IR 05000293/1985029

From kanterella
Jump to navigation Jump to search
Insp Rept 50-293/85-29 on 850928-1002.No Violation Noted. Major Areas Inspected:Licensee Activities Re Movement of Spent Fuel within Spent Fuel Pool & Condition of Refueling Equipment
ML20138F477
Person / Time
Site: Pilgrim
Issue date: 10/17/1985
From: Bettenhausen L, Briggs L, Jerrica Johnson, Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20138F416 List:
References
50-293-85-29, NUDOCS 8510250273
Download: ML20138F477 (16)


Text

.

.

U.S. NUCLEAR REGULATORY COMMISSION

REGION I

-Report No. 50-293/85-29 Docket N License N OPR-35 Licensee: Boston Edison Company

., 800 Boylston Street Boston, Massachusetts 02199 Facility Name: Pilgrim Nuclear Power Station Inspection At: Plymouth, Massachusetts Inspection Conducted: September 28, 1985'- October 2, 1985 Inspectors: X[

E. Briggs, rM Reactor Engineer

  1. 'dateAM[

_

" =p /o"/ 7- W KSmith/Safegpdsppecialist date l-0% &. kdA J.% ohnson, Chief, Operational Programs lo/lblts'

date Section, 08, DRS Approved by: _

w L. Bettenhausen, Chief, Operations Branch,

/d//7 M date DRS Inspection Summary: Inspection on September 28, 1985 - October 2, 1985 (Report No. 50-293/85-29)

Areas Inspected: Special reactive inspection of licensee activities related to the movement of spent fuel within the spent fuel-pool and the condition of refueling equipment. The inspection involved 114 hours0.00132 days <br />0.0317 hours <br />1.884921e-4 weeks <br />4.3377e-5 months <br /> on site by two region-based inspectors and one superviso Results: No violations were identifie i 8510250273 851018 PDR ADOCK 05000293 PDR G

_ . . _

.

.

.

DETAILS 1.0 Key Persons Contacted

  • B. Eldredge, Chief Radiological Engineer
  • F. Famulari, Quality Control Group Leader J. Kehoe, Corporate Security Officer
  • P. Mastrangelo, Chief Operating Engineer

, **C. Mathis, Nuclear Operations Manager R. Mattos, Station Services Engineer T. Nicholson, Security Supervisor

, **A. Oxsen, Vice President - Nuclear Operation

, **E. Ziemianski, Nuclear Operations Support Manager The inspectot also interviewed other members of the licensee and contractor staff involved with operations, maintenance, security and fire protection.

l

  • ** Denotes personnel present at exit meetings on October 1, 1985 and

,

October 2, 1985 respectivel .0 Background and Scope 2.1- Background At about 9:00 a.m. on September 27, 1985, licensee personnel were

securing equipment on the refueling floor (117 foot elevation reactor building) in preparation for the impending passage of hurricane Gloria and noticed that the main mast en the refueling bridge (over the spent fuel pool) was fully extended and bent. The mast grapple was attached to a spent fuel assembly handle.

i Authorized fuel handling activities were last conducted on the afternoon of September 26, 1985 and the equipment was reportedly

- secured at about'2:50 p.m. with the mast in the full-up positio The licensee's operations and security management initiated actions to verify plant safety and to investigate the circumstances sur-rounding the possible unauthorized operation of refueling equipmen The licensee notified the NRC of these activities et about 12:46 p.m.,

, on September 27, 198 .2 Scope The purpose of this special NRC-inspection was to provide an onsite irJependent safety assessment of the facility status and to evaluate the need for any further actions.

In addition to evaluating the licensee's internal investigation, the inspectors made independent observations of plant equipment and held discussions and interviews with licensee and contractor personne .. . .- - ..

, . -- = . -

.

'

.

These actions included a review of the licensee's immediate actions following discovery of the bent refueling mast as well as the lic~ensee's planned followup action .0 Review of Licensee Actions in Response to Fuel Handling Events of

,.

