Category:INSPECTION REPORT
MONTHYEARIR 05000293/19990051999-10-0808 October 1999 Insp Rept 50-293/99-05 on 990726-0905.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19990041999-08-27027 August 1999 Insp Rept 50-293/99-04 on 990610-0725.Non-cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20209G2331999-07-0909 July 1999 Insp Rept 50-293/99-03 on 990419-0609.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support.Response to Main Transformer Fire by Fire Brigade Members Was Good IR 05000293/19990021999-05-17017 May 1999 Insp Rept 50-293/99-02 on 990308-0418.Two Level 4 Violations Occurred & Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000293/19990011999-04-20020 April 1999 Insp Rept 50-293/99-01 on 990125-0307.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Also Included Routine Core Insp of Security Program During Period of 990301-05 IR 05000293/19980101998-12-22022 December 1998 Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support,Including Implementation of Fire Protection Program IR 05000293/19980081998-12-0101 December 1998 Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19982031998-11-24024 November 1998 Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted. Major Areas Inspected:Capability of Selected Sys to Perform Safety Functions Required by Design Bases,Adherence of Sys to Design & Licensing Bases & Consistency of Configuration IR 05000293/19980071998-10-0707 October 1998 Insp Rept 50-293/98-07 on 980726-0906.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19980061998-08-28028 August 1998 Insp Rept 50-293/98-06 on 980609-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19980091998-08-20020 August 1998 Insp Rept 50-293/98-09 on 980713-24.No Violations Noted. Major Areas Inspected:Engineering Activities in Areas Including Evaluations to Address Operability Concerns,C/A Process & Actions Associated W/Findings from Previous Insps IR 05000293/19980051998-07-0909 July 1998 Insp Rept 50-293/98-05 on 980421-0608.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Concerns W/Fire Proctection Area Were Identified ML20217P7801998-04-0303 April 1998 Insp Rept 50-293/98-03 on 980302-05 & 11-12.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Security Force Capability IR 05000293/19980011998-03-24024 March 1998 Insp Rept 50-293/98-01 on 980107-0224.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19970131998-02-0606 February 1998 Insp Rept 50-293/97-13 on 971111-980106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19970121997-12-17017 December 1997 Insp Rept 50-293/97-12 on 971006-10 & 1119.Violations Noted. Major Areas Inspected:Eq Documents for EQ Equipment That Required Requalification Due to Containment Environ Changes Resulting from CS Flow Rate Reduction in 1988 IR 05000293/19970111997-12-11011 December 1997 Insp Rept 50-293/97-11 on 970914-1110.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970101997-11-26026 November 1997 Insp Rept 50-293/97-10 on 971104-07.No Violations Noted. Major Areas Inspected:Emergency Response Organization, Simulated Events,Mitigation Actions Emergency Declarations & off-site Agencies IR 05000293/19970081997-10-24024 October 1997 Insp Rept 50-293/97-08 on 970805-0913.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20198L9231997-10-21021 October 1997 Insp Rept 50-293/97-05 on 970514-0828.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Engineering IR 05000293/19970071997-09-15015 September 1997 Insp Rept 50-293/97-07 on 970625-0816.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970801997-09-12012 September 1997 Insp Rept 50-293/97-80 on 970721-0801.Violations Noted.Major Areas Inspected:Effectiveness of Processes for Identifying Resolving & Preventing Issues That Degrade Quality of Plant Operations & Safety ML20216G8181997-09-0404 September 1997 Insp Rept 50-293/97-09 on 970827-28.No Violations Noted. Major Areas Inspected:Licensee Access Authorization Program IR 05000293/19970041997-08-0707 August 1997 Insp Rept 50-293/97-04 on 970505-23.No Violations Noted. Major Areas Inspected:Effectiveness of Licensees Efforts in Maintaining Design Basis of safety-related Sys ML20149K0431997-07-22022 July 1997 Insp Rept 50-293/97-03 on 970429-0624.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20141K7861997-05-22022 May 1997 Insp Rept 50-293/97-02 on 970303-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137E5671997-03-18018 March 1997 Insp Rept 50-293/97-01 on 970112-0302.Violations Noted.Major Areas Inspected:Operations,Engineering & Plant Support ML20134K5951997-02-0707 February 1997 Insp Rept 50-293/96-10 on 961123-970111.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19960081996-12-18018 December 1996 Insp Rept 50-293/96-08 on 960924-1122.Violation Noted.Major Areas Inspected:Engineering,Maint,Plant Support,Radioactive Effluent Controls Program,Radiological Environmental Monitoring & Meteorological Monitoring.Meeting Slides Encl IR 05000293/19960061996-10-30030 October 1996 Insp Rept 50-293/96-06 on 960729-0923.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129A0441996-10-11011 October 1996 Insp Rept 50-293/96-09 on 960916-20.Violations Noted. Major Areas Inspected:Miscellaneous Security & Safeguard Issues,Access Authorization Program & Administration Organization & Background Investigation Elements ML20129D8361996-09-20020 September 1996 Insp Rept 50-293/96-07 on 960708-12,0722-26 & 0828-0903. Non Cited Violation Noted.Major Areas Inspected:C/As After Licensee Had Identified Potentially Inoperable Primary Containment as Documented in LER 96-04 IR 05000293/19930201994-01-10010 January 1994 Insp Rept 50-293/93-20 on Stated Date.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Surveillance, Engineering & Plant Support IR 05000293/19930801993-12-21021 December 1993 Insp Rept 50-293/93-80 on 931018-23.No Violations Noted. Major Areas Inspected:Station Blackout Coping Sys,Onsite Ac Supplies & Reliability Program,Plant Mods & QA & Maint Practices for Station Blackout Equipment IR 05000293/19930191993-11-23023 November 1993 Insp Rept 50-293/93-19 on 930928-1101.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering,Plant Support,W/Regard to Security & NRC Info Notice 93-079 ML20058D4771993-11-19019 November 1993 Insp Rept 50-293/93-16 on 930830-1015.Violations Noted.Major Areas Inspected:Audits & Surveillances,Training & Qualifications,Radiological Problem Repts & Associated C/A IR 05000293/19930151993-10-15015 October 1993 Insp Rept 50-293/93-15 on 930817-0927.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls Maint & Surveillance,Emergency Preparedness,Security,Safety Assessment & Quality Verification IR 05000293/19930171993-09-24024 September 1993 Insp Rept 50-293/93-17 on 930830-0903.No Violations Noted. Major Areas Inspected:Mgt Controls,Qa Audits & ODCM IR 05000293/19930141993-09-0808 September 1993 Insp Rept 50-293/93-14 on 930713-0816.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support IR 05000293/19930111993-08-0404 August 1993 Insp Rept 50-293/93-11 on 930606-11.No Violations Noted. Major Areas Inspected:Licensee Corrective Actions of Previously Identified Electrical Distribution Sys Functional Insp Findings & Observations IR 05000293/19930011993-02-0303 February 1993 Insp Rept 50-293/93-01 on 930111-14.Weaknesses Noted.Major Areas Inspected:Eop Review,Rev,Approval Process,Qa Involvement in EOP Program & Operator Training in EOPs IR 05000293/19920811993-02-0202 February 1993 Probabilistic Risk Assessment Based Insp Rept 50-293/92-81 on 921130-1218.Violation Noted.Major Areas Inspected:Review of Emergency Diesel Generators & Hpcis.App a Encl IR 05000293/19920281993-01-28028 January 1993 Insp Rept 50-293/92-28 on 921124-1231.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security,Safety Assessment & Quality Verification IR 05000293/19920261993-01-21021 January 1993 Insp Rept 50-293/92-26 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Ep Program Changes, Emergency Response Facilities,Equipment,Instrumentation, Supplies & Organization & Mgt Control IR 05000293/19920231992-12-29029 December 1992 Safety Insp Rept 50-293/92-23 on 921020-1123.No Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security & Safety Assessment & Quality Verification IR 05000293/19920241992-11-23023 November 1992 Insp Rept 50-293/92-24 on Stated Date.No Safety Concerns or Violations Noted.Major Areas Inspected:Audits & Surveillances,Collective Personnel Exposure Status,Outage Radiological Controls & Implementation of Exposure Programs IR 05000293/19900201990-11-0707 November 1990 Safety Insp Rept 50-293/90-20 on 900816-1008.Violation Noted.Major Areas Inspected:Plant Operations,Security, Maint & Surveillance,Engineering & Technical Support, Radiological Controls,Emergency Preparedness & Safety IR 05000293/19900211990-10-11011 October 1990 Insp Rept 50-293/90-21 on 900905-07.Major Areas Inspected: 900902-03 Event Involving Number of Component Malfunctions & Operational Complications Following Shutdown.Operating Procedures Lacked Adequate Guidance for Operators IR 05000293/19900091990-08-20020 August 1990 Insp Rept 50-293/90-09 on 900806-10.No Violations or Deviations Noted.Major Areas Inspected:Control of Design, Design Changes,Mods,Engineering & Technical Support Organization,Staffing,Communications,Qa & Training IR 05000293/19900161990-07-30030 July 1990 Partially Withheld Physical Security Insp Rept 50-293/90-16 on 900625-29 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support & Program Plans,Protected & Vital Area Physical Barriers & Detection & Assessment Aids 1999-08-27
