405 License No. DPR-35 Docket No. 50-293 Subject: Response to Violation and Deviation as Contained in Inspection Report 85-13 References: NRC Ltr. to Boston Edison, dtd. July 16, 1985 Dcar Mr. Martin:
This letter is in response to the Violation and Deviation ~ identified during a routine radiological safety inspection conducted by Mr. R. L. Nimitz of your office on May 20-24, 1985 and communicated to Boston Edison Company in Appendices (A) and (B) of the referenc Notice of Violation (Appendix A)
Technical Specification 6.8 requires that written procedures and administrative policies be established, implemented and maintained, that meet or exceed the requirements and recommendations of Appendix ' A' of Regulatory Guide 1.33, 1972. This regulatory guide recommends, in part, that procedures for procedure review and approval be prepared. Station approved procedure 1.3.4, " Procedures," requires in Section III.A that approved written procedures be adhered to'by all station personne Procedure 1.3.4, Revision 27, specifies, in part, in Section C.3, that the Operations Review Committee (ORC) indicate its approval of a procedure to be included in Category Three Group procedure Contrary to.the above, as of May 23, 1985, two procedures, FP-OP-OO7-442 and FP-OP-OO8-442, used to provide guidance for cutting of control rod blades and LPRMs, were not presented to ORC for approval as Category.Three Group procedures. As a result, the ORC did not indicate its approval-of the procedures for use as Category Three l
Group procedure M wzco/7c
\
.
BO,ST0N EDISON COMPANY
,
Mr. Thomas T. Martin U.S. Nuclear Regulatory Commission ("3ust 15, 1985 Page Two
- Procedure No. 3.M.1-19, Revision 1, " Spent Fuel Pool Cleaning,"
specifies in Section IV, that the obtaining of a valid Maintenance Request (MR) is a prerequisite for procedure us Contrary to the above, as of May 23, 1985, procedure No. 3.M 1-19 was used to provide general guidance for cutting of control rod blades and LPRMs in the spent fuel pcol, but no valid Maintenance Request was in effec . Y Response y[ D Thecauseofthesubjectviolationwasanhlat case of an error in judgment on the part of the project manager wnv (1) incorrectly concluded that ORC approval was not required for the two subject procedures, and (2) failed to issue a Maintenance Request for the fuel pool cleanup tas On May 23, 1985, work associated with the spent fuel pool cleanup was stoppe Prior to restarting work, the following corrective steps were taken:
- Chem-Nuclear Procedures FP-OP-008-442 and FP-OP-OO7-442 were approved by the ORC as Category Three procedures in accordance with PNPS Procedure 1. Procedures associated with the spent fuel pool cleanup were reviewed for consistency and adequacy and changed as appropriat A Maintenance Request was issued for spent fuel cleanu Personnel (BEco and Contractors) directly involved in the fuel pool cleanup reviewed all procedures associated with the projec Pre-shift briefings with BECo and Contractor personnel were initiated and will continue prior to each shif The corrective steps listed above were completed and work was started
%
again on the fuel pool cleanup project on May 28, 1985. The above actions satisfactorily corrected the deficient condition. To preclude future violations, the proiect manaaer was counseled to pay closer attention to procedural requirements particularly during unusual evolutions such as the fuel pool cleanup, i
'
Full compliance was therefore achieved on May 28, 1985, the date on which corrective actions were complete Notice of Deviation (Appendix B)
'
As a result of the inspection conducted on May 20-24, 1985, and in i l
accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C), the following deviation was identified:
per my kI sw c h k*
I
-
1 y I -y 1
'
edhe P 'N 8 gfjog W t-
.
~
-
.
00'. TON IDISOM COMPABV
.
'
fir. Thomas T. Martin U.S. Nuclear Regulatory Commission August ih 1985 Page Thrce IE Dulletin 80-10 requires, in part, that: 1) a review of facilitj design and operation be performed to identify systems that are considered as nonradioactive, but could possibly become contaminated through interfaces with contaminated systems; 2) a routine sampling / analysis or monitoring program be' established for these systems in order to prortptly identify any contaminating events which could lead to unmonitored, uncontrolled, liquid or gaseous releases to the environment, including releases to on-site leaching fields and; 3) the specifics of these reviews be documented and made available to the NRC for review during future on-site inspection efforts. In particular, special consideration was to be given to the instrument air system and the sanitary waste system. The licensee's response to this Bulletin indicated that the above was implemente Contrary to the above, as of May 24, 1985: 1) the instrument air system and sanitary waste system had not been reviewed to determine if these systems could become contaminated through interfaces with contaminated systems; 2) no routine sampling / analysis or monitoring program (as appropriate) was established in order to promptly identify any contaminating events which could lead to unmonitored/ uncontrolled releases from these systems; and 3) no specifics relative to the above were documented and made available to the NR Response After discussion of the subject issues at the 5/24/85 exit meeting, Boston Edison took the followir.g corrective steps:
- On 5/24/85, a Special Instruction was issued to the Chemistry $b '
technicians, providing them specific instructions for analysis and reporting of results of normally clean systems if found to be radioactiv On 5/28/85, a memorandum was issued to the Nuclear Watch Engineers p[b referencing the requirements of the Bulletin and providing specific instructions for action when a normally clean system is found to be contaminate As corrective action' to avoid further deviations, the Engineering Department has been requested to perform an evaluation of facility design and operation, which will include the instrument air and sanitary 9:aste systems. The results of that evaluation will be factored into existing Station procedures and/or Work Instructions, as necessar , m-
"11 complia h was reached on May 28, 1985, the date on which both the Chemistry technicians and the Nuclear Watch Engineers were provided adequate guidance for action when a normally non-radioactive system becomes contaminate o Ps -
m u- @s 5os V ' pg fjeh M'
r .
,
B3L10N EDISON COMPANY
.
- nr. Thomas T. Martin U.S. Nuclear Regulatory Commission August 15, 1985
.
Page four NPC Concerns To address Mr. Nimitz' concerns as stated on Page (1) of the referenced letter, we would like to emphasize that, although a Maintenance Request was not generated in accordance with the prerequisite requirements of Procedure 3.M.1-19 (" Spent Fuel Pool Cleaning"), we maintained adequate communications and ensured adequate radiological protection of the workers involved through numerous Radiation Work Permits and constant HP coverage of fuel pool cleaning task We have conducted a root cause analysis and have determined that not filling out a Maintenance Request was an isolated l instance of failure to follow procedures on the part of the project manager. As mentioned earlier in this report, he has since been counseled on the importance of'following Station procedures. Additionally, in order to ensure improved oversight of ongoing radiological work, the Contractor
~ On-Site Assessor has been requested in his reviews to ensure personnel are using appropriately reviewed procedures and are knowledgeable in !
procedural requirement We would also like to correct what appears to be a misconception as reflected on Page 8 of the Inspection Report. The two vendor procedures used to control cutting work contained no specific radiological controls, but provided basic work instructions for the Chem-Nuclear personnel involved in the activitie Neither of the procedures required sign-offs by licensee radiological control technicians. Rather, the technicians stated in the procedure are those of the vendor, Chem-Nuclea If there are any questions concerning these matters, please do not hesitate to contact m Respectfully submitted, W. D. Harrington