September 26 - 27, 1985 3.1 Licensee Immediate Action As described in Section 2.1 above, upon discovery of the damaged mast

at about 9
00 a.m. on September 27, 1985, corrective actions were immediately initiated by the licensee. These actions included 1)

unlatching the grapple and returning the refueling bridge to the edge of the spent fuel pool (in preparation for hurricane Gloria), 2)

performing an inventory of spent fuel bundles in the spent fuel pool ,

3) locking the gates to the refueling floor, and 4) implementing special access restricticas (two man rule) to certain plant process

, buildings and room The licensee also initiated an investigation into the cause of the damaged mast and assigned corporate security personnel to perform independent interview Operations personnel performed operability tests of the Reactor Core Isolation Cooling and High pressure Coolant Injection systems. In addition to demonstrating the operability of the two Emergency Diesel Generators, the licensee also performed inspections of electrical distribution equipmen .2 Discussions and Interviews with Personnel The inspectors interviewed the four Boston Edison Company (BECo)

personnel that performed the fuel movement operations on the 7 a.m. -

3 p.m. shift on September 26, 1985 and the two maintenance and two

'

health physics contractor personnel that performed maintenance opera-tions on the refuel floor on the 3 p.m. - 11 p.m. shift on September 26, 1985. The two maintenance personnel on the 3 9.m. - 11 p.m. shift were working on equipment in the spent fuel pool rad they stated that at approximately 4:15 p.m. they noticed that the mast on the crane was i fully extended and bent. They did not notify anyone of the condition of the mast because they assumed it had been left that way during the

' fuel move on the previous shift. The two health physics personnel on the 3 p.m. - 11 p.m. shift were providing technician coverage at a L radiation control point approximately thirty feet from the fuel pool and did not notice the condition of the mast. It was also noted during the interviews with the contractor personnel that only the l hea tu physics personnel were authorized the key to the refuel floor i

and ' Sat maintenance personnel had to be accompanied while in the area by health physics personnel.

.

b

i

_ ._ , . , _ _ . _ . _ , . _ _ , _ . _ . _ _ _ _ , _ _ _

-

.

. -

During interviews, the BECo operations personnel described the fuel movement process and the manner in which the crane is to be secure The BECo personnel stated that they had ungrappeled the last fuel bundle, withdrawn the mast, and centered the trolly on the bridge at the end of the shift. However, after observing a re-enactment on October 2, 1985, (centering the trolly on the bridge with the grapple still engaged to a blade guide to simulate a fuel bundle) they noted that the trolly and mast were in approximately the same condition as they would have been if the last bundle moved was not ungrappled prior to the trolly being centered on the bridge. At that time, they conceded that it was possible that the damage to the mast was caused

,

by failure to ungrapple the last fuel bundle move The results of the interviews support the licensee's conclusion that the damage to the spent fuel pool main mast was most probably a result of operator erro .3 Access Control for' Security and Radiation Protection 3. Special Access Control - Two Man Rule i During the investigation of the incident involving the refuel bridge the licensee implemented a requirement that there be at least two persons present and that they remain

' in visual contact at all times during access to the reactor building, cable spreading room, salt service water bays, the diesel generator rooms, and the 4160v switch gear rooms. The two-man rule applied to all personnel onsite with the exception of selected management personnel and NRC

, personnel. In addition to the two-man rule the licensee also posted security personnel at the entrances of the areas covered by the two-man rule to log personnel into and out of the areas. The inspectors toured the areas and verified that the logging of personnel into and out of the areas was in compliance with the two-man rule as specified by Temporary Procedure No. 85-94, Special Access Restriction, dated September 29, 198 . Radiation Area Key Audit The inspector performed an audit of radiological protection keys designated as "R" keys that are controlled by the .

Health Physics Supervisor and the Operations Superviso The "R" key was the only key required for access to the refueling floor prior to the event. The inspector found that all "R" keys in the'two areas inspected were accounted for at least once per shift and that no "R" keys were missing. No violations were identified.

i

. , _ _ _ -

_ -. _

. _ . . _ _ . _ , ~ . . _

- __

.