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000293/19990051999-10-0808 October 1999 Insp Rept 50-293/99-05 on 990726-0905.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19990041999-08-27027 August 1999 Insp Rept 50-293/99-04 on 990610-0725.Non-cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20209G2331999-07-0909 July 1999 Insp Rept 50-293/99-03 on 990419-0609.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support.Response to Main Transformer Fire by Fire Brigade Members Was Good IR 05000293/19990021999-05-17017 May 1999 Insp Rept 50-293/99-02 on 990308-0418.Two Level 4 Violations Occurred & Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000293/19990011999-04-20020 April 1999 Insp Rept 50-293/99-01 on 990125-0307.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Also Included Routine Core Insp of Security Program During Period of 990301-05 IR 05000293/19980101998-12-22022 December 1998 Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support,Including Implementation of Fire Protection Program IR 05000293/19980081998-12-0101 December 1998 Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19982031998-11-24024 November 1998 Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted. Major Areas Inspected:Capability of Selected Sys to Perform Safety Functions Required by Design Bases,Adherence of Sys to Design & Licensing Bases & Consistency of Configuration IR 05000293/19980071998-10-0707 October 1998 Insp Rept 50-293/98-07 on 980726-0906.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19980061998-08-28028 August 1998 Insp Rept 50-293/98-06 on 980609-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19980091998-08-20020 August 1998 Insp Rept 50-293/98-09 on 980713-24.No Violations Noted. Major Areas Inspected:Engineering Activities in Areas Including Evaluations to Address Operability Concerns,C/A Process & Actions Associated W/Findings from Previous Insps IR 05000293/19980051998-07-0909 July 1998 Insp Rept 50-293/98-05 on 980421-0608.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Concerns W/Fire Proctection Area Were Identified ML20217P7801998-04-0303 April 1998 Insp Rept 50-293/98-03 on 980302-05 & 11-12.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Security Force Capability IR 05000293/19980011998-03-24024 March 1998 Insp Rept 50-293/98-01 on 980107-0224.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19970131998-02-0606 February 1998 Insp Rept 50-293/97-13 on 971111-980106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19970121997-12-17017 December 1997 Insp Rept 50-293/97-12 on 971006-10 & 1119.Violations Noted. Major Areas Inspected:Eq Documents for EQ Equipment That Required Requalification Due to Containment Environ Changes Resulting from CS Flow Rate Reduction in 1988 IR 05000293/19970111997-12-11011 December 1997 Insp Rept 50-293/97-11 on 970914-1110.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970101997-11-26026 November 1997 Insp Rept 50-293/97-10 on 971104-07.No Violations Noted. Major Areas Inspected:Emergency Response Organization, Simulated Events,Mitigation Actions Emergency Declarations & off-site Agencies IR 05000293/19970081997-10-24024 October 1997 Insp Rept 50-293/97-08 on 970805-0913.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20198L9231997-10-21021 October 1997 Insp Rept 50-293/97-05 on 970514-0828.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Engineering IR 05000293/19970071997-09-15015 September 1997 Insp Rept 50-293/97-07 on 970625-0816.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970801997-09-12012 September 1997 Insp Rept 50-293/97-80 on 970721-0801.Violations Noted.Major Areas Inspected:Effectiveness of Processes for Identifying Resolving & Preventing Issues That Degrade Quality of Plant Operations & Safety ML20216G8181997-09-0404 September 1997 Insp Rept 50-293/97-09 on 970827-28.No Violations Noted. Major Areas Inspected:Licensee Access Authorization Program IR 05000293/19970041997-08-0707 August 1997 Insp Rept 50-293/97-04 on 970505-23.No Violations Noted. Major Areas Inspected:Effectiveness of Licensees Efforts in Maintaining Design Basis of safety-related Sys ML20149K0431997-07-22022 July 1997 Insp Rept 50-293/97-03 on 970429-0624.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20141K7861997-05-22022 May 1997 Insp Rept 50-293/97-02 on 970303-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137E5671997-03-18018 March 1997 Insp Rept 50-293/97-01 on 970112-0302.Violations Noted.Major Areas Inspected:Operations,Engineering & Plant Support ML20134K5951997-02-0707 February 1997 Insp Rept 50-293/96-10 on 961123-970111.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19960081996-12-18018 December 1996 Insp Rept 50-293/96-08 on 960924-1122.Violation Noted.Major Areas Inspected:Engineering,Maint,Plant Support,Radioactive Effluent Controls Program,Radiological Environmental Monitoring & Meteorological Monitoring.Meeting Slides Encl IR 05000293/19960061996-10-30030 October 1996 Insp Rept 50-293/96-06 on 960729-0923.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129A0441996-10-11011 October 1996 Insp Rept 50-293/96-09 on 960916-20.Violations Noted. Major Areas Inspected:Miscellaneous Security & Safeguard Issues,Access Authorization Program & Administration Organization & Background Investigation Elements ML20129D8361996-09-20020 September 1996 Insp Rept 50-293/96-07 on 960708-12,0722-26 & 0828-0903. Non Cited Violation Noted.Major Areas Inspected:C/As After Licensee Had Identified Potentially Inoperable Primary Containment as Documented in LER 96-04 IR 05000293/19930201994-01-10010 January 1994 Insp Rept 50-293/93-20 on Stated Date.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Surveillance, Engineering & Plant Support IR 05000293/19930801993-12-21021 December 1993 Insp Rept 50-293/93-80 on 931018-23.No Violations Noted. Major Areas Inspected:Station Blackout Coping Sys,Onsite Ac Supplies & Reliability Program,Plant Mods & QA & Maint Practices for Station Blackout Equipment IR 05000293/19930191993-11-23023 November 1993 Insp Rept 50-293/93-19 on 930928-1101.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering,Plant Support,W/Regard to Security & NRC Info Notice 93-079 ML20058D4771993-11-19019 November 1993 Insp Rept 50-293/93-16 on 930830-1015.Violations Noted.Major Areas Inspected:Audits & Surveillances,Training & Qualifications,Radiological Problem Repts & Associated C/A IR 05000293/19930151993-10-15015 October 1993 Insp Rept 50-293/93-15 on 930817-0927.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls Maint & Surveillance,Emergency Preparedness,Security,Safety Assessment & Quality Verification IR 05000293/19930171993-09-24024 September 1993 Insp Rept 50-293/93-17 on 930830-0903.No Violations Noted. Major Areas Inspected:Mgt Controls,Qa Audits & ODCM IR 05000293/19930141993-09-0808 September 1993 Insp Rept 50-293/93-14 on 930713-0816.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support IR 05000293/19930111993-08-0404 August 1993 Insp Rept 50-293/93-11 on 930606-11.No Violations Noted. Major Areas Inspected:Licensee Corrective Actions of Previously Identified Electrical Distribution Sys Functional Insp Findings & Observations IR 05000293/19930011993-02-0303 February 1993 Insp Rept 50-293/93-01 on 930111-14.Weaknesses Noted.Major Areas Inspected:Eop Review,Rev,Approval Process,Qa Involvement in EOP Program & Operator Training in EOPs IR 05000293/19920811993-02-0202 February 1993 Probabilistic Risk Assessment Based Insp Rept 50-293/92-81 on 921130-1218.Violation Noted.Major Areas Inspected:Review of Emergency Diesel Generators & Hpcis.App a Encl IR 05000293/19920281993-01-28028 January 1993 Insp Rept 50-293/92-28 on 921124-1231.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security,Safety Assessment & Quality Verification IR 05000293/19920261993-01-21021 January 1993 Insp Rept 50-293/92-26 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Ep Program Changes, Emergency Response Facilities,Equipment,Instrumentation, Supplies & Organization & Mgt Control IR 05000293/19920231992-12-29029 December 1992 Safety Insp Rept 50-293/92-23 on 921020-1123.No Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security & Safety Assessment & Quality Verification IR 05000293/19920241992-11-23023 November 1992 Insp Rept 50-293/92-24 on Stated Date.No Safety Concerns or Violations Noted.Major Areas Inspected:Audits & Surveillances,Collective Personnel Exposure Status,Outage Radiological Controls & Implementation of Exposure Programs IR 05000293/19900201990-11-0707 November 1990 Safety Insp Rept 50-293/90-20 on 900816-1008.Violation Noted.Major Areas Inspected:Plant Operations,Security, Maint & Surveillance,Engineering & Technical Support, Radiological Controls,Emergency Preparedness & Safety IR 05000293/19900211990-10-11011 October 1990 Insp Rept 50-293/90-21 on 900905-07.Major Areas Inspected: 900902-03 Event Involving Number of Component Malfunctions & Operational Complications Following Shutdown.Operating Procedures Lacked Adequate Guidance for Operators IR 05000293/19900091990-08-20020 August 1990 Insp Rept 50-293/90-09 on 900806-10.No Violations or Deviations Noted.Major Areas Inspected:Control of Design, Design Changes,Mods,Engineering & Technical Support Organization,Staffing,Communications,Qa & Training IR 05000293/19900161990-07-30030 July 1990 Partially Withheld Physical Security Insp Rept 50-293/90-16 on 900625-29 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support & Program Plans,Protected & Vital Area Physical Barriers & Detection & Assessment Aids 1999-08-27
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000293/19990051999-10-0808 October 1999 Insp Rept 50-293/99-05 on 990726-0905.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19990041999-08-27027 August 1999 Insp Rept 50-293/99-04 on 990610-0725.Non-cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20209G2331999-07-0909 July 1999 Insp Rept 50-293/99-03 on 990419-0609.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support.Response to Main Transformer Fire by Fire Brigade Members Was Good IR 05000293/19990021999-05-17017 May 1999 Insp Rept 50-293/99-02 on 990308-0418.Two Level 4 Violations Occurred & Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000293/19990011999-04-20020 April 1999 Insp Rept 50-293/99-01 on 990125-0307.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Also Included Routine Core Insp of Security Program During Period of 990301-05 IR 05000293/19980101998-12-22022 December 1998 Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support,Including Implementation of Fire Protection Program IR 05000293/19980081998-12-0101 December 1998 Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19982031998-11-24024 November 1998 Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted. Major Areas Inspected:Capability of Selected Sys to Perform Safety Functions Required by Design Bases,Adherence of Sys to Design & Licensing Bases & Consistency of Configuration IR 05000293/19980071998-10-0707 October 1998 Insp Rept 50-293/98-07 on 980726-0906.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19980061998-08-28028 August 1998 Insp Rept 50-293/98-06 on 980609-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19980091998-08-20020 August 1998 Insp Rept 50-293/98-09 on 980713-24.No Violations Noted. Major Areas Inspected:Engineering Activities in Areas Including Evaluations to Address Operability Concerns,C/A Process & Actions Associated W/Findings from Previous Insps IR 05000293/19980051998-07-0909 July 1998 Insp Rept 50-293/98-05 on 980421-0608.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Concerns W/Fire Proctection Area Were Identified ML20217P7801998-04-0303 April 1998 Insp Rept 50-293/98-03 on 980302-05 & 11-12.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Security Force Capability IR 05000293/19980011998-03-24024 March 1998 Insp Rept 50-293/98-01 on 980107-0224.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19970131998-02-0606 February 1998 Insp Rept 50-293/97-13 on 971111-980106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19970121997-12-17017 December 1997 Insp Rept 50-293/97-12 on 971006-10 & 1119.Violations Noted. Major Areas Inspected:Eq Documents for EQ Equipment That Required Requalification Due to Containment Environ Changes Resulting from CS Flow Rate Reduction in 1988 IR 05000293/19970111997-12-11011 December 1997 Insp Rept 50-293/97-11 on 970914-1110.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970101997-11-26026 November 1997 Insp Rept 50-293/97-10 on 971104-07.No Violations Noted. Major Areas Inspected:Emergency Response Organization, Simulated Events,Mitigation Actions Emergency Declarations & off-site Agencies IR 05000293/19970081997-10-24024 October 1997 Insp Rept 50-293/97-08 on 970805-0913.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20198L9231997-10-21021 October 1997 Insp Rept 50-293/97-05 on 970514-0828.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Engineering IR 05000293/19970071997-09-15015 September 1997 Insp Rept 50-293/97-07 on 970625-0816.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970801997-09-12012 September 1997 Insp Rept 50-293/97-80 on 970721-0801.Violations Noted.Major Areas Inspected:Effectiveness of Processes for Identifying Resolving & Preventing Issues That Degrade Quality of Plant Operations & Safety ML20216G8181997-09-0404 September 1997 Insp Rept 50-293/97-09 on 970827-28.No Violations Noted. Major Areas Inspected:Licensee Access Authorization Program IR 05000293/19970041997-08-0707 August 1997 Insp Rept 50-293/97-04 on 970505-23.No Violations Noted. Major Areas Inspected:Effectiveness of Licensees Efforts in Maintaining Design Basis of safety-related Sys ML20149K0431997-07-22022 July 1997 Insp Rept 50-293/97-03 on 970429-0624.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20141K7861997-05-22022 May 1997 Insp Rept 50-293/97-02 on 970303-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20137E5671997-03-18018 March 1997 Insp Rept 50-293/97-01 on 970112-0302.Violations Noted.Major Areas Inspected:Operations,Engineering & Plant Support ML20134K5951997-02-0707 February 1997 Insp Rept 50-293/96-10 on 961123-970111.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19960081996-12-18018 December 1996 Insp Rept 50-293/96-08 on 960924-1122.Violation Noted.Major Areas Inspected:Engineering,Maint,Plant Support,Radioactive Effluent Controls Program,Radiological Environmental Monitoring & Meteorological Monitoring.Meeting Slides Encl IR 05000293/19960061996-10-30030 October 1996 Insp Rept 50-293/96-06 on 960729-0923.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20129A0441996-10-11011 October 1996 Insp Rept 50-293/96-09 on 960916-20.Violations Noted. Major Areas Inspected:Miscellaneous Security & Safeguard Issues,Access Authorization Program & Administration Organization & Background Investigation Elements ML20129D8361996-09-20020 September 1996 Insp Rept 50-293/96-07 on 960708-12,0722-26 & 0828-0903. Non Cited Violation Noted.Major Areas Inspected:C/As After Licensee Had Identified Potentially Inoperable Primary Containment as Documented in LER 96-04 IR 05000293/19930201994-01-10010 January 1994 Insp Rept 50-293/93-20 on Stated Date.No Violations Noted. Major Areas Inspected:Operations,Maintenance & Surveillance, Engineering & Plant Support IR 05000293/19930801993-12-21021 December 1993 Insp Rept 50-293/93-80 on 931018-23.No Violations Noted. Major Areas Inspected:Station Blackout Coping Sys,Onsite Ac Supplies & Reliability Program,Plant Mods & QA & Maint Practices for Station Blackout Equipment IR 05000293/19930191993-11-23023 November 1993 Insp Rept 50-293/93-19 on 930928-1101.No Violations Noted. Major Areas Inspected:Plant Operations,Maint & Surveillance, Engineering,Plant Support,W/Regard to Security & NRC Info Notice 93-079 ML20058D4771993-11-19019 November 1993 Insp Rept 50-293/93-16 on 930830-1015.Violations Noted.Major Areas Inspected:Audits & Surveillances,Training & Qualifications,Radiological Problem Repts & Associated C/A IR 05000293/19930151993-10-15015 October 1993 Insp Rept 50-293/93-15 on 930817-0927.No Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls Maint & Surveillance,Emergency Preparedness,Security,Safety Assessment & Quality Verification IR 05000293/19930171993-09-24024 September 1993 Insp Rept 50-293/93-17 on 930830-0903.No Violations Noted. Major Areas Inspected:Mgt Controls,Qa Audits & ODCM IR 05000293/19930141993-09-0808 September 1993 Insp Rept 50-293/93-14 on 930713-0816.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance & Surveillance,Engineering & Plant Support IR 05000293/19930111993-08-0404 August 1993 Insp Rept 50-293/93-11 on 930606-11.No Violations Noted. Major Areas Inspected:Licensee Corrective Actions of Previously Identified Electrical Distribution Sys Functional Insp Findings & Observations IR 05000293/19930011993-02-0303 February 1993 Insp Rept 50-293/93-01 on 930111-14.Weaknesses Noted.Major Areas Inspected:Eop Review,Rev,Approval Process,Qa Involvement in EOP Program & Operator Training in EOPs IR 05000293/19920811993-02-0202 February 1993 Probabilistic Risk Assessment Based Insp Rept 50-293/92-81 on 921130-1218.Violation Noted.Major Areas Inspected:Review of Emergency Diesel Generators & Hpcis.App a Encl IR 05000293/19920281993-01-28028 January 1993 Insp Rept 50-293/92-28 on 921124-1231.Violations Noted. Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security,Safety Assessment & Quality Verification IR 05000293/19920261993-01-21021 January 1993 Insp Rept 50-293/92-26 on 921207-11.No Violations or Deviations Noted.Major Areas Inspected:Ep Program Changes, Emergency Response Facilities,Equipment,Instrumentation, Supplies & Organization & Mgt Control IR 05000293/19920231992-12-29029 December 1992 Safety Insp Rept 50-293/92-23 on 921020-1123.No Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls,Maint & Surveillance,Emergency Preparedness, Security & Safety Assessment & Quality Verification IR 05000293/19920241992-11-23023 November 1992 Insp Rept 50-293/92-24 on Stated Date.No Safety Concerns or Violations Noted.Major Areas Inspected:Audits & Surveillances,Collective Personnel Exposure Status,Outage Radiological Controls & Implementation of Exposure Programs IR 05000293/19900201990-11-0707 November 1990 Safety Insp Rept 50-293/90-20 on 900816-1008.Violation Noted.Major Areas Inspected:Plant Operations,Security, Maint & Surveillance,Engineering & Technical Support, Radiological Controls,Emergency Preparedness & Safety IR 05000293/19900211990-10-11011 October 1990 Insp Rept 50-293/90-21 on 900905-07.Major Areas Inspected: 900902-03 Event Involving Number of Component Malfunctions & Operational Complications Following Shutdown.Operating Procedures Lacked Adequate Guidance for Operators IR 05000293/19900091990-08-20020 August 1990 Insp Rept 50-293/90-09 on 900806-10.No Violations or Deviations Noted.Major Areas Inspected:Control of Design, Design Changes,Mods,Engineering & Technical Support Organization,Staffing,Communications,Qa & Training IR 05000293/19900161990-07-30030 July 1990 Partially Withheld Physical Security Insp Rept 50-293/90-16 on 900625-29 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support & Program Plans,Protected & Vital Area Physical Barriers & Detection & Assessment Aids 1999-08-27
[Table view] Category:UTILITY
MONTHYEARIR 05000293/19900201990-11-0707 November 1990 Safety Insp Rept 50-293/90-20 on 900816-1008.Violation Noted.Major Areas Inspected:Plant Operations,Security, Maint & Surveillance,Engineering & Technical Support, Radiological Controls,Emergency Preparedness & Safety IR 05000293/19900211990-10-11011 October 1990 Insp Rept 50-293/90-21 on 900905-07.Major Areas Inspected: 900902-03 Event Involving Number of Component Malfunctions & Operational Complications Following Shutdown.Operating Procedures Lacked Adequate Guidance for Operators IR 05000293/19900091990-08-20020 August 1990 Insp Rept 50-293/90-09 on 900806-10.No Violations or Deviations Noted.Major Areas Inspected:Control of Design, Design Changes,Mods,Engineering & Technical Support Organization,Staffing,Communications,Qa & Training IR 05000293/19900161990-07-30030 July 1990 Partially Withheld Physical Security Insp Rept 50-293/90-16 on 900625-29 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Mgt Support & Program Plans,Protected & Vital Area Physical Barriers & Detection & Assessment Aids IR 05000293/19900181990-07-26026 July 1990 Insp Rept 50-293/90-18 on 900709-13.No Violations Noted. Major Areas Inspected:Inservice Insp Activities to Ascertain Whether Licensee Activities Conducted in Compliance W/Asme Code & Regulatory Requirements IR 05000293/19900171990-07-25025 July 1990 Insp Rept 50-293/90-17 on 900624-29.No Violations Noted. Major Areas Inspected:Radiological & Nonradiological Chemistry Programs IR 05000293/19900131990-06-29029 June 1990 Safety Insp Rept 50-293/90-13 on 900501-0611.No Violations Noted.Major Areas Inspected:Actions on Previous Insp Findings,Plant Operations,Security,Maint & Surveillance, Engineering Support & Radiological Controls IR 05000293/19900141990-06-26026 June 1990 Insp Rept 50-293/90-14 on 900620-22.No Violations Noted. Major Areas Inspected:Observation of Licensee Partial Participation Annual