, . ,

3.4 Fuel Handling Bridge and Fuel Movement Records Subsequent to the initial briefing by the licensee on September 28,

'

1985, the inspector toured the refueling floor and the fuel handling platform (FHP) to observe the reported damage to the FHP mast. The FHP is a typical arrangement for a boiling water reactor consisting, basically, of 1) a bridge that traverses in an East-West direction (see Attachment B) over the spent fuel pool and the reactor vessel, 2) a trolly (operator platform) attached to the bridge that moves North and South, 3) a control panel attached to the upper section of the mast that can be rotated along with the mast and , 4) the mast which consists of telescoping (up and down) triangular sections that are raised and lowered via a motor driven cable arrangement. During normal operations the bridge and trolly are moved to position the mast over a selected fuel bundle. The mast is then lowered onto the bail handle of the fuel bundle and the grapple fingers on the lower section of the mast are closed under the bail handle. The fuel bundle is then raised vertically until it is clear of the core or

'

spent fuel storage racks and then it can be moved underwater to its

<

new locatio The inspectors observed that the mast had been turned 45 degrees clockwise (facing West) to grapple a bail handle with its axis in a Northeast Southwest orientation; and the trolly had been moved Noroh about 4 to 5 feet (reported by the licensee) resulting in a permanent deformation of the mast of about one foo <

As reported by the licensee, the FHP was located at approximately the X-30 location (see Attachment B) on Friday, September 27, 1985. This appeared to be the same location that it was left on September 26 at 2:50 p.m. when authorized fuel movement was terminated for the da The mast has down and grappled to the bail handle of a fuel bundle located approximately 4 to 5 feet to the left of the trolly location.

,

'

The Senior Reactor Operator (SRO) moved the trolly over the fuel bundle, upgrappled and raised the mast as much as the bend would allow and then moved the bridge and trolly to about location A-30 (see Attachment B) in preparation for the approaching hurricane

Gloria. The SR0 did not note which fuel bundle the grapple had been attached t >

The inspector made several inspections of the FHP area which included

<

a walk through of the FHP operation and a check of the Operational

Review Committee (0RC) switch (discussed bejow) circuit operation.

The inspector also performed a visual inspection of fuel bundles in the suspected locations in the X row (bundles X-22 through X-25) that had the correct bail handle orientition. Binoculars and a water box ;

were used to limit distortion. Other locations were also checked to !

observe grapple marks on the bail handles. Grapple marks were

'

apparent on several bundles; however, bundle X-22 had the most prominent grapple marks which were easily discernable from the trolly without the aid of binoculars.

!

!

'

@

.

I

- , . - - - , , - . . - , , n. ,

.

T 4 .

The inspector also reviewed several documents relating to the FHP mechanical and electrical tests performed prior to the latest authorized fuel moves. All records indicated that the FHP was in satisfactory condition to handle fuel in the spent fuel poo Documents reviewed are listed in Attachment As a result of an incident in 1980 the licensee installed an addi-tional interlock (switch) on the FHP. The switch is called the

Operational Review Committee (ORC) switch and can be locked in a defeat position to prevent fuel movement. Since the ORC switch was not locked on September 26', 1985 when fuel movement was secured (not procedurally required or addressed), and its final position was in question, the inspector reviewed the wiring schematic to determine its functio The intent of the ORC switch is to prevent FHP mast movement (UP) if the mast is loaded to 480 pounds with the ORC switch in the defeat (open) position. The switch is connected in the Normal Mast Up Control Circuit and will give a Normal Up indication if the mast is loaded while the ORC switch in the defeat position and will also prevent upward movement of the mast. The Hoist Loaded light would also energize in that conditio The inspector requested the licensee to verify proper functioning of

. the bridge and mast control circui:. During the test the inspector noted that although the circuit gave the proper indication per the schematic, movement of the control panel would cause both lights to go out indicating an electrical proble The nature and time of t

occurrence of the electrical fault is unknown and may be the result of the bent mast since previous FHP checks indicated satisfactory performanc The licensee committed to procedurally address the ORC switch although the type of damage sustained during this event would not*

have been prevented since trolly and bridge movement are not affected by the ORC switch. However, if the ORC switch had been locked in the defeat position there would be assurance that no fuel had been moved eliminating the need to verify that all fuel assemblies are in their
proper location. Video taping of fuel bundle locations is planned by i the licensee to further verify proper location of fuel bundles within the spent fuel poo .5 Plant fours and Condition of Safety Systems The inspectors conducted tours of trie facility to observe both security access controls and the condition of safety systems. Tours of the reactor building, turbine building, intake structure (including salt service water pump rooms), the 'A' 4160v switchgear

'

room, the ' A' battery room, the main control room, the ' A' and 'B'

emergency diesel generator rooms, and the protected area (station yard) were conducted.