Emergency Preparedness Exercise IR 05000293/19890061989-07-20020 July 1989 Insp Rept 50-293/89-06 on 890411-0524.No Violations Noted. Major Areas Inspected:Assessment of Licensee Mgt Controls, Conduct of Operation & Licensee Approach to Investigation & Resolution of Events During 5 - 25% Power Plateau IR 05000293/19890091989-07-0606 July 1989 Insp Rept 50-293/89-09 on 890619-22.No Violations Noted. Major Areas Inspected:Changes to Emergency Preparedness Program,Emergency Facilities,Equipment,Instrumentation & Supplies,Organization & Mgt Control IR 05000293/19890051989-06-0909 June 1989 Insp Rept 50-293/89-05 on 890311-0410.Unresolved Item Noted Re Util Method for Disabling Annunciators in Control Room. Major Areas Inspected:Assessment of Licensee Mgt Controls, Conduct of Operations & Startup Testing ML20247D5561989-05-0808 May 1989 Augmented Insp Team Rept 50-293/89-80 on 890413-15 & 17-26. No Violations Noted.Major Areas Inspected:Causes,Safety Implications & Util Response to 890412 RCIC Sys Suction Piping Overpressurization IR 05000293/19890041989-04-28028 April 1989 Mgt Meeting Rept 50-293/89-04 on 890328-30.Major Areas Discussed:Emergency Plan & Implementing Procedures, Emergency Operations Ctr Staffing & Equipment,Reception Ctrs & Public Info Brochure IR 05000293/19890011989-04-24024 April 1989 Insp Rept 50-293/89-01 on 890206-0310.Violations Noted.Major Areas Inspected:Licensee Mgt Controls,Conduct of Operations & Startup Testing Activities During Licensee Power Ascension Program IR 05000293/19890431989-04-0606 April 1989 Mgt Meeting Rept 50-293/89-43 on 890309 Re Licensee Followup to 890304 Reactor Scram & Util Overview of Turbine Control Sys IR 05000293/19880371989-03-30030 March 1989 Insp Rept 50-293/88-37 on 881227-890205.Violation Noted Re Failure to Control Locked High Radiation Area Access.Major Areas Inspected:Licensee Mgt Controls,Conduct of Operations & Startup Testing During Power Ascension Program IR 05000293/19890031989-02-21021 February 1989 Meeting Rept 50-293/89-03 on 890131-0202.Major Areas Discussed:Emergency Operating Conditions,Training,Staffing, Emergency Plan & Implementing Procedures & Equipment IR 05000293/19880341989-02-14014 February 1989 Safety Insp Rept 50-293/88-34 on 881114-1226.No Violations Noted.Major Areas Inspected:Plant Operations,Radiation Protection,Physical Security,Plant Events,Maint, Surveillance,Part 21 Repts & Outage Activities IR 05000293/19870991989-01-0606 January 1989 Mgt Meeting Rept on 881003 to Review Licensee Actions to Address Radiation Protection Program Weaknesses Described in SALP Rept 50-293/87-99 ML20206L4581988-11-21021 November 1988 Insp Rept 50-293/88-30 on 881027-1118.No Violations Noted. Major Areas Inspected:Licensee Followup Activities Re Loose Anchor Bolts in Pipe Support Base Plate,Safety Significance of Subj Discrepancy & Response to Bulletins 79-002 & 79-014 IR 05000293/19880311988-10-24024 October 1988 Insp Rept 50-293/88-31 on 880829-0926.Violations Noted.Major Areas Inspected:Radiation Protection,Physical Security, Plant Events,Maint,Surveillance & Outage Activities IR 05000293/19880321988-10-13013 October 1988 Insp Rept 50-293/88-32 on 880912-16.Violations Noted.Major Areas Inspected:Corrective Actions That Resulted from IE Bulletin 85-003 That Addressed Improper Limit Switch & Torque Switch Settings in motor-operated Valves IR 05000293/19880271988-09-20020 September 1988 Insp Rept 50-293/88-27 on 880718-0828.No Violations Noted. Major Areas Inspected:Licensee Actions on Previous Insp Findings,Plant Operations,Radiation Protection & Physical Security.One Unresolved Item Identified Re Valve Yoke Clamp ML20154C2791988-09-0707 September 1988 Integrated Assessment Team Insp Rept 50-293/88-21 on 880808- -24.No Violations Noted.Major Areas Inspected:Degree of Readiness of Licensee Mgt Controls,Programs & Personnel to Support Safe Restart & Plant Operation IR 05000283/19880291988-09-0707 September 1988 Insp Rept 50-283/88-29 on 880818-20.No Violations or Deviations Noted.Major Areas Inspected:Use of NRC Mobile Radioanalytical Lab to Perform Independent Measurements of Soil to Determine Existence & Level of Contamination ML20154L5851988-09-0606 September 1988 Meeting Rept 50-293/M88-312 on 880831.Discusses NRC Concerns Re Rosemount 1153 Transmitter Ringing Problem & Util Approach to Resolving Issue ML20153D3051988-08-23023 August 1988 Insp Rept 50-293/88-23 on 880620-30.No Violations Noted. Major Areas Inspected:Licensee Corrective Actions in Response to NRC Info Notices 86-003 & 053 Re Limitorque Valves & Raychem Heat Shrink Tubing,Respectively IR 05000293/19880251988-08-15015 August 1988 Insp Rept 50-293/88-25 on 880601-0717.No Violations Noted. Major Areas Inspected:Plant Operations,Radiation Protection, Physical Security,Plant Events,Maint,Surveillance,Outage Activities & Repts to NRC IR 05000293/19880281988-07-26026 July 1988 Insp Rept 50-293/88-28 on 880718-21.No Violations Noted. Major Areas Inspected:Changes to Emergency Preparedness Program,Shift Staffing & Augmentation,Knowledge & Performance of Duties & Emergency Detection IR 05000293/19880241988-07-22022 July 1988 Insp Rept 50-293/88-24 on 880531-0609.No Violations Noted. Major Areas Inspected:Licensee Followup & Corrective Actions Re Several Previously Identified Open Items IR 05000293/19880201988-07-18018 July 1988 Insp Rept 50-293/88-20 on 880502-0610.No Violations Noted. Major Areas Inspected:Qa Aspects of Mod Covering Matls, Welding & NDE IR 05000293/19880181988-07-11011 July 1988 Physical Security Insp Rept 50-293/88-18 on 880425-29 & 0503-04.No Violations Noted.Major Areas Inspected:Mgt Effectiveness of Licensee Proprietary Security Organization ML20150E8141988-06-30030 June 1988 Mgt Meeting Rept 50-293/88-26 on 880627.Major Issues Discussed:Licensee Response to NRC Maint Team Insp 50-293/88-17,status of Licensee Evaluation of RHR Valve Yoke Cracking & Followup of Assessment of Readiness for Restart IR 05000293/19880191988-06-28028 June 1988 Insp Rept 50-293/88-19 on 880418-0531.Concerns Noted.Major Areas Inspected:Plant Operations,Radiation Protection, Physical Security,Plant Events,Maint,Surveillance,Outage Activities & Repts to NRC IR 05000293/19880121988-05-31031 May 1988 Insp Rept 50-293/88-12 on 880306-0417.Violations Noted. Major Areas Inspected:Radiation Protection,Physical Security,Plant Events,Maint,Surveillance,Outage Activites & Repts to NRC IR 05000293/19880171988-05-25025 May 1988 Insp Rept 50-293/88-17 on 880425-0505.No Violations Noted. Major Areas Inspected:Exam of Identified Maint Problems, Correction of Problems & Maint Section Interfaces W/ Engineering,Operations,Qa & Health Physics Personnel ML20154F9341988-05-17017 May 1988 Insp Rept 50-293/88-11 on 880314-18.No Violations or Deviations Noted.Major Areas Inspected:Emergency Operating Procedures,Including Comparison of Plant Specific Guidelines & BWR Owners Group Guidelines with Emergency Procedures IR 05000293/19880141988-05-16016 May 1988 Insp Rept 50-293/88-14 on 880418-22.No Violations Noted. Major Areas Inspected:Previous Insp Findings & Power Ascension Test Program IR 05000293/19880161988-05-13013 May 1988 Partially Withheld Physical Security Insp Rept 50-293/88-16 on 880411-14 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Program Upgrades,Program Audits,Physical barriers-protected & Vital Areas & Lighting IR 05000293/19880131988-05-10010 May 1988 Insp Rept 50-293/88-13 on 880411-15.No Violations Noted. Major Areas Inspected:Review of Licensee Followup & Corrective Actions Re Previously Identified Open Items in Area of Matls Component Integrity & Plant Mods IR 05000293/19880431988-05-0909 May 1988 Mgt Meeting Rept 50-293/88-43 on 880408.Major Topic Discussed:Licensee Power Ascension Program.Viewgraphs Encl IR 05000293/19880071988-05-0606 May 1988 Insp Rept 50-293/88-07 on 880120-0305.Violations Noted.Major Areas Inspected:Insp of Plant Operations,Radiation Protection,Physical Security,Plant Events,Maint, Surveillance,Outage Activities & Repts to NRC IR 05000293/19880151988-04-27027 April 1988 Insp Rept 50-293/88-15 on 880404-08.No Violations Noted. Major Areas Inspected:Liquid Radwaste Sys,Solid Radwaste Sys & Gaseous Radwaste Sys IR 05000293/19880081988-04-19019 April 1988 Insp Rept 50-293/88-08 on 880201-05.Violations Noted.Major Areas Inspected:Electrical Power Sys,Including Verification of as-built Drawings,Adequacy of Breaker & Fuse Coordination & Emergency Loading of Diesel Generator IR 05000293/19880021988-04-14014 April 1988 Insp Rept 50-293/88-02 on 880125-0204.No Violations Noted. Major Areas Inspected:Matl Condition Improvement Action Program ML20151C5891988-03-31031 March 1988 Mgt Meeting Rept 50-293/87-30 on 870930.Major Areas Discussed:Followup of 870909 Enforcement Conference,Licensee Responses to Apparent Violations Identified in Insp Rept 50-293/87-30 & Programmatic Security Improvements IR 05000293/19880101988-03-14014 March 1988 Mgt Meeting Insp Rept 50-293/88-10 on 880224.Major Areas Discussed:Util Self Assessment Process Designed to Determine Readiness for Requesting Restart ML20153A8581988-03-11011 March 1988 Insp Rept 50-293/87-57 on 871207-880119.Violation Noted. Major Areas Inspected:Plant Operations,Radiation Protection, Physical Security,Plant Events,Maint & Surveillance.One Unresolved Item Identified IR 05000293/19880091988-03-10010 March 1988 Insp Rept 50-293/88-09 on 880124-25.No Violations Noted. Major Areas Inspected:Conditions Surrounding Classification & Reporting of Notification of Unusual Event Identified on 880211 IR 05000293/19880011988-03-0303 March 1988 Insp Rept 50-293/88-01 on 880125-29.No Violations Noted. Major Areas Inspected:Status of Previously Identified Items, Organization & Staffing,Control of Locked High Radiation Areas & Control of Hot Particles 1990-08-20