'

or

- - -. _

. _ _ _ -

. - . - - .

- _

.

, .

J The inspectors held discussions with licensee management regarding housekeeping conditions in the diesel generator rooms, the status of i testing additional safety related equipment, and method of implementing special access restriction Subsequently, the licensee took action to resolve the concerns in these three areas by cleaning the diesel rooms, performing operabili-1' ty tests of the core spray, residual heat removal, and containment cooling systems, and issuing a station procedure ,eyarding the a special access control The inspector had no further questions.

4.0 Quality Assurance (QA) and Quality Control (QC) Involvement The inspector questioned the licensee concerning QA/QC involvement in the recent activities occurring on the refueling floor, and in particular,

.

'

fuel movement in the spent fuel poo The licensee informed the inspector that very limited activity affecting safety had taken place on the refuel-

ing floor. A review of QA Department Procedure No.18.04, Conduct of

. Reporting of Nuclear Operations Surveillance Monitoring Activities, indi-cated that surveillance of spent fuel movement in the spent fuel pool was not required. No QC inspection or surveillance was in progress during the i refueling bridge operations on September 26-27, 1985. The licensee did i

'

note that a recent QC Surveillance of.the Spent Fuel Rack Lifting Rig (Report No. I-85-49-3A) had been conducted on September 24, 1985. No

abnormal activities relating to fuel movement had been observed by the QC

inspector at that tim .0 Independent Verification f
The inspector performed independent verification of plant conditions and
the licensee's actions. Areas and actions verified included the following:

--

temporary special access restrictions to vital areas (two man rule),

!

--

additional chain and padlock control for the three entrances to the refueling floor,

--

observation of the spent fuel pool and the condition of the refueling bridge equipment,

! --

discussions and interviews with licensee and contractor personnel in the vicinity of the refueling floor on September 26-27, 1985, and

--

the condition of safety equipment including system testing and electrical panel walk-downs.

! No violations were identified.

,

k

- - , . . - - , .---,,,,.w- - - - .-- ,n.,. , ,

. -.

i

.

.

6.0 Findings and Conclusions The inspector determined that there was no apparent damage to any safety equipment. In addition, there was no evidence of other abnormal equipment condition (other than the bent refueling mast) or evidence of unauthorized l activities or disturbance The inspectors confirmed the operability of safety systems through discussions with operators, a review of system surveillance test and verification data. and direct observation of a sampling of system valve

and switch positions and electrical distribution equipmen The inspectors confirmed that there was no unusual or unauthorized release of, or damage to, radioactive material; nor was there evidence of any

"

unusual radiation levels, instrumentation indications, or other adverse radiological consequence The last known movement of spent fuel 1) had been properly authorized by plant management, 2) was being documented via the proper fuel movement procedure (No. 4.3, OPER 25) and associated material balance accounting form (R.E.1), and 3) was being supervised by a licensee representative with an SR0 license, i Although no specific violations of the fuel movement procedare were identified, the inspector noted that the procedure had no provisions for administrative control of a key lock switch (the "0RC" switch) for the

'cain mast normal up relay, or specifying the status of refueling bridge equipment when no longer in use at the end of the day.

The licensee made a commitment to revise the fuel handling procedure (OPER

,

~ 25) to include instructions for administrative control of the ORC switch and for securing the refueling equipment when not in use. The licensee stated that these revisions would be made prior to the next movement of

, fuel.

! The licensee also stated that additional procedures were expected to be revised following the (unrelated and preplanned) replacement of the refueling bridge in February,1986.