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000293/19990051999-10-0808 October 1999 Insp Rept 50-293/99-05 on 990726-0905.Violations Noted.Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19990041999-08-27027 August 1999 Insp Rept 50-293/99-04 on 990610-0725.Non-cited Violations Noted.Major Areas Inspected:Aspects of Licensee Operations, Engineering,Maint & Plant Support ML20209G2331999-07-0909 July 1999 Insp Rept 50-293/99-03 on 990419-0609.Violations Noted & Being Treated as non-cited Violations.Major Areas Inspected: Operations,Maint,Engineering & Plant Support.Response to Main Transformer Fire by Fire Brigade Members Was Good PNO-I-99-026A, on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation1999-06-0101 June 1999 PNO-I-99-026A:on 990518,main Transformer Was Damaged During Testing of Replacement Bushing While Unit Was in Refueling Outage.Current Refueling Outage Was Originally Scheduled to Be Completed on 990607,with Return to Full Power Operation PNO-I-99-026, on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release1999-05-19019 May 1999 PNO-I-99-026:on 990518,fire Occurred at Pilgrim Station in Main Electrical Transformer.Licensee Requested off-site Firefighting Assistance.Resident Inspector Responded to Site Upon Notification of Event.Licensee Issued Press Release IR 05000293/19990021999-05-17017 May 1999 Insp Rept 50-293/99-02 on 990308-0418.Two Level 4 Violations Occurred & Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000293/19990011999-04-20020 April 1999 Insp Rept 50-293/99-01 on 990125-0307.Violations Noted. Major Areas Inspected:Operations,Engineering,Maintenance & Plant Support.Also Included Routine Core Insp of Security Program During Period of 990301-05 IR 05000293/19980101998-12-22022 December 1998 Insp Rept 50-293/98-10 on 981020-1208.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support,Including Implementation of Fire Protection Program IR 05000293/19980081998-12-0101 December 1998 Insp Rept 50-293/98-08 on 980907-1019.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19982031998-11-24024 November 1998 Insp Rept 50-293/98-203 on 980928-1023.No Violations Noted. Major Areas Inspected:Capability of Selected Sys to Perform Safety Functions Required by Design Bases,Adherence of Sys to Design & Licensing Bases & Consistency of Configuration IR 05000293/19983011998-11-24024 November 1998 NRC Operator Licensing Exam Rept 50-293/98-301OL (Including Completed & Graded Tests) for Tests Administered on 981016- 23.Exam Results:All Applicants Passed All Portions of Exam ML20154J8991998-10-0707 October 1998 Notice of Violation from Insp on 980726-0906.Violation Noted:Licensee Did Not Establish Measures to Assure Regulatory Requirements & Design Basis of Control Room High Efficiency Air Filtration Sys IR 05000293/19980071998-10-0707 October 1998 Insp Rept 50-293/98-07 on 980726-0906.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20239A1231998-08-28028 August 1998 Notice of Violation from Insp on 980609-0725.Violation Noted:From 1980 to 980609,licensee Failed to Maintain Provisions to Ensure That One Train of Cables Were Free from Fire Damage IR 05000293/19980061998-08-28028 August 1998 Insp Rept 50-293/98-06 on 980609-0725.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support IR 05000293/19980091998-08-20020 August 1998 Insp Rept 50-293/98-09 on 980713-24.No Violations Noted. Major Areas Inspected:Engineering Activities in Areas Including Evaluations to Address Operability Concerns,C/A Process & Actions Associated W/Findings from Previous Insps ML20237A3031998-08-0606 August 1998 Notice of Violation from Insp on 980427-0515.Violation Noted:From 960710-970427,licensee Elected Not to Monitor Performance or Condition of Control Rod Drive Sys Against Established Goals IR 05000293/19980051998-07-0909 July 1998 Insp Rept 50-293/98-05 on 980421-0608.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support.Concerns W/Fire Proctection Area Were Identified ML20247N8441998-05-19019 May 1998 Partially Deleted Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $55,000 (Ref 10CFR2.790(b) for Violations Noted During Insp on 980302-05 & 11-12 ML20247P0221998-05-19019 May 1998 Notice of Violation from Insp on 980225-0418.Violations Noted:Work Plan to Replace External Cooling Water Flexible Hoses to a Core Spray Pump Motor Not Commensurate with Complexity of Task.As Result,Physical Damage Occurred ML20248J3981998-05-14014 May 1998 EN-98-038:on 980519,notice of Proposed Imposition of Civil Penalty in Amount of $55,000 Issued to Licensee.Action Based on One Violation Involving Apparent Failures Associated W/Assessment Aids at Facility ML20217N5971998-04-27027 April 1998 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $165,000.Violations Noted:Between Jan 1995 & 970120 Licensee Failed to Take Prompt & Effective Corrective Action for Significant Condition Adverse to Quality ML20247M3891998-04-22022 April 1998 EN-98-032:on 980427,notice of Proposed Imposition of Civil Penalty in Amount of $165,000 Issued to Licensee.Action Based on Two Severity Level III Violations & One Severity Level III Problem Re Failure to Identify & Take C/As ML20217P7801998-04-0303 April 1998 Insp Rept 50-293/98-03 on 980302-05 & 11-12.Apparent Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Licensee Security Force Capability ML20217F0101998-03-24024 March 1998 Notice of Violation from Insp on 980107-0224.Violation Noted:Nrc Identified That Condition Outside Design Basis of Plant Involving EDG Fuel Oil Storage Sys Was Not Reported to NRC within 1 Hour IR 05000293/19980011998-03-24024 March 1998 Insp Rept 50-293/98-01 on 980107-0224.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support ML20202D2441998-02-0606 February 1998 Notice of Violation from Insp on 971111-980106.Violations Noted:Util Did Not Properly Evaluate Cause & Implement Corrective Actions to Preclude Repetition of Temporary Temp Detectors Deficiencies from Reactor Vessel Flange IR 05000293/19970131998-02-0606 February 1998 Insp Rept 50-293/97-13 on 971111-980106.Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support IR 05000293/19970121997-12-17017 December 1997 Insp Rept 50-293/97-12 on 971006-10 & 1119.Violations Noted. Major Areas Inspected:Eq Documents for EQ Equipment That Required Requalification Due to Containment Environ Changes Resulting from CS Flow Rate Reduction in 1988 ML20197K1101997-12-17017 December 1997 Notice of Violation from Insp on 971006-10 & 1119.Violation Noted:Nine Penetrations Were Not Qualified in That Qualification Methodology Used by Boston Edison Had Not Been Validated by Test Results to Be Equivalent to Type Testing ML20197H2411997-12-11011 December 1997 Notice of Violation from Insp on 970914-1110.Violation Noted:On 971001,licensee Identified That,Tagout T97-61-162 Was Incorrectly Prepared & Applied;Breaker 1021 Was Placed in Closed Vice Open Position as Required by Tagout IR 05000293/19970111997-12-11011 December 1997 Insp Rept 50-293/97-11 on 970914-1110.Violations Noted:Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970991997-11-26026 November 1997 Correction to SALP Rept 50-293/97-99.Page 2 of Subj Rept Corrected IR 05000293/19970101997-11-26026 November 1997 Insp Rept 50-293/97-10 on 971104-07.No Violations Noted. Major Areas Inspected:Emergency Response Organization, Simulated Events,Mitigation Actions Emergency Declarations & off-site Agencies PNO-I-97-072, on 971123,operators Initiated Plant Shutdown When Main Steam Isolation Valves AO-203-1C & AO-203-2B Were Declared Inoperable During Surveillance Test1997-11-24024 November 1997 PNO-I-97-072:on 971123,operators Initiated Plant Shutdown When Main Steam Isolation Valves AO-203-1C & AO-203-2B Were Declared Inoperable During Surveillance Test ML20198P8241997-11-0404 November 1997 SALP Rept 50-293/97-99 for Period 960407-970913 IR 05000293/19970081997-10-24024 October 1997 Insp Rept 50-293/97-08 on 970805-0913.No Violations Noted. Major Areas Inspected:Operations,Engineering,Maint & Plant Support ML20198L9231997-10-21021 October 1997 Insp Rept 50-293/97-05 on 970514-0828.Violations Being Considered for Escalated Enforcement Action.Major Areas Inspected:Engineering PNO-I-97-061, on 970922,util Informed Region I of Receipt of Internal Nuclear Safety Concern Potentially Involving Instance of Falsification of Control Room Log in 1989.Formal Investigation Initiated & Press Release Issued1997-09-23023 September 1997 PNO-I-97-061:on 970922,util Informed Region I of Receipt of Internal Nuclear Safety Concern Potentially Involving Instance of Falsification of Control Room Log in 1989.Formal Investigation Initiated & Press Release Issued ML20211A2741997-09-17017 September 1997 Notice of Violation from Insp on 970721-0801.Violation Noted:For Problem Rept PR97.9220,trip of B Residual Heat Removal Pump,Individual Performing Root Cause Analysis Was Not Formally Trained in HPI Methodology IR 05000293/19970071997-09-15015 September 1997 Insp Rept 50-293/97-07 on 970625-0816.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000293/19970801997-09-12012 September 1997 Insp Rept 50-293/97-80 on 970721-0801.Violations Noted.Major Areas Inspected:Effectiveness of Processes for Identifying Resolving & Preventing Issues That Degrade Quality of Plant Operations & Safety ML20216G8181997-09-0404 September 1997 Insp Rept 50-293/97-09 on 970827-28.No Violations Noted. Major Areas Inspected:Licensee Access Authorization Program PNO-I-97-053, on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR1997-08-22022 August 1997 PNO-I-97-053:on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR IR 05000293/19970041997-08-0707 August 1997 Insp Rept 50-293/97-04 on 970505-23.No Violations Noted. Major Areas Inspected:Effectiveness of Licensees Efforts in Maintaining Design Basis of safety-related Sys ML20149K0431997-07-22022 July 1997 Insp Rept 50-293/97-03 on 970429-0624.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20149K0401997-07-22022 July 1997 Notice of Violation from Insp on 970429-0624.Violation Noted:On 970602,station Services Dept Worker Tied Open Boiler Room Door Which Forms Part of Radiologically Controlled Area & Action Not Directed by RP Personnel ML20149K1311997-07-18018 July 1997 NRC Operator Licensing Exam Rept 50-293/97-06 (Including Completed & Graded Tests) for Tests Administered on 970505-09 ML20149K1291997-07-18018 July 1997 Notice of Violation from Exam on 970505-09.Violation Noted: Two SRO Applications Dtd 970418,documented Five Manipulations Based on Credit Taken for Multiple Manipulations Due to Power Change & One Should Be Credited ML20141K7861997-05-22022 May 1997 Insp Rept 50-293/97-02 on 970303-0428.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-08-27
[Table view] |
Inspection Report - Pilgrim - 1985029 |
---|
|
|
Text
.