'

No violations of radiological area access control or key control procedures were identified. However, the inspector noted that the e licensee has had a history of problems with the control of radiation area

'

key This area had been under review by the Radiological Oversight Committee but no major changes had resulted prior to this inspection. At the exit

, meeting the licensee committed to initiate plans to install a closed circuit television camera to monitor conditions on the refueling floo The inspector verified that (in the interim) the licensee had installed additional chain and padlock controls for the three accesses to the refueling floor. The licensee also initiated additional improvements for

,

e v - __ -~,-, , . c ,---- - - , , ---

y- - -

vr-- , ,,-- y -m.y e

, . - . .. - - ..- -. . . - - - . = - - - - . .. . . .

  1. 4

'

i

'

i

control of radiation area keys in general including moving the key
cabinet, using large plastic attachments to keep from losing the keys, and

minimizing the number of keys.

^

The licensee's investigation results had not been formally documented by -

the end of the inspection. However, the licensee's preliminary results

indicated that the most probable cause of the bent mast was due to The licensee further stated that the training and

'

operator error.

qualifications of the personnel involved would be reviewed in addition to the procedural changes described above.

.; No violations were identified.

7.0 Exit Meeting *

i

! Meetings were held on October'1, 1985 and October 2, 1985 with licensee

management personnel (denoted in Section 1) to summarize the purpose,

,'

scope, and inspection findings. At no time during the inspection was written material provided to the licensee by the inspecto l

!

!

!

,

4

i

!

i

,

i j

l

!

!  !

$

I

i

,

f

,

9 m. , , --.--,-..-4 -

,-,r, m ~ r...c,,'-----.,,_.-,-+-y .,3,---py.-_yy7,w,,,_, , ,,9m,,,..,,,,, y,y,._,wy .

,_g,,p.w..,.,,7,_,y w~,,,,y,---- -,,-r-.

,

,

ATTACHMENTS TO INSPECTION REPORT N0. 50-293/85-29 ATTACHMENT A - Pictures and Drawing of Refueling Equipment and Area Gate ATTACHMENT B - Spent Fuel Pool Location Grid Diagram ATTACHMENT C - List of Documents and Tests Reviewed

____ ______ ___ . _ _ _ _ _ - _ _ _ _ . _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ - .

.

.

WY oggyg

, *

^*BLE Rggg 7*, ~*~,, , " ^ A?g

., * 7 t&j',{ns

~<eeeg;q-

Taoq,, -

' '* w plhL__ BLEgEEL

'

h Acce" '

%

L p~

k/ C

,,

m Dr<gyE CE Ag

    • LKwAv O W RA'*R'saAssg7 Il

~

s

'

i

),

NCFyg' ~ ~

'

%Troes y,

,

Rerug,ID9 Plag,* % With rUel c'*Pple ynstalygg

_ _ __ _ . - _ _ _ _ - _ _ _ _ _ _ _ _ _ - - _

__ _ _ _ _ - _ _ _ _

.

.

-

ATTACHMENT A j

(50-293/85-29)

R.EF_UELING

_

FLOOR EQUIPMENT

-

?  ; :6-

'

.

M= u

-

.

. [ ' , *N} , '

'

,

. ,

'

! '

p

-

,

'

l .. M sl .{

3 .;

j' . 4

.

.' -

, .. _

-

~ '

,

.s

,

.,: -

.

,

' ~'

-

.

,s EQUIPMENT INSIDE REFUELING CONSOLE REFUELING OPERATIONS TROLLEY AND BRIDGE I

g, rp w rg,I: tit - - [-

'-

  • '

J g.;, g sTI('%

O - >

g ;g.) III g

)

-

f- -

, (,

-?

- ,.

. .

-~~.,

'

7. - . .

l  % 4*

, _

g/ ,

MAIN MAST OFERATING CONSOLE ENTRANCE GATE TO REFUELING FLOOR

__

__,,,w-.----.- ---,.e-

- _ _ _ _ _ _ _ _ _ _ - . __,-. - _ _ . . _ _ _ _ - _ _ _ .

4 ., . . . . - . . . . . . . . .

(1) He (2) Date MBA INVENT' ACCOUNT (4) Prepared by .

'

(3) h for Change SPENT FL p0L (5) Approved by .

.

15 251128 29 303t 31 n 3't r %31361No tt 42 43 H W

'

FCMA FCMB

-

CHANNEL

. STORAG p e

- -

-

--

-

,

- - - - - - -

-

n p

>

a -

NW m

RACK 3 _~_ ~_ _-._~_

.

_ _ __ . . . __ .

' ~

. .. .

g' g

. .. .

y

~ ~ ~ ~

,oi:3 . s ., > . 2 , .. .r s i. , ,

088880] O@mrssm\

\

,, 880 us [ - - - - - -

s e l -

-

-

-

- -

~

-l

~ ~

- - -

)g ,

  • 4 5152 53 5155 % 515B w m r--

.. . . _ _

... _ - _ -_.._ . _ _ . .

_ . . . . __ .. _ _ _ _ __ . .. ..

_

_

.. .. . .

.

, .

g

,_

,

.

_ . _ _ _

. . _ _ _ _ ..._ __ ._ _ .. ._ _ . _ . .

j _ ..

-

'a _.-_ .-_ -. - . .. .

.

, ,

~

n

- -

3? > b4

-

% d v t a' vr

_

y y . CASK y

! __ _

i .

E 4 o l 0 ._ - __ _ . . _ ._ __ . ._ _ . . . - _ _ z

.. .

.

_ . ..

_ __ ... . _ _ ,

.

2 ->I g

.

.

- .__ _ _ , ._. _ _ _ . _ .._ .. . . _ _ ._ . _ _ .. . .

,

a

, a

_ _... _ __ _ 3 g

__ .

_ _ . . . _ . ... _ ___ _ _ _ _ _ . _ . . ..

_ __ ___ _ . .

- i g

_ .. _ _ _ _ . _ . . . __

_ -. .. _ .

_

gg

.._

__ _ _ _ . . .. __ . ..

a 1

_ . . ..

.. . . .

_ _

.

_ ._ _ _ . > z -

g

.. _ _

  • K

_ _

.

.. _ ._ __ _ . _ . _ .

-i 8

$

' *

s

,

. i_ .. ._ _ . ._ _ ._ _ __ . . . _ _ _ __ *

O O

[... 222dS S _Vd EE4S

' ~ ~' '~

> $ o '

>

. . _ _ .. _

_ _/ 4

.

( A, m

O I 2 3 4 5 6 7 5 9 pil Iz (319 ipK H Si3 20KZ2Z3Z4252w 25D/50313155mS 365DB33404f E43944544?48050515253 5455565758960

> iiiiiiIiiliiil\liII . .

/ _ .. ._ ._ _ _ _ . .. . _ _ . _ .

< 3*

c

. . . . .

{

_~. _ .. _ _ _ .. _ _ _ _ .. ._ .

4 ,

- : m ~. ca.waws .

__ _ _ ._

,

-

_ : . _

- -

. :. :. : _ _

-

-

_

s i

-- _

_y ._ _ _ _

.. _ . .. _ . . .. _ ;~ {

!

C temion x-2z ; lmr J  : ~/ ~ ~

~:

~ - ~ ~ ~

.  ; ~:

~ ~

~ .; ,

run. novv

. . _ __

A e  ;

= . n.sen osa _ .. _ _ ._ . . . _ _ ._ _ _ y \

  • -

]

.

- _ _ . _ _ .. _ . .. __

.

n

? ( AM'A0tiserAT1 fM/) PAM ._ . . ._ _ _ , _ ,_ _ _.__ _ _ __ _ ._

%_ LotATmN ON 9/2b/ . _ . . .. .. . _ . . _ . _ . _ . . .

t x __ _ _ _ . . ._ ._ _ ._ .. .