.
U.S. NUCLEAR REGULATORY COMMISSION
REGION I
-Report No. 50-293/85-29 Docket N License N OPR-35 Licensee: Boston Edison Company
., 800 Boylston Street Boston, Massachusetts 02199 Facility Name: Pilgrim Nuclear Power Station Inspection At: Plymouth, Massachusetts Inspection Conducted: September 28, 1985'- October 2, 1985 Inspectors: X[
E. Briggs, rM Reactor Engineer
- 'dateAM[
_
" =p /o"/ 7- W KSmith/Safegpdsppecialist date l-0% &. kdA J.% ohnson, Chief, Operational Programs lo/lblts'
date Section, 08, DRS Approved by: _
w L. Bettenhausen, Chief, Operations Branch,
/d//7 M date DRS Inspection Summary: Inspection on September 28, 1985 - October 2, 1985 (Report No. 50-293/85-29)
Areas Inspected: Special reactive inspection of licensee activities related to the movement of spent fuel within the spent fuel-pool and the condition of refueling equipment. The inspection involved 114 hours0.00132 days <br />0.0317 hours <br />1.884921e-4 weeks <br />4.3377e-5 months <br /> on site by two region-based inspectors and one superviso Results: No violations were identifie i 8510250273 851018 PDR ADOCK 05000293 PDR G
_ . . _
.
.
.
DETAILS 1.0 Key Persons Contacted
- B. Eldredge, Chief Radiological Engineer
- F. Famulari, Quality Control Group Leader J. Kehoe, Corporate Security Officer
- P. Mastrangelo, Chief Operating Engineer
, **C. Mathis, Nuclear Operations Manager R. Mattos, Station Services Engineer T. Nicholson, Security Supervisor
, **A. Oxsen, Vice President - Nuclear Operation
, **E. Ziemianski, Nuclear Operations Support Manager The inspectot also interviewed other members of the licensee and contractor staff involved with operations, maintenance, security and fire protection.
l
- ** Denotes personnel present at exit meetings on October 1, 1985 and
,
October 2, 1985 respectivel .0 Background and Scope 2.1- Background At about 9:00 a.m. on September 27, 1985, licensee personnel were
securing equipment on the refueling floor (117 foot elevation reactor building) in preparation for the impending passage of hurricane Gloria and noticed that the main mast en the refueling bridge (over the spent fuel pool) was fully extended and bent. The mast grapple was attached to a spent fuel assembly handle.
i Authorized fuel handling activities were last conducted on the afternoon of September 26, 1985 and the equipment was reportedly
- secured at about'2:50 p.m. with the mast in the full-up positio The licensee's operations and security management initiated actions to verify plant safety and to investigate the circumstances sur-rounding the possible unauthorized operation of refueling equipmen The licensee notified the NRC of these activities et about 12:46 p.m.,
, on September 27, 198 .2 Scope The purpose of this special NRC-inspection was to provide an onsite irJependent safety assessment of the facility status and to evaluate the need for any further actions.
In addition to evaluating the licensee's internal investigation, the inspectors made independent observations of plant equipment and held discussions and interviews with licensee and contractor personne .. . .- - ..
, . -- = . -
.
'
.
These actions included a review of the licensee's immediate actions following discovery of the bent refueling mast as well as the lic~ensee's planned followup action .0 Review of Licensee Actions in Response to Fuel Handling Events of
,.
September 26 - 27, 1985 3.1 Licensee Immediate Action As described in Section 2.1 above, upon discovery of the damaged mast
- at about 9
- 00 a.m. on September 27, 1985, corrective actions were immediately initiated by the licensee. These actions included 1)
unlatching the grapple and returning the refueling bridge to the edge of the spent fuel pool (in preparation for hurricane Gloria), 2)
performing an inventory of spent fuel bundles in the spent fuel pool ,
3) locking the gates to the refueling floor, and 4) implementing special access restricticas (two man rule) to certain plant process
, buildings and room The licensee also initiated an investigation into the cause of the damaged mast and assigned corporate security personnel to perform independent interview Operations personnel performed operability tests of the Reactor Core Isolation Cooling and High pressure Coolant Injection systems. In addition to demonstrating the operability of the two Emergency Diesel Generators, the licensee also performed inspections of electrical distribution equipmen .2 Discussions and Interviews with Personnel The inspectors interviewed the four Boston Edison Company (BECo)
personnel that performed the fuel movement operations on the 7 a.m. -
3 p.m. shift on September 26, 1985 and the two maintenance and two
'
health physics contractor personnel that performed maintenance opera-tions on the refuel floor on the 3 p.m. - 11 p.m. shift on September 26, 1985. The two maintenance personnel on the 3 9.m. - 11 p.m. shift were working on equipment in the spent fuel pool rad they stated that at approximately 4:15 p.m. they noticed that the mast on the crane was i fully extended and bent. They did not notify anyone of the condition of the mast because they assumed it had been left that way during the
' fuel move on the previous shift. The two health physics personnel on the 3 p.m. - 11 p.m. shift were providing technician coverage at a L radiation control point approximately thirty feet from the fuel pool and did not notice the condition of the mast. It was also noted during the interviews with the contractor personnel that only the l hea tu physics personnel were authorized the key to the refuel floor i
and ' Sat maintenance personnel had to be accompanied while in the area by health physics personnel.
.
b
i
_ ._ , . , _ _ . _ . _ , . _ _ , _ . _ . _ _ _ _ , _ _ _
-
.
. -
During interviews, the BECo operations personnel described the fuel movement process and the manner in which the crane is to be secure The BECo personnel stated that they had ungrappeled the last fuel bundle, withdrawn the mast, and centered the trolly on the bridge at the end of the shift. However, after observing a re-enactment on October 2, 1985, (centering the trolly on the bridge with the grapple still engaged to a blade guide to simulate a fuel bundle) they noted that the trolly and mast were in approximately the same condition as they would have been if the last bundle moved was not ungrappled prior to the trolly being centered on the bridge. At that time, they conceded that it was possible that the damage to the mast was caused
,
by failure to ungrapple the last fuel bundle move The results of the interviews support the licensee's conclusion that the damage to the spent fuel pool main mast was most probably a result of operator erro .3 Access Control for' Security and Radiation Protection 3. Special Access Control - Two Man Rule i During the investigation of the incident involving the refuel bridge the licensee implemented a requirement that there be at least two persons present and that they remain
' in visual contact at all times during access to the reactor building, cable spreading room, salt service water bays, the diesel generator rooms, and the 4160v switch gear rooms. The two-man rule applied to all personnel onsite with the exception of selected management personnel and NRC
, personnel. In addition to the two-man rule the licensee also posted security personnel at the entrances of the areas covered by the two-man rule to log personnel into and out of the areas. The inspectors toured the areas and verified that the logging of personnel into and out of the areas was in compliance with the two-man rule as specified by Temporary Procedure No. 85-94, Special Access Restriction, dated September 29, 198 . Radiation Area Key Audit The inspector performed an audit of radiological protection keys designated as "R" keys that are controlled by the .
Health Physics Supervisor and the Operations Superviso The "R" key was the only key required for access to the refueling floor prior to the event. The inspector found that all "R" keys in the'two areas inspected were accounted for at least once per shift and that no "R" keys were missing. No violations were identified.
i
. , _ _ _ -
_ -. _
. _ . . _ _ . _ , ~ . . _
- __
.
, . ,
3.4 Fuel Handling Bridge and Fuel Movement Records Subsequent to the initial briefing by the licensee on September 28,
'
1985, the inspector toured the refueling floor and the fuel handling platform (FHP) to observe the reported damage to the FHP mast. The FHP is a typical arrangement for a boiling water reactor consisting, basically, of 1) a bridge that traverses in an East-West direction (see Attachment B) over the spent fuel pool and the reactor vessel, 2) a trolly (operator platform) attached to the bridge that moves North and South, 3) a control panel attached to the upper section of the mast that can be rotated along with the mast and , 4) the mast which consists of telescoping (up and down) triangular sections that are raised and lowered via a motor driven cable arrangement. During normal operations the bridge and trolly are moved to position the mast over a selected fuel bundle. The mast is then lowered onto the bail handle of the fuel bundle and the grapple fingers on the lower section of the mast are closed under the bail handle. The fuel bundle is then raised vertically until it is clear of the core or
'
spent fuel storage racks and then it can be moved underwater to its
<
new locatio The inspectors observed that the mast had been turned 45 degrees clockwise (facing West) to grapple a bail handle with its axis in a Northeast Southwest orientation; and the trolly had been moved Noroh about 4 to 5 feet (reported by the licensee) resulting in a permanent deformation of the mast of about one foo <
As reported by the licensee, the FHP was located at approximately the X-30 location (see Attachment B) on Friday, September 27, 1985. This appeared to be the same location that it was left on September 26 at 2:50 p.m. when authorized fuel movement was terminated for the da The mast has down and grappled to the bail handle of a fuel bundle located approximately 4 to 5 feet to the left of the trolly location.
,
'
The Senior Reactor Operator (SRO) moved the trolly over the fuel bundle, upgrappled and raised the mast as much as the bend would allow and then moved the bridge and trolly to about location A-30 (see Attachment B) in preparation for the approaching hurricane
- Gloria. The SR0 did not note which fuel bundle the grapple had been attached t >
The inspector made several inspections of the FHP area which included
<
a walk through of the FHP operation and a check of the Operational
- Review Committee (0RC) switch (discussed bejow) circuit operation.
The inspector also performed a visual inspection of fuel bundles in the suspected locations in the X row (bundles X-22 through X-25) that had the correct bail handle orientition. Binoculars and a water box ;
were used to limit distortion. Other locations were also checked to !
observe grapple marks on the bail handles. Grapple marks were
'
apparent on several bundles; however, bundle X-22 had the most prominent grapple marks which were easily discernable from the trolly without the aid of binoculars.
!
!
'
@
.
I
- , . - - - , , - . . - , , n. ,
.
T 4 .
The inspector also reviewed several documents relating to the FHP mechanical and electrical tests performed prior to the latest authorized fuel moves. All records indicated that the FHP was in satisfactory condition to handle fuel in the spent fuel poo Documents reviewed are listed in Attachment As a result of an incident in 1980 the licensee installed an addi-tional interlock (switch) on the FHP. The switch is called the
- Operational Review Committee (ORC) switch and can be locked in a defeat position to prevent fuel movement. Since the ORC switch was not locked on September 26', 1985 when fuel movement was secured (not procedurally required or addressed), and its final position was in question, the inspector reviewed the wiring schematic to determine its functio The intent of the ORC switch is to prevent FHP mast movement (UP) if the mast is loaded to 480 pounds with the ORC switch in the defeat (open) position. The switch is connected in the Normal Mast Up Control Circuit and will give a Normal Up indication if the mast is loaded while the ORC switch in the defeat position and will also prevent upward movement of the mast. The Hoist Loaded light would also energize in that conditio The inspector requested the licensee to verify proper functioning of
. the bridge and mast control circui:. During the test the inspector noted that although the circuit gave the proper indication per the schematic, movement of the control panel would cause both lights to go out indicating an electrical proble The nature and time of t
occurrence of the electrical fault is unknown and may be the result of the bent mast since previous FHP checks indicated satisfactory performanc The licensee committed to procedurally address the ORC switch although the type of damage sustained during this event would not*
- have been prevented since trolly and bridge movement are not affected by the ORC switch. However, if the ORC switch had been locked in the defeat position there would be assurance that no fuel had been moved eliminating the need to verify that all fuel assemblies are in their
- proper location. Video taping of fuel bundle locations is planned by i the licensee to further verify proper location of fuel bundles within the spent fuel poo .5 Plant fours and Condition of Safety Systems The inspectors conducted tours of trie facility to observe both security access controls and the condition of safety systems. Tours of the reactor building, turbine building, intake structure (including salt service water pump rooms), the 'A' 4160v switchgear
'
room, the ' A' battery room, the main control room, the ' A' and 'B'
emergency diesel generator rooms, and the protected area (station yard) were conducted.
'
or
- - -. _
. _ _ _ -
. - . - - .
- _
.
, .
J The inspectors held discussions with licensee management regarding housekeeping conditions in the diesel generator rooms, the status of i testing additional safety related equipment, and method of implementing special access restriction Subsequently, the licensee took action to resolve the concerns in these three areas by cleaning the diesel rooms, performing operabili-1' ty tests of the core spray, residual heat removal, and containment cooling systems, and issuing a station procedure ,eyarding the a special access control The inspector had no further questions.
- 4.0 Quality Assurance (QA) and Quality Control (QC) Involvement The inspector questioned the licensee concerning QA/QC involvement in the recent activities occurring on the refueling floor, and in particular,
.
'
fuel movement in the spent fuel poo The licensee informed the inspector that very limited activity affecting safety had taken place on the refuel-
- ing floor. A review of QA Department Procedure No.18.04, Conduct of
. Reporting of Nuclear Operations Surveillance Monitoring Activities, indi-cated that surveillance of spent fuel movement in the spent fuel pool was not required. No QC inspection or surveillance was in progress during the i refueling bridge operations on September 26-27, 1985. The licensee did i
'
note that a recent QC Surveillance of.the Spent Fuel Rack Lifting Rig (Report No. I-85-49-3A) had been conducted on September 24, 1985. No
abnormal activities relating to fuel movement had been observed by the QC
- inspector at that tim .0 Independent Verification f
- The inspector performed independent verification of plant conditions and
- the licensee's actions. Areas and actions verified included the following:
--
temporary special access restrictions to vital areas (two man rule),
!
--
additional chain and padlock control for the three entrances to the refueling floor,
--
observation of the spent fuel pool and the condition of the refueling bridge equipment,
! --
discussions and interviews with licensee and contractor personnel in the vicinity of the refueling floor on September 26-27, 1985, and
--
the condition of safety equipment including system testing and electrical panel walk-downs.
! No violations were identified.
,
k
- - , . . - - , .---,,,,.w- - - - .-- ,n.,. , ,
. -.
i
.
.
6.0 Findings and Conclusions The inspector determined that there was no apparent damage to any safety equipment. In addition, there was no evidence of other abnormal equipment condition (other than the bent refueling mast) or evidence of unauthorized l activities or disturbance The inspectors confirmed the operability of safety systems through discussions with operators, a review of system surveillance test and verification data. and direct observation of a sampling of system valve
and switch positions and electrical distribution equipmen The inspectors confirmed that there was no unusual or unauthorized release of, or damage to, radioactive material; nor was there evidence of any
"
unusual radiation levels, instrumentation indications, or other adverse radiological consequence The last known movement of spent fuel 1) had been properly authorized by plant management, 2) was being documented via the proper fuel movement procedure (No. 4.3, OPER 25) and associated material balance accounting form (R.E.1), and 3) was being supervised by a licensee representative with an SR0 license, i Although no specific violations of the fuel movement procedare were identified, the inspector noted that the procedure had no provisions for administrative control of a key lock switch (the "0RC" switch) for the
'cain mast normal up relay, or specifying the status of refueling bridge equipment when no longer in use at the end of the day.
- The licensee made a commitment to revise the fuel handling procedure (OPER
,
~ 25) to include instructions for administrative control of the ORC switch and for securing the refueling equipment when not in use. The licensee stated that these revisions would be made prior to the next movement of
, fuel.
! The licensee also stated that additional procedures were expected to be revised following the (unrelated and preplanned) replacement of the refueling bridge in February,1986.
'
No violations of radiological area access control or key control procedures were identified. However, the inspector noted that the e licensee has had a history of problems with the control of radiation area
'
key This area had been under review by the Radiological Oversight Committee but no major changes had resulted prior to this inspection. At the exit
, meeting the licensee committed to initiate plans to install a closed circuit television camera to monitor conditions on the refueling floo The inspector verified that (in the interim) the licensee had installed additional chain and padlock controls for the three accesses to the refueling floor. The licensee also initiated additional improvements for
,
e v - __ -~,-, , . c ,---- - - , , ---
y- - -
vr-- , ,,-- y -m.y e
, . - . .. - - ..- -. . . - - - . = - - - - . .. . . .
- 4
'
i
'
i
- control of radiation area keys in general including moving the key
- cabinet, using large plastic attachments to keep from losing the keys, and
minimizing the number of keys.
^
The licensee's investigation results had not been formally documented by -
the end of the inspection. However, the licensee's preliminary results
- indicated that the most probable cause of the bent mast was due to The licensee further stated that the training and
'
operator error.
- qualifications of the personnel involved would be reviewed in addition to the procedural changes described above.
.; No violations were identified.
- 7.0 Exit Meeting *
i
! Meetings were held on October'1, 1985 and October 2, 1985 with licensee
management personnel (denoted in Section 1) to summarize the purpose,
,'
scope, and inspection findings. At no time during the inspection was written material provided to the licensee by the inspecto l
!
!
!
,
4
i
!
i
,
i j
l
!
! !
$
I
- i
,
f
,
9 m. , , --.--,-..-4 -
,-,r, m ~ r...c,,'-----.,,_.-,-+-y .,3,---py.-_yy7,w,,,_, , ,,9m,,,..,,,,, y,y,._,wy .
,_g,,p.w..,.,,7,_,y w~,,,,y,---- -,,-r-.
,
,
ATTACHMENTS TO INSPECTION REPORT N0. 50-293/85-29 ATTACHMENT A - Pictures and Drawing of Refueling Equipment and Area Gate ATTACHMENT B - Spent Fuel Pool Location Grid Diagram ATTACHMENT C - List of Documents and Tests Reviewed
____ ______ ___ . _ _ _ _ _ - _ _ _ _ . _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ - .
.