. . _ . _... _ .

~~~ ~ ~ ~

l _l }l_

~^_

                  ~     ~

k k f~jA> m /*H f PndM JOCATDA/ W} ['% . __ } __ _ l _ } se

                                 ~

m

 =

ox 9/ n n .r . - - -_ ._ .

                 \
                          ._  . -  -    _
 =             _-  _ . . . . . _ _  . ..       . .. . . . .._ .

O R ... . _ _ ... . . ._ _ _.._ _ ... .. _ . . . . . _ _ _ _ .

                                  '
                               . _
               -  . _ a    .      . .  .   .

w _ . .. ._ _ . . ._ - .

       .
   '.

, t i OI L 3 + 5 e. Y 5 3 10 is 42.as si 45 if,41 is ) 202: ZZ 2.5 ZT 25 26 Zi 23 2') 3034 32 35 39 35 .% 37 38 D 46il 4193 4195 469195 M So 73 5153 54 55 56 5da n60 '

                           *

GATE __ _ _ _

                 /1D c* wry \
.
.
   . ATTACHMENT C LIST OF DOCUMENTS AND TESTS REVIEWED
-

Failure and Malfunction Report dated September 27, 1985 describing-initial discovery of the damaged mast and latched fuel bundle

-

Initial Special. Instructions regarding access control dated September 27, 1985

-

Temporary Procedure No. 85-94, Special Access Restrictions, dated September 29, 1985

-

Radiation Survey Form (Map No.170 - Refueling Floor) completed at 9:00 a.m. on September 27, 1985

-

Fuel Movement Material Balance Accounting Form (RE.1) No.1054-

     ,
-

Temporary Procedure No. 85-95, Re-enactment of fuel Pool Incident of September 26, 1985, DRAFT

-

Control Room Operations Log (documenting actions on September 27, 1985 to verify electrical'circui: breaker relays, and both AC and DC vital power supplies

-

3.M.3-8A-1, Inspection / Troubleshooting Electrical Circuits Check List,

: dated September 27, 1985 i

,

-

Radio-Chemistry Analysis Records (Form CH-2) documenting results of both

influent and effluent sampling of the spent fuel pool water on September i

27, 1985 i !

.

- . ._  . - . _ . .- _ . _ . - - . . . . _ . _ - . ~ . _ . .
.

b

..

- ,

l J

(continued) ATTACHMENT C
 -

_ Memo from the Reactor Engineer to the Chief Operating-Engineer dated . September 27, 1985 documenting an inventory of fuel bundles in the spent

 ' fuel pool
 -

S'urvet ilance Test-Results as follows:

0

  . Reactor Core Isolation Cooling Pump Operability and Flow Rate Test

'

 *

, I (9/27/85) $ j * High Pressure Coolant Injection Pump Operability; and Flow Rate Test (9/27/85)

 *

Core Spray Pump Operability Test (9/30/85)

.,
'

j * Core Spray Motor Operated Valve (MOV) Operability-(9/30/85) j

'
 *

Core Spray System Integrity Surveillance (9/30/85)_

 *

Low Pressure Coolant Injection (LPCI) Pump Operability (9/30/85) j -* LPCI MOV Operability'(9/30/85)

 *

Residual Heat Removal System Integrity Surveillance (9/30/85) ). * Containment Cooling Valve Operability (9/30/85).

, ! - Refuel'ing Floor Health. Physics Technician log (9/26/85 - 9/27/85) ..

-

Hourly Fire Watch Patrol Log .-L Refueling Floor (9/26/85 - 9/27/85) F

- .
 -Procedure No._4.3,-Fuel-Handling, Revision 31, dated October 17, 1984

'

-
 .0PER-25, Revision'31, part of Procedure No. 4.3, a checklist to assure

!: proper _ safeguards have been taken prior to feel movement in the-spent fuel ' pool (9/18/85)' , ,

   -

. .

b

r

  -
.
.
.

e ,

(continued)  ATTACHMENT C   l
-

Procedure No. 8.10.5, Refueling Platform Main Mast Interlock Functional Test, Revision 8, April 11, 1984

-

Attachment No. 8.10.5A-1, Refueling Platform Main Mast Interlock Functional Test Signoff Sheet, Revision 8 (9/12/85)

-

Maintenance Request 85-49-2, Perform Preventive Maintenance and Repair Refuel Bridge and Jib Cranes (9/13/85)

     .

L }}