.
WY oggyg
, *
^*BLE Rggg 7*, ~*~,, , " ^ A?g
., * 7 t&j',{ns
~<eeeg;q-
Taoq,, -
' '* w plhL__ BLEgEEL
'
h Acce" '
%
L p~
k/ C
,,
m Dr<gyE CE Ag
- LKwAv O W RA'*R'saAssg7 Il
~
s
'
i
),
NCFyg' ~ ~
'
%Troes y,
,
Rerug,ID9 Plag,* % With rUel c'*Pple ynstalygg
_ _ __ _ . - _ _ _ _ - _ _ _ _ _ _ _ _ _ - - _
__ _ _ _ _ - _ _ _ _
.
.
-
ATTACHMENT A j
(50-293/85-29)
R.EF_UELING
_
FLOOR EQUIPMENT
-
? ; :6-
'
.
M= u
-
.
. [ ' , *N} , '
'
,
- . ,
'
! '
p
-
,
'
l .. M sl .{
3 .;
- j' . 4
.
.' -
, .. _
-
~ '
,
.s
,
.,: -
.
,
' ~'
- -
.
,s EQUIPMENT INSIDE REFUELING CONSOLE REFUELING OPERATIONS TROLLEY AND BRIDGE I
g, rp w rg,I: tit - - [-
'-
J g.;, g sTI('%
O - >
g ;g.) III g
)
-
f- -
, (,
-?
- ,.
- . .
-~~.,
'
7. - . .
l % 4*
, _
g/ ,
MAIN MAST OFERATING CONSOLE ENTRANCE GATE TO REFUELING FLOOR
__
__,,,w-.----.- ---,.e-
- _ _ _ _ _ _ _ _ _ _ - . __,-. - _ _ . . _ _ _ _ - _ _ _ .
4 ., . . . . - . . . . . . . . .
(1) He (2) Date MBA INVENT' ACCOUNT (4) Prepared by .
'
(3) h for Change SPENT FL p0L (5) Approved by .
.
15 251128 29 303t 31 n 3't r %31361No tt 42 43 H W
'
FCMA FCMB
-
CHANNEL
. STORAG p e
- -
-
--
-
,
- - - - - - -
-
n p
>
a -
NW m
RACK 3 _~_ ~_ _-._~_
.
_ _ __ . . . __ .
' ~
. .. .
g' g
. .. .
y
~ ~ ~ ~
,oi:3 . s ., > . 2 , .. .r s i. , ,
088880] O@mrssm\
\
,, 880 us [ - - - - - -
s e l -
-
-
-
- -
~
-l
~ ~
- - -
)g ,
- 4 5152 53 5155 % 515B w m r--
.. . . _ _
... _ - _ -_.._ . _ _ . .
- _ . . . . __ .. _ _ _ _ __ . .. ..
_
_
.. .. . .
.
, .
g
,_
,
.
_ . _ _ _
. . _ _ _ _ ..._ __ ._ _ .. ._ _ . _ . .
j _ ..
-
'a _.-_ .-_ -. - . .. .
.
, ,
~
- n
- -
3? > b4
-
% d v t a' vr
_
y y . CASK y
! __ _
i .
E 4 o l 0 ._ - __ _ . . _ ._ __ . ._ _ . . . - _ _ z
.. .
.
_ . ..
_ __ ... . _ _ ,
.
2 ->I g
.
.
- .__ _ _ , ._. _ _ _ . _ .._ .. . . _ _ ._ . _ _ .. . .
,
a
, a
_ _... _ __ _ 3 g
__ .
_ _ . . . _ . ... _ ___ _ _ _ _ _ . _ . . ..
- _ __ ___ _ . .
- i g
- _ .. _ _ _ _ . _ . . . __
_ -. .. _ .
_
gg
.._
__ _ _ _ . . .. __ . ..
a 1
_ . . ..
- .. . . .
_ _
.
_ ._ _ _ . > z -
g
.. _ _
_ _
.
.. _ ._ __ _ . _ . _ .
-i 8
$
' *
s
,
. i_ .. ._ _ . ._ _ ._ _ __ . . . _ _ _ __ *
O O
[... 222dS S _Vd EE4S
' ~ ~' '~
> $ o '
>
. . _ _ .. _
_ _/ 4
.
( A, m
O I 2 3 4 5 6 7 5 9 pil Iz (319 ipK H Si3 20KZ2Z3Z4252w 25D/50313155mS 365DB33404f E43944544?48050515253 5455565758960
> iiiiiiIiiliiil\liII . .
/ _ .. ._ ._ _ _ _ . .. . _ _ . _ .
< 3*
c
. . . . .
{
_~. _ .. _ _ _ .. _ _ _ _ .. ._ .
4 ,
- : m ~. ca.waws .
__ _ _ ._
,
-
_ : . _
- -
. :. :. : _ _
-
- -
_
s i
- -- _
_y ._ _ _ _
.. _ . .. _ . . .. _ ;~ {
!
C temion x-2z ; lmr J : ~/ ~ ~
~:
~ - ~ ~ ~
. ; ~:
~ ~
- ~ .; ,
run. novv
. . _ __
A e ;
= . n.sen osa _ .. _ _ ._ . . . _ _ ._ _ _ y \
]
.
- _ _ . _ _ .. _ . .. __
.
n
? ( AM'A0tiserAT1 fM/) PAM ._ . . ._ _ _ , _ ,_ _ _.__ _ _ __ _ ._
%_ LotATmN ON 9/2b/ . _ . . .. .. . _ . . _ . _ . _ . . .
t x __ _ _ _ . . ._ ._ _ ._ .. .
. . _ . _... _ .
~~~ ~ ~ ~
l _l }l_
~^_
~ ~
k k f~jA> m /*H f PndM JOCATDA/ W} ['% . __ } __ _
l _ } se
~
m
=
ox 9/ n n .r . - - -_ ._ .
\
._ . - - _
= _- _ . . . . . _ _ . .. . .. . . . .._ .
O R ... .
_ _ ... . . ._ _ _.._ _ ... .. _ . . . . . _ _ _ _ .
'
. _
- . _ a . . . . .
w
_ . .. ._ _ . . ._ - .
.
'.
, t i OI L 3 + 5 e. Y 5 3 10 is 42.as si 45 if,41 is ) 202: ZZ 2.5 ZT 25 26 Zi 23 2') 3034 32 35 39 35 .% 37 38 D 46il 4193 4195 469195 M So 73 5153 54 55 56 5da n60
'
*
GATE
__ _ _ _
/1D c* wry \
.
.
. ATTACHMENT C LIST OF DOCUMENTS AND TESTS REVIEWED
-
Failure and Malfunction Report dated September 27, 1985 describing-initial discovery of the damaged mast and latched fuel bundle
-
Initial Special. Instructions regarding access control dated September 27, 1985
-
Temporary Procedure No. 85-94, Special Access Restrictions, dated September 29, 1985
-
Radiation Survey Form (Map No.170 - Refueling Floor) completed at 9:00 a.m. on September 27, 1985
-
Fuel Movement Material Balance Accounting Form (RE.1) No.1054-
,
-
Temporary Procedure No. 85-95, Re-enactment of fuel Pool Incident of September 26, 1985, DRAFT
-
Control Room Operations Log (documenting actions on September 27, 1985 to verify electrical'circui: breaker relays, and both AC and DC vital power supplies
-
3.M.3-8A-1, Inspection / Troubleshooting Electrical Circuits Check List,
: dated September 27, 1985 i
,
-
Radio-Chemistry Analysis Records (Form CH-2) documenting results of both
- influent and effluent sampling of the spent fuel pool water on September i
27, 1985 i
!
.
- . ._ . - . _ . .- _ . _ . - - . . . . _ . _ - . ~ . _ . .
- .
b
..
-
,
l J
- (continued) ATTACHMENT C
-
_ Memo from the Reactor Engineer to the Chief Operating-Engineer dated
. September 27, 1985 documenting an inventory of fuel bundles in the spent
' fuel pool
-
S'urvet ilance Test-Results as follows:
0
. Reactor Core Isolation Cooling Pump Operability and Flow Rate Test
'
*
,
I (9/27/85)
$
j * High Pressure Coolant Injection Pump Operability; and Flow Rate Test (9/27/85)
*
Core Spray Pump Operability Test (9/30/85)
.,
'
j *
Core Spray Motor Operated Valve (MOV) Operability-(9/30/85)
j
'
*
Core Spray System Integrity Surveillance (9/30/85)_
*
Low Pressure Coolant Injection (LPCI) Pump Operability (9/30/85)
j -* LPCI MOV Operability'(9/30/85)
*
Residual Heat Removal System Integrity Surveillance (9/30/85)
). *
Containment Cooling Valve Operability (9/30/85).
,
! -
Refuel'ing Floor Health. Physics Technician log (9/26/85 - 9/27/85)
..
-
Hourly Fire Watch Patrol Log .-L Refueling Floor (9/26/85 - 9/27/85)
F
- .
-Procedure No._4.3,-Fuel-Handling, Revision 31, dated October 17, 1984
'
-
.0PER-25, Revision'31, part of Procedure No. 4.3, a checklist to assure
!: proper _ safeguards have been taken prior to feel movement in the-spent fuel
'
pool (9/18/85)' ,
,
-
.
.
b
r
-
.
.
.
e ,
(continued) ATTACHMENT C l
-
Procedure No. 8.10.5, Refueling Platform Main Mast Interlock Functional Test, Revision 8, April 11, 1984
-
Attachment No. 8.10.5A-1, Refueling Platform Main Mast Interlock Functional Test Signoff Sheet, Revision 8 (9/12/85)
-
Maintenance Request 85-49-2, Perform Preventive Maintenance and Repair Refuel Bridge and Jib Cranes (9/13/85)
.
L
}}